The unit covers an operating temperature range of 80 to 425 °C, so it must be matched to the process temperature window.
Defines whether the thermostat can serve the intended high-temperature process at all.
Source
“Operating temperature range
80...425 °C”
Installation
The power supply must be 200–240 V single- or two-phase at 50/60 Hz with a 16 A maximum current and 16 A fuse.
Determines site electrical supply, breaker sizing and cabling before installation.
Source
“Power supply requirement
200-240V 1~/2~ 50/60Hz
max. current
16 A
Fuse
16 A”
Installation
Heating power depends on the actual supply voltage, dropping from 3 kW at 230 V to 2.2 kW at 200 V.
Low-voltage sites will not achieve the nominal heating performance, affecting heat-up time calculations.
Source
“Heating power at 230V
3 kW”
Installation
The cooling water connection is a G1/2 male thread, which must be provided for on site.
Needed to plan the cooling water piping and fittings before commissioning.
Source
“Cooling water connection
G1/2 male”
Installation
The unit requires at least 3 l filling capacity and has a 2.9 l expansion volume, which sets the minimum fluid charge.
Used to size the thermal fluid charge and expansion vessel behaviour.
Source
“min. filling capacity
3 l
Volume of expansion
2,9 l”
Installation
The controller is connected to the machine by a cable of approximately 5 m, which constrains where the controller can be placed.
Affects layout of the operating position relative to the thermostat.
Source
“Length of cable between machine and controller approx. 5m.”
Safety
The expansion tank lid can be fixed and has connections for a nitrogen blanket limited to 0.2 bar maximum pressure.
Important for inerting high-temperature fluids and for respecting the pressure limit of the expansion vessel.
Source
“The lid has connections for a nitrogen blanket (maximum pressure 0,2 bar)”
Safety
Additional heaters with over-temperature protection are fitted for the expansion vessel and internal pipework.
Confirms built-in protection against overheating in the expansion and piping sections.
Source
“Additional heaters with over-temperature protection for expansion vessel and internal pipework”
Installation
Voltage and frequency tolerances are ±10 % only if they do not run in opposite directions, e.g. -10 % voltage with +3 % frequency is not allowed.
Site power quality must be checked against this combined tolerance rule before connection.
Source
“Voltage + / - 10%, as long as the frequency tolerance does not run in the opposite direction.”
Compliance
The equipment is EMC class A group 1, so it is intended for industrial environments and may cause radio interference in residential areas.
Affects installation location and EMC planning for the surrounding equipment.
Source
“Classification (disturbance) to EN55011: Class A, Group 1”
Installation
External branch circuit protection according to UL 489 is required.
The panel builder must provide a UL 489 listed breaker in the supply circuit.
Source
“External branch circuit protection according to UL 489 required.”
Installation
Single- and two-phase devices are delivered with a power cable and country-specific plug that must be specified at ordering.
The correct plug type must be stated on the order to avoid rework at site.
Source
“Single / two-phase devices (100V to 240V) --> with power cable and country-specific plug (please specify when ordering)”
Operation
The unit is hydraulically closed, so no oil vapour escapes into the laboratory atmosphere.
Relevant for lab air quality and for choosing this unit for high-temperature oil operation.
Source
“hydraulically closed: No oil vapour.”
Performance
The circulation pump delivers up to 31 l/min at a maximum delivery pressure of 1 bar.
Used to check whether the external circuit pressure drop can be overcome.
Source
“max. delivery
31 l/min
max. delivery pressure
1 bar”