Opencombokjeldahlman
Technical Reference Summary
Covered Models & Document Scope
Open Combination (Macro) Kjeldahl Systems, models 21232 Series, 21233 Series, 21236 Series, 21237 Series. Model numbers ending in 01 are 115 V; ending in 02 are 230 V; ending in 03 are 230 V three-phase. Units are supplied with either an Acid Fume Blower Exhaust System or an Acid Fume Water Aspirator Exhaust System (customer-selected option). Systems may have 6, 12 or 18 heaters per rack; 12- and 18-heater racks use two or three 6-column distillation manifolds connected in series. Example catalog number 2123202 is a Six Place Open Combination Macro-Kjeldahl System.
Section-by-Section Technical Breakdown
Describes the main functional components of the system: 600 W electric heaters with infinite controls, the lower CPVC fume removal manifold with Teflon nipples, the two alternative acid fume exhaust systems (blower or water aspirator), the distillation cooling-water temperature gauge, and the six-column distillation condensation manifold.
- 600-watt heaters are used in both the lower digestion rack and upper distillation rack; infinite control switches regulate each heater.
- Curved heater elements match the round base of Kjeldahl flasks for faster, more even heat; the digestion heater assembly can be moved closer to or away from the fume removal manifold to accommodate different flask sizes.
- Lower fume removal manifold is CPVC with heat-resistant Teflon nipples that extend into the flask opening; flasks are oriented at 45° to promote condensation and refluxing during the 45+ minute digestion.
- Acid Fume Blower Exhaust System: direct-drive blower with corrosion-resistant impeller on the left side; 6" exhaust stack must connect to leak-tight PVC ductwork venting 10 ft (3 m) above the building roof.
- Acid Fume Water Aspirator Exhaust System: draws vacuum in the digestion manifold, dissolves acid fumes in water and flushes to a 3-inch drain; requires 3/4" NPT water connection at 60 psig and 6–8 gpm; includes an air-vent pipe that must be ducted to the roof.
- Distillation cooling water temperature is indicated on a thermometer at the water outlet of the distillation manifold; flow is adjusted with a valve handle below the distillation heaters.
- Distillation condensation manifold has epoxy-coated steel outer columns and stainless steel inner columns; each six-column manifold has 3/4" NPT tap water inlet and outlets.
Covers factory wiring by model suffix, voltage/amperage requirements, and the steps for connecting the facility electrical supply to the main breaker box. Wiring must conform to local codes and be performed by a qualified electrician, with an earth ground provided.
- Model numbers ending in 01 are 115 V; ending in 02 are 230 V; ending in 03 are 230 V three-phase.
- Amperage requirements vary with the number of heaters per digestion rack.
- Main line lead terminals are identified in the breaker box; connections must be made accordingly.
- Provide an electrical ground per code; check panel and breakers for loose connections before applying power.
- After wiring, reinstall the box cover, power the breaker box and reset breakers to check circuits.
Specifies plumbing requirements for the distillation cooling-water manifold, including connection sizes, minimum supply line, flow rate, drain back-pressure restrictions, and the need for a chiller when ground water exceeds 80°F (27°C).
- All plumbing connections and components must be free of foreign material before final connections.
- Tap water inlet and outlet connections are 3/4" NPT; supply line should be minimum 1/2" ID.
- Required cooling water flow through the condensation columns is 6–8 gallons (23–30 liters) per minute.
- 12- or 18-heater systems include two or three 6-column manifolds connected in series.
- The distillation manifold outlet plumbing must be free of back pressure to avoid restricting cooling water flow.
- If equipped with the water aspirator option, do not connect the distillation water drain to the aspirator drain unless provisions handle the larger water volume without backup over the aspirator vent line.
- Distillation manifold discharge water is not acid contaminated and may go to standard drain lines.
- For ground water above 80°F (27°C), a recirculation water chiller system is required for sufficient condensation.
Details installation requirements for the water aspirator acid fume removal option: water supply pressure, drain sizing and acid resistance, roof venting to prevent airlock, and precautions against back pressure and trap placement.
- 3/4" NPT aspirator connection must be connected to a 3/4" supply line with a minimum of 60 psi line pressure.
- Aspirator discharge terminates with a 3" dia. PVC coupling to drain and a 1-1/2" dia., 45° vent coupling for connection to an air roof vent.
- Aspirator drain must be acid proof and capable of carrying up to 6 gpm (23 lpm) without backing up over the 45° air vent connection.
- The 1-1/2" dia. vent line must be vented to the roof and be of acid-resistant material; it prevents airlock and back pressure in the fume removal manifold.
- Drain line must be free of back pressure to prevent closing of the atmosphere vent and stopping fume removal.
- The water ejector drain should be a sealed installation to avoid fumes in the laboratory.
- The water nozzle position inside the aspirator is factory set and should not require field adjustment under normal conditions; check periodically.
- Do not locate a trap directly below the water ejector stub, or water may back up into the air vent and stop fume removal.
Covers duct connection to the blower, sealing of the flexible coupling, condensate drain handling, and the blower airflow exhaust volume and velocity test based on ANSI/ASHRAE 51-1999.
- Exhaust duct connection on top of the blower is sized for 6" nominal (6-5/8" O.D.) vent duct; a short 6" PVC pipe and flexible coupling with clamps are supplied.
- Joints under the flexible coupling must be sealed with acid-resistant sealant (silicone or acid-resistant cement) before tightening clamps.
- Bottom of the blower housing has a condensate drain and corrosion-resistant tubing; condensate is concentrated acid and must be collected in a closed acid-proof container or plumbed to an acid-resistant drain.
- Blower airflow exhaust volume requirement: 25 CFM; average airflow velocity: 117 feet per minute.
- Airflow test uses the "Pitot Traverse in Inlet Duct" method per ANSI/ASHRAE 51-1999; velocity measurements at 48" from the blower using a 6-point duct traverse pattern.
- A 6" diameter duct is sufficient for a duct run not exceeding 60 feet; count each 90° elbow as 12 feet of equivalent length.
- If equivalent duct length exceeds 60 feet, it may be necessary to increase duct size to compensate for friction loss.
- Acid-resistant duct (PVC or fiberglass recommended) must be used; ductwork must be supported independent of the Kjeldahl system to avoid distortion of the blower housing.
Describes the stainless steel drip shield around the digestion heaters and the drip tube for draining acid spills.
- Digestion heaters are located in a stainless steel drip shield resistant to acid attack.
- Liquid acid spills can be drained to an acid-resistant container via the drip tube on the left side of the digestion rack.
Identifies the glassware components and their arrangement: connecting bulb, rubber tubing, delivery tube, receiving flask, distillation manifold and distillation flask.
- Connecting bulbs and delivery tubes are included with Macro Kjeldahl Systems.
- Customer must purchase preferred size of Kjeldahl flasks, one-hole rubber stoppers and distillate receiving flasks.
- Figure 2-8 shows the assembly of connecting bulb, rubber tubing, delivery tube, receiving flask, distillation manifold and distillation flask.
Provides the start-up sequence for digestion and distillation, including flask size accommodation, preheating, fume removal suction verification, cooling water temperature limits, and rinsing of condensing tubes.
- System is designed for 500 or 800 ml Kjeldahl flasks; digestion heaters move forward or backward on the runway to accommodate either size.
- Turn heat controllers to setting on both digester and distillation racks if used simultaneously; wait approximately 5 to 10 minutes for proper preheating.
- Start the acid fume removal blower or water aspirator; place a small tissue paper over the digestion manifold nipple—suction should hold a 2" x 2" (51 mm x 51 mm) tissue paper in place.
- Begin distillation cooling water and check for leaks; cooling water temperature should not exceed 80°F (27°C).
- Regulate water flow with the control valve and watch the thermometer.
- Rinse inner stainless steel condensing tubes by boiling nitrogen-free water in Kjeldahl flasks attached to the condensation columns before commencing distillation.
Gives cleaning procedures to preserve appearance and equipment life, including neutralization of sulfate buildup with weak sodium hydroxide solution.
- Wash equipment with a weak sodium hydroxide solution and rinse with clear water.
- Sulphate, a salt of sulfuric acid, may build up between the channel support and the fume removal manifold; neutralize periodically with weak sodium hydroxide solution.
Explains how suction is adjusted for each exhaust system type and the annual blower inspection requirement.
- Water Aspirator Exhaust System: suction is adjusted by changes in water supply flow rate; suction may be decreased by reducing flow rate.
- Blower Exhaust System: no adjustment is required on suction pressure at the manifold; inspect blower fan annually for debris and proper operation.
Covers removal of obstructions from the exhaust system by steam cleaning and lubrication requirements for the direct-drive blower motor.
- Reduced nipple suction can be caused by obstruction in the exhaust system; obstructions can usually be washed from the fume pipe, blower housing or water ejector by boiling water in flasks on the digestion heaters with the blower or aspirator running to draw steam through.
- Lubricate the direct-drive motor per manufacturer's recommendations for heavy-duty usage by adding minimal drops of S.A.E. 10 automotive-type oil annually or at least every 1500 hours of operation.
- CAUTION: Do not oil excessively.
Provides cleaning and restoration procedures for the stainless steel drip shield after acid spills.
- Promptly wash down all major acid spills contained by the shield.
- Periodically clean the stainless surface with any residential stainless steel sink cleaning compound.
- After cleaning, renew bright shiny appearance by lightly sanding with 220 grade emery paper.
Lists part numbers for electrical heaters, heater controls, blower motor and blower components, water ejector nozzle, and miscellaneous hardware.
- Heater controls: 1315400 (115 V infinite), 1315500 (230 V infinite); knob 1870200.
- Heater elements: 2033100 (115 V, 600 W, package of 6), 2033200 (230 V, 600 W, package of 6).
- Blower motors: 1200000 (1/3 HP, 115 V, 60 Hz), 1203200 (1/3 HP, 230 V, 60 Hz), 1203600 (1/3 HP, 230 V, 50 Hz).
- Blower parts: 2053900 housing assembly, 1451300 wheel, 2054500 bearing assembly, 2055500 shaft (belt drive only), 1851800 shaft bearing (belt drive only), 1850500 adjustable sheave (belt drive only), 1851100 V-belt (drive only).
- Other parts: 2053000 water ejector nozzle, 2165800 Teflon nipple, 2056600 ceramic nipple, 1662200 grommet 1/2 ID x 1-1/2 OD, 2164000 motor shield.
Provides a reference titrimetric TKN method covering scope, apparatus, reagents, digestion, distillation, titration, and calculation, including protein conversion factors.
- Method uses Macro-size glassware (500–800 ml flasks) and a digestion apparatus with multiple 600 W electric burners and fume removal manifold.
- Preheated burners should bring 250 ml of water at 25°C to a rolling boil within 5 minutes; condensation columns should cool distillate to 75°F (23.8°C).
- Digestion: sample 0.250–1.000 g; add 20 ml sulfuric acid, 0.04 g CuSO4, 15 g K2SO4, 8–10 boiling stones; digest until clear (pale green tint), then boil an equal length of time (total approx. 1 hr).
- Distillation: add 100 ml of 45% sodium hydroxide without mixing, connect flask immediately, swirl, and distill until all NH3 is transferred (>8–10 minutes).
- Titration: use 0.02 or 0.10 N standardized H2SO4; titrations should require at least 15 ml of titrant to be accurate; record to nearest 0.05 ml.
- Calculation: %N = (ml H2SO4 sample − ml H2SO4 blank) × normality H2SO4 × 1.4007 / weight of sample in grams.
- Protein factors: 5.7 for bread, wheat and wheat flour; 6.25 for other grains; 6.38 for milk; 6.25 for unknown source.
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Model numbers ending in 01 are 115 V; ending in 02 are 230 V; ending in 03 are 230 V three-phase. p.10 ↗ | Select the correct facility electrical supply and branch protection based on the model suffix before installation. | All 21232/21233/21236/21237 series |
| 600-watt heaters are used in both the lower digestion and upper distillation racks, regulated by infinite control switches. p.6 ↗ | Each heater circuit draws approximately 5.2 A at 115 V or 2.6 A at 230 V; size branch circuits and breaker box accordingly. | All models |
| Distillation cooling water connections are 3/4" NPT with a minimum 1/2" ID supply line and 6–8 gallons (23–30 liters) per minute flow. p.11 ↗ | Plumbing must be sized to deliver this flow to each six-column manifold; insufficient flow will impair condensation. | All models |
| Cooling water temperature must not exceed 80°F (27°C); above this, a recirculation water chiller system is required. p.7 ↗ | Verify ground water temperature at the installation site; if above 80°F, include a chiller in the facility design. | All models |
| Water aspirator requires a 3/4" NPT connection with minimum 60 psi line pressure and 6–8 gpm flow. p.7 ↗ | Confirm facility water pressure and flow capacity before selecting the water aspirator exhaust option. | Models with Water Aspirator Exhaust System |
| Water aspirator drain must be acid-proof and capable of carrying up to 6 gpm (23 lpm) without backing up over the 45° air vent; vent line is 1-1/2" dia. and must vent to roof. p.12 ↗ | Drain and vent routing must be designed to prevent back pressure and airlock; do not locate a trap directly below the water ejector stub. | Models with Water Aspirator Exhaust System |
| Blower exhaust duct connection is 6" nominal (6-5/8" O.D.); a 6" duct is sufficient for a run not exceeding 60 feet equivalent length, counting each 90° elbow as 12 feet. p.14 ↗ | Calculate equivalent duct length including elbows; increase duct size if the run exceeds 60 feet. | Models with Acid Fume Blower Exhaust System |
| Blower airflow exhaust volume requirement is 25 CFM with average airflow velocity of 117 feet per minute, measured per ANSI/ASHRAE 51-1999 Pitot traverse at 48" from the blower. p.14 ↗ | Use this as the acceptance criterion for blower airflow verification after installation. | Models with Acid Fume Blower Exhaust System |
| Blower exhaust stack must be connected to leak-tight PVC ductwork venting 10 ft (3 meters) above the building roof. p.7 ↗ | Roof penetration and stack height must meet this requirement to safely discharge acid fumes. | Models with Acid Fume Blower Exhaust System |
| Flexible coupling joints on the blower must be sealed with acid-resistant sealant (silicone or acid-resistant cement) before tightening clamps. p.14 ↗ | Prevents leakage of acid condensate at the duct connection. | Models with Acid Fume Blower Exhaust System |
| Blower condensate drain produces concentrated acid; collect in a closed acid-proof container emptied regularly or plumb to an acid-resistant drain. p.14 ↗ | Provide appropriate secondary containment and acid-resistant drain materials. | Models with Acid Fume Blower Exhaust System |
| Suction at the digestion manifold should hold a 2" x 2" (51 mm x 51 mm) tissue paper over the nipple. p.17 ↗ | Use this as a simple field check of fume removal suction at start-up. | All models |
| Direct-drive blower motor should be lubricated with minimal drops of S.A.E. 10 automotive-type oil annually or at least every 1500 hours of operation; do not oil excessively. p.18 ↗ | Include motor lubrication in the preventive maintenance schedule. | Models with Acid Fume Blower Exhaust System |
| System accommodates 500 or 800 ml Kjeldahl flasks; digestion heaters move on the runway to suit either size. p.17 ↗ | Order flasks separately in the chosen size and adjust heater position before operation. | All models |
| Maximum sample size is up to 5 grams due to digestion/distillation flask size; higher organic content requires smaller sample sizes. p.6 ↗ | Select sample size based on organic load to avoid vigorous digestion reactions. | All models |
| Digestion flasks are oriented at 45° to the fume removal manifold to promote condensation and refluxing during the 45+ minute digestion. p.6 ↗ | Maintain this orientation to prevent samples from boiling dry. | All models |
| 12- or 18-heater systems include two or three 6-column manifolds connected in series. p.11 ↗ | Plumbing and flow capacity must account for series-connected manifolds. | 12- and 18-heater models |
| Preheated burners should bring 250 ml of water at 25°C to a rolling boil within 5 minutes; condensation columns should cool distillate to 75°F (23.8°C). p.24 ↗ | Use these performance criteria to verify heater and condenser function. | All models |
| Titration should require at least 15 ml of titrant to be accurate; record ml H2SO4 to at least nearest 0.05 ml. p.26 ↗ | Select standardized acid normality (0.02 or 0.10 N) appropriate to expected nitrogen level. | All models |
| Protein conversion factors: 5.7 for bread, wheat and wheat flour; 6.25 for other grains; 6.38 for milk; 6.25 for unknown source. p.26 ↗ | Multiply calculated %N by the appropriate factor for the sample matrix. | All models |
Faults & Troubleshooting
| Code / Symptom | Possible Cause | Remedy | Note |
|---|---|---|---|
| Suction in the nipples is reduced p.18 ↗ | Obstruction within the exhaust system (fume pipe, blower housing or water ejector) | Wash obstructions from the fume pipe, blower housing or water ejector by boiling water in a number of flasks placed on the digestion heaters with the blower or water aspirator in operation to draw steam through the fume pipe. | Exhaust Systems Maintenance |
| Water may backup into the air vent and stop the fume removal through your exhaust manifold p.13 ↗ | Trap located directly below water ejector stub | Do not locate trap directly below water ejector stub. | Figure 2-5 note |
| Water backing up over the aspirator vent line p.11 ↗ | Distillation water drain connected to the aspirator drain without provisions for the larger water volume | Do not connect the distillation water drain to the aspirator drain unless provisions are made to handle the larger water volumes without water backing up over the aspirator vent line. | Tap Water Supply / Distillation Manifold |
| Airlock within the water aspirator p.7 ↗ | Air-vent pipe not ducted to the roof | Duct the air-vent pipe to the roof of the building. | Component Identification |
| Closing of the atmosphere vent and stopping of acid fume removal through the manifold p.12 ↗ | Back pressure in the drain line | Ensure the drain line is free of back pressure. | Water Aspirator Exhaust System |
| Leakage of acid condensate at the flexible coupling p.14 ↗ | Joints under the flexible coupling not sealed | Seal joints with acid-resistant sealant (silicone or acid-resistant cement) before tightening clamps. | Acid Fume Blower Exhaust System |
| Distortion of the blower housing p.15 ↗ | Exhaust ductwork not supported independently of the Kjeldahl System | Support the exhaust ductwork independent of the Kjeldahl System. | Acid Fume Blower Exhaust System |
| Sulphate buildup between the channel support and the fume removal manifold p.18 ↗ | Salt of sulfuric acid accumulating | Neutralize periodically with a weak solution of sodium hydroxide to keep the unit clean. | Clean-Up and Cosmetic Guidelines |
| Discoloration and eventual marring of the drip shield surface p.19 ↗ | Acid spills | Promptly wash down major acid spills; periodically clean with residential stainless steel sink cleaning compound; lightly sand with 220 grade emery paper to renew appearance. | Drip Shield |
| Sample foaming up into neck of flask p.25 ↗ | Heat setting too high during initial digestion | Lower the burner heat setting to prevent foaming; once sample comes to a smooth rolling boil, return heat setting to maximum. | Appendix C, 5.2.2 |
| Black specs in the flask neck p.25 ↗ | Sample splashing during digestion | Rotate the flask 180 degrees to allow refluxing acid to rinse the internal flask surface. | Appendix C, 5.2.2 |
| K2SO4 salt solids forming p.25 ↗ | Digestion mixture cooling without dilution | Allow digestion mixture to cool and carefully add 50 ml of distilled water; all salt crystals must be dissolved before proceeding; if necessary partially reheat and agitate. | Appendix C, 5.2.2 |