ASM 2000 — instruction manual
Technical Reference Summary
Covered Models & Document Scope
Pfeiffer Vacuum ASM 2000 helium leak testing equipment (operating instructions, EN, 84 pages). Applies to part numbers 200314, 200320, 200321, 200322, 200384, 200385, 200386, 200387. Variants differ in roughing pump model, number of test tools, number of 4He calibrated leaks, and optional sniffer probe / laptop table. Related documents: ASI 35 operating instructions (127801) and several SOP migration/recovery specifications (3880, 3881, 4296, 4495).
Section-by-Section Technical Breakdown
Describes scope of delivery (incl. 2 gauge certificates, conditioning tool, pen sniffer probe, internal leak calibration certificate), configurable options, and the required environmental envelope. Details the full HMI layout: light ring, DN 25 ISO-KF test port, touchscreen, tooling connectors.
- Environmental conditions: indoor use, altitude up to 1000 m, IP20, operating 15–25 °C stabilized, storage 10–45 °C, 30–80 % RH non-condensing, overvoltage category II, pollution degree 2
- Interfaces: 9-pin D-Sub digital I/O (24 V DC), G1/8" CDA / N2 / 4He connectors, G1/4" pump exhaust, quick connectors for pressure and interseal pumping, HDMI, Ethernet, 2x USB3
- Equipment must rest 12 h under normal use conditions before first switch-on
Covers placement (horizontal, 4 wheels, brakes on), ventilation clearance, and customer-supplied gas/utility circuits: CDA, N2 venting gas, 4He tracer gas, gas extraction, and tooling connections. Mains connection uses a type E cable with circuit-breaker protection.
- Minimum 110 mm clearance behind the equipment for air circulation grids
- Only N2 permitted as venting gas; only helium 4 as tracer gas — other gases require manufacturer approval
- Recommended flow limiter on gas supplies; maximum authorized flow 25 slm (asphyxia risk mitigation)
- Gas extraction circuit must have exhaust flow rate of at least 1.5 m³/h
- Use shielded cables in EMC-critical environments; never override circuit-breaker interlocks
Startup sequence: connect utilities, switch on three switches (mains, trolley breaker, ASM 2000), UPS charges 20–30 s, PLC and PC boot, then login. After switching on, wait at least 1 hour (alarm check) before use. Shutdown disconnects tools, blanks the DN 25 ISO-KF port, and performs software [Shutdown] before opening the three switches.
- UPS charges in 20–30 seconds at startup; keeps PC on for 3 minutes after main switch off
- Wait ≥1 h after power-on before using the equipment
- Standard shutdown requires fitting the DN 25 ISO-KF blanking plate with O-ring and clamp on the test port
- Emergency stop: disconnect the trolley mains supply cable directly
Table mapping light ring and START/ABORT button colors/states to equipment status, from ASI 35 startup phases to test results. PASS = green, FAIL = red, INVALID = violet.
- White/red = ASI 35 starting; white/violet = warming up; white/yellow = not ready; white/blue = conditioning required
- Blue = test in progress; blue/red = awaiting UUT removal for depollution
- Solid / slow-flash / quick-flash patterns distinguish sub-states
Home page has tab banner, function-key zone and content zone; menus include MEASURE, CALIBRATION, RECIPE, HISTORY, SETTINGS, He TESTING, USER MANAGER. Access to menus/functions is role-dependent across Operator / Service / Advanced / Administrator levels.
- Operator: MEASURE, CALIBRATION, HISTORY, Conditioning; USER MANAGER restricted to Administrator
- Sniffer function and He TESTING menu access can be granted to Operator by Administrator/Maintenance users
- Alarms/warnings tab appears only when a fault is in progress; Operator access is consultation-only
Calibration validates the helium background and verification points; a validated calibration is valid 24 h (configurable), and is invalidated by parameter changes or power-off. Procedure uses the internal ASI 35 autocalibration plus up to five steps, with three external calibrated leaks.
- External calibrated leak range: 1×10⁻⁸ to 1×10⁻⁴ mbar·l/s; leak values must match the configured verification point range
- Steps: Autocalibration (mandatory), Background verification (mandatory, test port capped), Upper/Reject/Lower point verification (optional/configurable)
- Guided procedure for Operator level; free-order non-guided procedure for Advanced/Maintenance level
- Calibration report is generated automatically at closure; faults block calibration steps until acknowledged
Covers prerequisites, opening/closing the test chamber, sample conditions, creating test runs, testing batches, results, and auxiliary 'Gun Mode', 'Graphic' and 'Sniffer' functions. Test results are PASS / FAIL / INVALID, mirrored on the light ring.
- Batch testing of multiple samples supported within a test run
- 'Gun Mode' for local sniffer probing; 'Graphic' function for curve display
- Sniffer function uses the pen-type sniffer probe on the quick connector
Test and calibration reports are stored with history, can be browsed, exported and printed. A report is auto-generated at each calibration closure.
- Report creation, history browsing, export and printing functions available from [HISTORY]/[Report]
- Calibration history stored alongside fault/event history
User account management (creation, passwords, modification), 'Conditioning' and 'Depollution' functions, event/alarm HISTORY with filters, 'Synoptic' plant view, and RECIPE management for test recipes. SETTINGS covers operator access, conditioning, calibration, maintenance and counter parameters.
- Recipes are creatable, modifiable and validated via the [✔] key; recipe details define test sequences
- 'Conditioning' function pressurizes parts with tracer gas; can be triggered manually or from settings
- HISTORY menu provides event details, filter menu and Alarm/Warning tabs
- 'Maintenance' and 'Counters' functions available in SETTINGS for service-level users
Long-term shutdown, restart procedure and disposal. Product contains recyclable materials (steels, aluminum, copper, electronic boards, FPM O-rings, ceramics, etc.).
- Recommissioning follows the standard commissioning procedure after long shutdown
- Disposal must respect the material separation list of the product
Describes fault behavior, message display/acknowledgement, and troubleshooting tables split into warning messages and alarm messages. Migration and recovery procedures (SOP/PC failure) reference dedicated Pfeiffer specifications.
- Faults must be acknowledged before calibration/testing can proceed
- Separate troubleshooting guides for warnings (p. 67) and alarms (pp. 68–71)
- Recovery/migration per specs 3880 (data migration), 4296 (Windows 10 backup/restore), 3881 (SOP HDD change)
Technical characteristics table, unit conversion tables (pressure and gas throughput), CDA/venting/tracer gas supply characteristics, and equipment dimensions with and without laptop table plus required maintenance space.
- Gas supply characteristics tables specify required CDA, N2 and 4He supply conditions (pressure/quality)
- Dimensions drawn for trolley with and without laptop table; maintenance clearance layout provided
- Pressure units and gas throughput conversion tables included for setup calculations
Describes available test sequences (including 'Open' and 'He Prefilled UUT' modes per spec 4495) and UPS behavior supporting graceful shutdown during power loss.
- UPS sustains the PC for 3 minutes after mains loss / main switch off
- Test sequence variants selectable in He SOP mode per specification 4495
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Applicable part numbers: 200314, 200320, 200321, 200322, 200384, 200385, 200386, 200387 (ASM 2000). p.8 ↗ | Verify the unit's P/N against this list before applying the manual; pump model and tool count vary by P/N. | Whole series |
| Environmental conditions: indoor, ≤1000 m altitude, IP20, operating 15–25 °C (stabilized), storage 10–45 °C, 30–80 % RH non-condensing, overvoltage category II, pollution degree 2. p.15 ↗ | Installation site needs stabilized temperature control; unit is not dust/water protected and not suitable beyond 1000 m without derating review. | Whole series |
| Rear ventilation grids require at least 110 mm clearance from fixed walls. p.17 ↗ | Reserve 110 mm minimum clearance in cell layout to maintain performance. | Whole series |
| Only N2 permitted as venting gas; only 4He permitted as tracer gas; hydrogen concentration in analyzed gas must not exceed 5 %. p.13 ↗ | Any other process/tracer gas requires manufacturer approval or voids warranty/conformity. | Whole series |
| Recommended gas flow limiter: maximum authorized flow 25 slm to mitigate asphyxia risk from burst hoses. p.18 ↗ | Install a flow limiter ≤25 slm on N2/He supply lines per safety recommendation. | Whole series |
| Gas extraction circuit must provide exhaust flow rate of at least 1.5 m³/h. p.19 ↗ | Customer extraction system sizing must be ≥1.5 m³/h at the equipment connection. | Whole series |
| Equipment must be stored ≥12 h under normal use conditions before switching on, and after power-on wait ≥1 hour (with alarms acknowledged) before use. p.17 ↗ | Plan ≥13 h of settling time between cold transport and first production test. | Whole series |
| UPS charges in 20–30 s at startup and keeps the computer powered for 3 minutes after main switch off. p.22 ↗ | After switching the main switch to O, mains filter/cable remain live and the PC stays on ~3 min — wait before servicing. | Whole series |
| Calibration validity: 24 h default (configurable); invalidated by parameter changes or power-off. p.27 ↗ | Schedule daily calibration and re-calibrate after any settings change or reboot before testing. | Whole series |
| External calibrated leaks must be within 1×10⁻⁸ to 1×10⁻⁴ mbar·l/s, and each leak value must match the configured verification point range; three leaks (upper, reject, lower points) are required. p.28 ↗ | Procure/checkout three calibrated leaks spanning the configured reject thresholds before commissioning. | Whole series |
| Test port is DN 25 ISO-KF; a DN 25 ISO-KF blanking plate and clamp are supplied and must be fitted at shutdown. p.15 ↗ | All test tooling interfaces must be designed to DN 25 ISO-KF; blank the port whenever idle. | Whole series |
| Gas connectors: CDA, venting gas (N2) and 4He tracer gas on G1/8" interfaces; roughing pump exhaust on G1/4"; digital I/O is a 24 V DC 9-pin D-Sub. p.16 ↗ | Customer plumbing and tooling wiring must match these connector standards. | Whole series |
| Hot surfaces above 65 °C may occur depending on application; protective gloves per EN 420 required. p.12 ↗ | Include thermal PPE and hot-surface labeling in the operator safety plan. | Whole series |
| Startup sequence requires three switches in position I: mains power supply, trolley main switch/circuit breaker, ASM 2000 switch; shutdown is the reverse order after software [Shutdown]. p.22 ↗ | Write site SOPs around the 3-switch power-up/down sequence to avoid UPS/PC corruption. | Whole series |
| Test results and light ring states: PASS = green, FAIL = red, INVALID = violet; blue ring indicates test in progress, white/blue indicates conditioning required. p.23 ↗ | Integrate visual result recognition or digital I/O signaling based on these states for line automation. | Whole series |
| Access levels (Operator / Service / Advanced / Administrator) gate menus: USER MANAGER is Administrator-only; RECIPE and SETTINGS require Service level or above; Operator has MEASURE, CALIBRATION, HISTORY, Conditioning. p.25 ↗ | Define user roles at commissioning so operators cannot alter recipes or settings. | Whole series |
| Emergency stop procedure is to disconnect the trolley mains supply cable directly; equipment must always remain disconnectable via a visible, accessible mains connection. p.12 ↗ | Ensure the mains socket/cable is reachable in the final installation position. | Whole series |
| Foreseeable misuse includes testing soiled parts or parts with water, vapors, paint, adhesive, detergent or rinsing traces; pumping liquids, dust, corrosive/explosive/condensable fluids; use in explosive atmospheres. p.13 ↗ | UUT cleaning/drying specifications must precede testing; violation voids warranty and claims. | Whole series |
| Sniffer probe is optional (pen-type, quick-connector, with storage holder); sniffer menu access can be granted to Operator by Administrator/Maintenance. p.15 ↗ | Order the sniffer option if localizing leaks is required; otherwise the port remains for other tooling. | Variants with sniffer option |
| Related SOP documents: 3880 (data migration), 4296 (Windows 10 backup/restore recovery), 3881 (SOP hard drive change), 4495 (open-close test mode, 'Open' and 'He Prefilled UUT' sequences). p.8 ↗ | Keep these specs on hand for IT/OT recovery planning and He pre-fill test sequence configuration. | Whole series |