  1. Overview pp. 9-16
    System overview, how it works, FID and MS detection
  2. Procedure pp. 17-58
    Installing analyzer, connections, method setup, verification
  3. Procedure pp. 59-66
    Replacing columns, restrictors, Dean's switch tubing
  4. pp. 67-74
    Supplementary reference material and tables
  5. pp. 75-76
    Alphabetical index of topics
  6. p. 73 table, 13 rows
  7. p. 60 table, 3 rows

TUNE PARAMETERS for SN:

ParameterValue
EMISSION34.610
ENERGY69.922
REPELLER19.904
IONFOCUS84.463
ENTRANCE_LE22.000
EMVOLTS776.471
AMUGAIN1693.000
AMUOFFSET119.938
FILAMENT1.000
DCPOLARITY0.000
ENTLENSOFFS18.071
MASSGAIN-694.000
MASSOFFSET-36.000

Значения приведены дословно; строка 'END OF TUNE PARAMETERS' и последующие служебные строки в таблицу не включены.

Table 1 Column and restrictor tube routing

ItemEnd 1End 2
Column 1: (forward column)S/S inletDean’s switch plate middle fitting
Column 2: (rearward column)Pass the column through the cryo trap, from bottom to top, then on to the Dean’s switch plate top fittingMSD
FID Restrictor tube:Dean’s switch plate bottom fittingFID

Note that Restrictor tube length is critical: it must be 31.2 ±0.1 cm in length after trimming and ends preparation

Engineering Facts

14 facts · every claim linked to a page
Selection

The analyzer is factory-configured with a specific column set, so column selection is fixed by the factory configuration rather than free.

Knowing the exact primary column part number and dimensions is required to order spares and to reproduce the method.

Source
“Primary column (DB-1ms, P/N 122-0112, 0.25-mm ID, 15-m length, 0.25-µm film thickness)”
Selection

The secondary column is a DB-17ms of defined dimensions, which must match the method for the heart-cut to work.

Replacement columns must match this specification or the cut times and chromatography will shift.

Source
“Secondary column (DB-17ms, P/N 122-4712, 0.25-mm ID, 15-m length, 0.25-µm film thickness)”
Installation

Hydrogen must not be used as carrier gas with this product because of tube breakage risk.

Carrier gas selection is constrained at installation; helium must be plumbed to the inlet.

Source
“Hydrogen should not be used as carrier gas with this product due to possibility of tube breakage.”
Installation

The cryo trap requires a dedicated air supply connected at the rear fitting with proper swaging hardware.

The installer must provide a 1/4-inch air line and fittings at the correct rear location.

Source
“Connection is made at a 1/4-inch plastic tube found at the lower-right rear of the GC”
Installation

Only air may be used as coolant for the cryo trap; no other coolant is permitted.

Prevents selection of alternative coolants such as nitrogen or CO2 that would violate the design.

Source
“Air, as described here, is the only coolant to be used with this device.”
Installation

The coolant air must be oil- and moisture-free and supplied with high unrestricted flow.

Air quality and flow capacity determine whether trap cooling meets the required rate.

Source
“Supplied air must be oil- and moisture-free.”
Installation

Cryo trap air pressure must be set to 100 psig with a stated minimum.

The air supply regulator must be capable of this pressure range for correct trap cooling.

Source
“set air pressure to 100 psig (689.5 kPa) {minimum of 40 psig (276 kPa)}”
Installation

The GC needs a stable AC source able to hold rated voltage at full rated wattage for fast oven ramps.

Site power must be verified before installation to avoid oven heating faults.

Source
“Your GC requires a stable AC power source to insure rapid, controlled oven heating rates required by this application.”
Operation

The Dean's switch valve is off by default and only diverts flow to the trap/MSD during the cut window.

Operators must understand the valve state to interpret the Dean's switch status monitor and cut timing.

Source
“The Dean’s switch valve is normally in its ‘Off’ state such that carrier flow from the inlet is passed to the FID.”
Operation

Cut times are critical and may need repeated trials to find the best average value.

Method setup requires iterative cut-time determination, not a one-shot setting.

Source
“Because a correct cut time is so critical to method success, you may want to repeat this process multiple times to come up with an average “best” cut times.”
Operation

System drift from column aging or trimming requires periodic re-adjustment of cut times and trap times.

Ongoing method maintenance is required; cut times are not permanent settings.

Source
“Expect to revisit your cut times and make adjustments as needed”
Operation

The trap must reach 100 °C before the start cut time or THC trapping is degraded.

Cooling performance directly affects analytical recovery and must be monitored.

Source
“the trap must be at 100 °C by just before your start cut time”
Performance

The MS vacuum system must hold 10-3 torr or better during post-run backflush, which rules out diffusion pumps.

Pumping system selection is constrained by the high Column 2 flow during backflush.

Source
“only turbopumping systems have sufficient capacity.”
Maintenance

Backflush duration is set to give at least five void times through Column 1 for adequate cleanup.

Explains why the post-run time is fixed and how to judge if it must be changed after modifications.

Source
“3 minutes is chosen as the time period based upon wanting a minimum of 5 “void times” (“holdup times”) through Column 1”