A 100 L — instruction manual

Technical Reference Summary

Covered Models & Document Scope

Pfeiffer Vacuum A 100 L / A 100 L ES multi-stage dry Roots pump operating instructions (EN, 62 pp.). Covers part-number families A100L3XXXX and A100L4XXXX (load-lock/transfer chamber pumping) and A100L5XXXX (A 100 L ES model with 'Energy Saving' option reducing energy consumption by ~50%). Document covers all models/variants; features vary per unit.

Section-by-Section Technical Breakdown

pp. 17
Product Description and Human/Machine Interface

Compact multi-stage dry Roots pump for load-lock/transfer chambers (semiconductor, photovoltaic) and turbomolecular roughing; no preventive maintenance required. HMI includes indicator lights, time counter, Loc/Rem switch, ON/OFF circuit breaker, remote and RS-232/RS-485 connectors, water/N2 connections. Electronic monitoring handles temperature alarm/warning.

  • A 100 L ES 'Energy Saving' option cuts energy consumption by 50%, auto-activated per pumping conditions.
  • Scope of delivery: pump, 2 water connectors, power cable with female connector, socket mounting flange, 3× CHc M8x16 screws + washers, lifting-hook guide, manual.
  • Pump delivered with oil charge filled; do not modify oil level or drain (overhaul-only operation).
pp. 18-22
Installation (Set-up, Stacking, Seismic, Water/N2 Circuits, Pumping Line)

Horizontal installation on feet with spirit level; frame attachment with ≥4 M10x25 grade 8-8 screws at 40 N·m. Two pumps can be stacked using brackets (M8x16 screws, 22 N·m); seismic installation uses 4 anchored brackets (40 N·m fixing screws, only lower pump anchored when stacked). Water and nitrogen circuits have defined connector types; pumping-line best practice covers isolation valves, flexible tubes and leak testing.

  • Frame fixing: ≥4 M10x25 grade 8-8 screws, torque 40 N·m.
  • Stacking screws: 3× CHc M8x16 + washers, torque 22 N·m.
  • Seismic brackets: 4 pcs at 'SEISMIC TIE DOWN' label positions, supplied screws torque 40 N·m; floor bolts are customer-supplied.
  • Water inlet = female connector, outlet = male connector; use regulated (softened) water; filter inlet if solid pollution spec cannot be met.
  • Nitrogen tubing: 6 mm OD / 4 mm ID pipe; N2 IN port is 1/8 NPT; CDA may replace N2 if pumped gases are inert.
  • Water max pressure label: 101 PSI (7 bar).
  • Connected chambers must withstand 1·10⁻³ hPa absolute negative pressure.
  • Inlet line: as short/straight as possible, ID ≥ inlet flange ID.
  • Exhaust line components must be rated above max pump-generated pressure.
pp. 23-25
Remote Control via 16-pin and 19-pin Connectors

Both connectors provide start/stop logic input, 0–10 V rotation frequency setpoint (0 V = max frequency, 10 V = min, requires Rem mode) and NO dry-contact status outputs. Contacts rated max 50 V / 1 A, must be wired per SELV rules. State tables map contact closures to pump running/stopped/warning/alarm conditions.

  • 16-pin: S1 (1-2) start/stop (24 VDC = start, 0 V = stop); A2 (15-16) speed setpoint.
  • 16-pin outputs: 3-4 pump status, 7-8 warning, 9-10 alarm, 11-12 reserved, 13-14 isolation valve authorization.
  • 19-pin: S1 (A-B) start/stop (15–24 VDC = run); A2 (R-S) setpoint; +15 VDC (25 mA) and 15–24 VDC supplies available.
  • 19-pin outputs add second warning contact (G-H) and pump failure contact (T-U).
  • Contacts open on fault (NO logic); max 50 V / 1 A.
pp. 25-27
Electrical Connection and Mains Installation

Pump has ON/OFF circuit breaker, motor thermal protection and 2× 0.1 A/250 VAC semi time-lag fuses (not user-replaceable). Customer must provide a breaker per IEC 60947-2 curve D with ≥10 kA short-circuit capacity within 7 m and in line of sight, plus a differential breaker and CPC earth conductor. Pump has no built-in emergency stop; host equipment EMS must switch it off.

  • Restart procedure: breaker OFF, fix fault, wait ~15 s, breaker ON.
  • Customer-supplied power cable; rating plate example: 200–230 V Δ, 50/60 Hz, 3 phases/4 wires, full-load current 12 A (illustrative).
  • Earth: second protective conductor cross-section ≥ conductor cross-section; IEC 60417 #5019 terminal marking.
  • Wait 5 minutes after power-off before work (capacitors charged to >60 VDC).
  • EMS of host equipment must switch off the pump when activated.
pp. 28-30
Operation and Control Modes

Three control modes: LOCAL (breaker ON/OFF), REMOTE (dry contacts + analog setpoint via 16/19-pin), SERIAL LINK (RS-232/RS-485); selected by Loc-Rem switch. Commissioning checklist: verify inlet connection, unclogged exhaust, water/N2 circuits on, then customer main switch. A 100 L ES power reduction is automatic at ultimate pressure.

  • Local start: breaker ON → pump auto-starts, green LED on, temperature monitoring active.
  • Local stop: breaker OFF → pump auto-stops.
  • Loc-Rem switch: left = 'Loc', right = 'Rem'.
pp. 32-34
Maintenance and Exchange Procedure

Contains maintenance safety instructions, maintenance frequency tables, on-site maintenance limits, and the exchange procedure for replacement products: disconnection from installation, draining the water circuit and preparing the pump for shipping. Pump design requires no preventive maintenance; major work is via Pfeiffer service centers.

  • No preventive maintenance by design; overhaul work done at service centers.
  • Exchange: disconnect, drain water circuit, prepare for shipping.
pp. 35
Decommissioning, Recommissioning and Disposal

Covers shutdown for longer periods, recommissioning steps and disposal of the product.

pp. 36-37
Malfunctions and Fault Indication

Fault indication via indicator lights with troubleshooting for three cases: pump does not start; pump running with indicator light on; pump stops running. Alarm reset is by turning off the power switch (per status label).

  • Indicator lights: PUMP RUNNING, PUMP ALARM, HAZARD TEMP WARNING.
  • Alarm reset: turn OFF power switch.
pp. 40
Accessories

Lists accessories including seismic brackets (referenced by label 'A 329 962 - 5') and replacement blanking plates/airtight accessories for nitrogen pressurization.

pp. 41-48
Technical Data and Dimensions

Contains general data, technical characteristics, and dimension tables/figures: environmental conditions, cooling water, nitrogen, CDA and electrical characteristics, pressure/gas-throughput unit conversion tables, load distribution tables per foot for single and stacked pumps, and load distribution on seismic brackets.

  • Includes Tbl. 7 electrical network protection and Tbl. 8 main circuit breaker rating / cable cross-section.
  • Tbl. 9/10: load per foot for single and 2-stacked pumps; Tbl. 11: seismic bracket loads.
  • Dimensions with and without seismic brackets (Fig. 10, 11).
pp. 49-57
Appendix: RS-232/RS-485 Serial Link

Installation of the serial link, pin connections, protocol configuration and full command lists for RS-232 and RS-485 communication, enabling SERIAL LINK control mode.

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
Pump families covered: A100L3XXXX, A100L4XXXX (load-lock/transfer) and A100L5XXXX (A 100 L ES with Energy Saving option). p.7 ↗ Verify the 5th digit of the part number to identify whether the Energy Saving firmware/hardware variant is fitted. whole series
Energy Saving option (A 100 L ES) reduces energy consumption by 50%, automatically activated at ultimate pressure per pumping conditions. p.17 ↗ Size facility power for reduced average draw on A 100 L ES; standard A 100 L does not have this reduction. A100L5XXXX (A 100 L ES)
Frame attachment requires at least 4× M10x25 grade 8-8 screws, tightening torque 40 N·m. p.18 ↗ Customer must supply screws and torque to 40 N·m to prevent movement/vibration issues. whole series
Stacking two pumps uses 3× CHc M8x16 screws + washers at 22 N·m; lifting brackets must never lift two stacked pumps. p.18 ↗ Only the lower pump is hoisted during stacking; brackets are rated for a single pump only. whole series
Seismic installation: 4 brackets at 'SEISMIC TIE DOWN' positions (label A 329 962 - 5), supplied fixing screws torqued to 40 N·m; only lower pump anchored when stacked; floor bolts customer-supplied. p.19 ↗ Plan anchor bolt selection per floor type and load tables (Tbl. 11) before installation. whole series
Lifting requires a 3-section strap, 1 m per section, with loads of 261 N (bracket 2a), 236 N (2b), 570 N (2c). p.15 ↗ Hoist and strap capacity must exceed the highest single-section load (570 N); use only the provided safety hooks. whole series
New pumps are shipped pressurized with nitrogen; storage limited to 1 year; if blanking plates were removed, re-pressurize to 200 hPa relative with nitrogen before storage. p.15 ↗ Prevent internal corrosion in storage; never store a used pump — return to service center. whole series
Water circuit max pressure label: 101 PSI (7 bar); regulated, softened water required, with manual lockout valve 3 m from pump. p.8 ↗ Facility water must meet spec and be valved for LO/TO; unregulated mains water causes limescale clogging. whole series
Nitrogen connection: 6 mm OD / 4 mm ID pipe, 1/8 NPT ports; CDA may replace N2 when pumped gases are inert. p.21 ↗ Stock correct tubing/fittings; CDA substitution simplifies gas infrastructure for inert processes. whole series (N2/CDA purge, ES function)
Remote control dry contacts rated max 50 V / 1 A, SELV wiring required. p.23 ↗ Do not switch higher-voltage loads directly; use interposing relays for PLC/valve circuits. whole series
Rotation frequency setpoint via 0–10 VDC analog input: 0 V = maximum frequency, 10 V = minimum frequency; active only in Rem mode. p.23 ↗ Note the inverted logic when programming the host analog output; switch Loc-Rem to 'Rem'. whole series
Start/stop logic input: 24 VDC (16-pin) or 15–24 VDC (19-pin) = pump run; 0 V = stop. p.23 ↗ Wire the equipment start interlock to deliver the correct voltage level for a running command. whole series
Mains protection: IEC 60947-2 curve D breaker, ≥10 kA short-circuit cut-off, located ≤7 m from pump and in line of sight, plus a differential breaker. p.25 ↗ Include this breaker in the facility electrical design; rating per Tbl. 7/8 of the technical data. whole series
Rating plate example: 200–230 V Δ, 50/60 Hz, 3 phases/4 wires, full-load current 12 A (illustrative value). p.9 ↗ Size supply cable and breaker per the actual rating plate of the delivered unit (see Tbl. 8). whole series
Electronic circuit protected by two 0.1 A/250 VAC semi time-lag fuses, not replaceable by the installer; internal capacitors hold >60 VDC after power-off. p.25 ↗ No field fuse replacement; observe 5-minute wait after power-off before any intervention. whole series
Pump has no built-in emergency stop; host equipment EMS must switch the pump off when activated; breaker restart after fault requires ~15 s wait. p.25 ↗ Integrate the pump into the equipment's EMS circuit and document restart delay in the equipment procedures. whole series
Oil charge is filled at delivery and must not be modified or drained; oil change is done only during factory overhaul. p.28 ↗ No user-side lubrication maintenance — any oil work goes through a Pfeiffer service center. whole series
Permitted pumped gases: argon, helium, nitrogen and air only; pumping liquids, dust, condensable vapors, corrosive/explosive media is misuse. p.13 ↗ Confirm process gas compatibility before selection; deviation voids warranty and conformity. whole series
Connected chamber parts must withstand 1·10⁻³ hPa absolute negative pressure; exhaust line components must be rated above the pump's maximum generated pressure. p.22 ↗ Verify pressure ratings of chambers and exhaust line components during system design. whole series
Manual lockout valves must be installed at 3 m from the pump on water and nitrogen circuits; full LO/TO required before maintenance. p.11 ↗ Add these valves and LO/TO steps to installation and maintenance procedures to remain compliant with the safety instructions. whole series