Induztr
Engineering Digest Document Viewer Related Models

COBRA DS 1200 A — instruction manual cobra ds 1800 a

Technical Reference Summary

Covered Models & Document Scope

Busch COBRA DS 1800 A screw vacuum pump combination unit (COMBI = screw pump COBRA NS 0150 C (DP) + roots booster WY 1251 B (MB)), nominal displacement 1800 m3/h, design level A. Instruction manual 0870236128/-0004_en (02/06/2023). Accessories/options covered: silencer/sound absorber, leak-protection non-return valve, expansion-tank pressure switch, rear-bearing direct cooling option, Busch PLC/LCD controller (documented in separate manual 0870758077).

Section-by-Section Technical Breakdown

pp. 5-6
Product Description and Operating Principle

The COBRA DS 1800 A is a COMBI pump combining the NS 0150 C screw (DP) pump and WY 1251 B booster (MB) with a water-cooled canned motor, cooling water and nitrogen circuits. Designed for microelectronics industry gas suction. Operating temperature is set by thermostatic valve TV between ~50°C and 100°C; gas flow is monitored by pressure sensor TS1 and nitrogen/cooling flowmeters.

  • Screw (DP) principle: two counter-rotating screws convey gas to exhaust; booster (MB): two lobes, four gas transfers per shaft revolution, no oil lubrication in work area
  • Gas flow check: discharge pressure sensor TS1 triggers purge cycle above factory alarm limit of 0.2 bar; overpressure above 0.3 bar gives warning then alarm (factory alarm function: None)
  • Cooling: cylinder cooling water via thermostatic valve TV (50–100°C range), direct circuit in motors/DP transmission/VFDs preset at 2 l/min (CWR), optional rear-bearing direct cooling
  • Nitrogen uses: dilution gas (middle hole preset 2 l/min via DGR1; end-plate hole preset 10 l/min via DGR2), sealing gas (~8–10 l/min at 1.5 bar, set by chips), purge gas (~30 min cycle after STOP or alarm; inlet shut-off valve must be closed; time programmable)
  • Relief valve SV on expansion tank EV: relief pressure 6 bar; optional pressure switch shuts pump off above 3 bar cooling-liquid pressure
  • LCD controller processes TS1 (exhaust pressure), TS4 (DP cylinder temperature, PT100), MOT1/MOT2 current/speed, FME (N2 flow), CWM (cooling water flow)
  • Version code: DS = standard, 1800 = 1800 m3/h, A = design level
pp. 10-15
Installation and Commissioning

Ambient conditions, utility quality requirements, inlet/outlet connections, electrical wiring and oil/coolant filling are defined. The pump ships with oil and cooling liquid (but no cooling water) installed; levels must be checked before first start-up. Rotation direction must be verified before start or the pump can be destroyed.

  • Ambient: 0–40°C, atmospheric pressure, 20–95% humidity, up to 1000 m altitude, ≥1 m from walls, horizontal and level surface
  • Cooling water: 10–25°C, 2–5 bar overpressure, hardness <5°dGH, neutral and clean, unpressurised outlet; flow 7–8 l/min standard version, 7–15 l/min other applications
  • Nitrogen supply: 1.5 bar overpressure, approx. 10–22 l/min flow
  • Inlet flange: DN 160 ISO-K; discharge flange: DN 40 ISO-KF; line diameters at least equal to flanges; intake line needs shut-off device; discharge line must not have shut-off devices and needs siphon/gradient against condensate
  • Cooling water connection 3/8 NPT; nitrogen connection 1/4 NPT
  • Power wiring 4 poles (L1, L2, L3, earth); overload cut-out per EN 60204-1 required; comply with EMC Directive 2014/30/EU
  • CWM flowmeter must give warning at 2 l/min and stop pump below 1.5 l/min; minimum cooling water flow per commissioning caution is 3 l/min
  • Thermostatic valve TV factory preset at position 4.5 (position 1 ≈ 50°C min, position 5 = 100°C max; do not exceed position 5)
  • After first normal running, measure and save motor current as reference for future maintenance
  • If rotors stick after downtime, loosen screw rotors with an Allen key by hand (clockwise) via the access cover
pp. 14-15
Operation / Start-up and Shutdown

Start-up requires correct cooling water flow (TV and CWR settings), nitrogen flow settings (DGR1/DGR2) and leak-free system; open intake gate valve before starting. Shutdown order: close intake valve, stop pump, shut N2 then cooling water, ensure currentless. Long shutdowns in frost risk require draining all cooling water and cooling liquid.

  • Allowed inlet gas temperature for air: Pa > 50 mbar → TGas < 80°C; Pa < 50 mbar → TGas < 200°C
  • Continuous duty permitted at any pressure between atmosphere and ultimate pressure; pump is tight down to ultimate pressure
  • Surface temperature can exceed 50°C during operation — burn hazard
  • Purge cycle (~30 min) requires closed inlet shut-off valve and is triggered after STOP or alarm
pp. 15-18
Maintenance

Maintenance intervals are weekly, monthly, yearly and 16,000 operating hours (max 4 years). Before any work: LOTO procedure, 610 mm safety perimeter, nitrogen flushing of pump and lines if hazardous gases were conveyed, contamination declaration required before dismantling. Oil and cooling liquid temperature can reach 100°C.

  • Major overhaul interval: every 16,000 operating hours, at the latest after 4 years
  • Check oil level between MIN/MAX on sight glasses; refill via oil filler plug; verify level after running a few minutes
  • Check oil colour, change oil and cooling liquid per procedures; cooling liquid refill until it reaches top of cylinder upper plate
  • Periodic checks: cooling water flow, nitrogen flow, current consumption (compare to saved reference), silencer, leak-protection non-return valve
  • Shutdown periods: drain cooling water (use compressed air if needed) to prevent frost damage
pp. 13, 20-21
Oil and Cooling Liquid Type / Quantity

Dedicated tables specify lubricants and fill quantities per sub-module. Quantities are informative only — final level set via sight glasses.

  • Oil NS 0150 C (DP): 1.7 l; WY 1251 B (MB): 1.4 l — Busch YLC 250 B, Art. No. 0831 131 400 (0.5 l ≅ 1 kg)
  • Cooling liquid NS 0150 C: 4 l — ethylene glycol Zitrec M-25, Art. No. 0831 563 469, 40% glycol / 60% water
  • Before changing oil type, verify compatibility with old type; flush pump if necessary
pp. 9, 18-19, 23-24
Overhaul, Removal from Service and Disposal

Temporary removal from service and recommissioning follow preservation/start-up procedures. Decommissioning requires a signed 'Declaration Regarding Contamination of Vacuum Equipment and Components' before dismantling, PPE, and disposal per local/national laws.

  • If contamination declaration is incomplete or unsigned, the pump may not be dismantled
  • Some residue may remain inside the pump during disassembly — wear PPE
  • EU and UK Declarations of Conformity included (pages 23–24)

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
Pump is a COMBI of screw pump NS 0150 C (DP) + booster WY 1251 B (MB), nominal displacement 1800 m3/h, with water-cooled motors and frequency inverters (VFD). p.5 ↗ Two motors, two VFDs and four oil sight glasses must be serviced; speed/current monitoring per motor (MOT1/MOT2). COBRA DS 1800 A
Inlet flange DN 160 ISO-K; discharge flange DN 40 ISO-KF. p.11 ↗ Size process lines at least to these diameters; smaller cross-sections reduce performance. COBRA DS 1800 A
Cooling water requirements: 10–25°C, 2–5 bar relative overpressure, hardness <5°dGH, flow approx. 7–8 l/min (standard) / 7–15 l/min (other applications). p.10 ↗ Facility water loop must be qualified; unpressurised outlet mandatory. COBRA DS 1800 A
Nitrogen supply: 1.5 bar overpressure, approx. 10–22 l/min; dilution flows preset 2 l/min (DGR1, middle hole) and 10 l/min (DGR2, end-plate hole). p.6 ↗ Dimension N2 supply lines and regulator for these flows; adjust per process for corrosive gas duty. COBRA DS 1800 A
Sealing nitrogen flow is fixed by orifice chips at ~8–10 l/min at 1.5 bar. p.6 ↗ No valve adjustment needed; verify supply pressure to guarantee process isolation. COBRA DS 1800 A
Direct cooling water circuit (motors/transmission/VFDs) preset at 2 l/min via valve CWR; CWM flowmeter must warn at 2 l/min and stop the pump below 1.5 l/min; minimum flow 3 l/min per commissioning caution. Wire CWM interlock so low flow stops the pump; do not alter CWR factory setting without re-checking flow. COBRA DS 1800 A
Thermostatic valve TV preset at 4.5; position 1 ≈ 50°C (min), position 5 = 100°C (max, must not be exceeded); high setting recommended to prevent resublimation. p.6 ↗ Set operating temperature to suit process; use high setting for sublimating process gases. COBRA DS 1800 A
Discharge pressure sensor TS1 alarm factory preset at 0.2 bar triggers purge cycle; overpressure above 0.3 bar gives warning then alarm (factory alarm function: None — pump keeps running). p.5 ↗ For critical processes, reconfigure the alarm function at the PLC to stop the pump rather than only alarm. COBRA DS 1800 A
Purge cycle lasts ~30 min (programmable), triggered after STOP or alarm; inlet shut-off valve must be closed for correct purge. p.6 ↗ Include inlet valve in shutdown logic and budget purge time into process cycle. COBRA DS 1800 A
Oil: Busch YLC 250 B (Art. No. 0831 131 400); NS 0150 C: 1.7 l, WY 1251 B: 1.4 l; replacement after 5000 h. p.8 ↗ Stock YLC 250 B and plan oil changes at 5000 h intervals; MB booster needs no oil in process area but has its own 1.4 l charge. NS 0150 C and WY 1251 B modules
Cooling liquid: ethylene glycol Zitrec M-25 (Art. No. 0831 563 469), 4 l in NS 0150 C at 40% glycol / 60% water, replace after 5000 h. p.8 ↗ Freeze protection to Zitrec M-25 rating; maintain the specified mix ratio on refill. NS 0150 C (DP)
Relief valve SV on expansion tank EV: relief at 6 bar; optional cooling-liquid pressure switch must shut pump off above 3 bar. p.6 ↗ Wire the optional pressure switch into the pump control circuit for overpressure protection of the coolant circuit. COBRA DS 1800 A (pressure switch optional)
Max inlet gas temperature (air): TGas < 80°C at Pa > 50 mbar; TGas < 200°C at Pa < 50 mbar. p.5 ↗ Interlock upstream process temperature or dilute with N2 at higher inlet pressures to avoid overheating the pump. COBRA DS 1800 A
Ambient conditions: 0–40°C, humidity 20–95%, up to 1000 m altitude, atmospheric pressure; ≥1 m clearance from walls. p.10 ↗ Verify installation site compliance; above 1000 m or outside temperature range requires special review. COBRA DS 1800 A
Pump fixed with four M10 screws (two per bracket), each bracket must withstand 1200 N tensile force for seismic installation. p.8 ↗ Select anchor bolts per floor material rated ≥1200 N tensile per bracket. COBRA DS 1800 A
Pump must not exceed 5° inclination from horizontal when lifted or transported with oil inside. p.9 ↗ Specify lifting procedure and lifting gear accordingly; risk of oil leak otherwise. COBRA DS 1800 A
Maintenance schedule: weekly, monthly, yearly, and overhaul every 16,000 operating hours or 4 years, whichever comes first. p.15 ↗ Build preventive maintenance plan with 16,000 h overhaul as major intervention. COBRA DS 1800 A
Cooling water connections 3/8 NPT; nitrogen connection 1/4 NPT; nitrogen pipe must be leakproof against oxygen. p.12 ↗ Use correct fittings and oxygen-compatible sealing practice for the N2 line. COBRA DS 1800 A
Wrong motor rotation direction can destroy the pump even briefly; verify direction before start (rubber plate on inlet or measuring tool); to reverse, exchange two of three feeder leads. p.12 ↗ Include rotation check in commissioning checklist before first power-on. COBRA DS 1800 A
Power wiring: 4 poles (L1, L2, L3, earth); overload cut-out per EN 60204-1 required; interface options include 2× RJ45 LCD, 9-pin PC/PID, USB, RS-232 Modbus RTU, Ethernet (Busch Monitoring System), 50-pole interface. p.12 ↗ Prepare cabling and controller integration per the Busch PLC/LCD manual 0870758077. COBRA DS 1800 A