Induztr
Engineering Digest Document Viewer Related Models

COBRA DS 3010 G — instruction manual cobra ds 3161 c

Technical Reference Summary

Covered Models & Document Scope

Instruction manual for the COBRA DS 3161 C COMBI vacuum pump (design level C, nominal displacement 3200 m³/h), a combination of the NS 0600 C screw vacuum pump (DP) and the WY 3600 A booster (MB) with cooling water and nitrogen circuits. Covers standard version including LCD remote control, PLC, emergency stop, and associated options/accessories (silencer, relief valve).

Section-by-Section Technical Breakdown

pp. 5-11
Product Description and Operating Principle

Describes the COBRA DS 3161 C as a COMBI pump: NS 0600 C screw pump plus WY 3600 A booster, both water-cooled. Covers component layout, oil circuit (absent in work area due to contactless principle), cooling concepts, nitrogen system uses, and the version naming scheme.

  • COMBI = screw vacuum pump NS 0600 C (DP) + booster WY 3600 A (MB); booster uses a water-cooled canned motor
  • Version code: DS = standard version, 3161 = 3200 m³/h nominal displacement, C = design level
  • Exhaust pressure sensor TS 5 triggers purge cycle at factory alarm limit 0.2 bar
  • Nitrogen used as dilution gas (two injection points), purge gas (~30 min purge cycle after STOP or alarm, programmable), sealing gas, and optionally flushing gas (air also possible)
  • Relief valve SV on expansion tank: relief pressure 6 bar
  • LCD controller processes TS1 (exhaust pressure), TSA (cylinder temp), MOT1/MOT2 currents, FME (N2 flow), CWM (cooling water flow); ref doc No. 0870758077/-0002
pp. 12-17
Safety, Intended Use and Electrical Safety

Intended for industrial use (microelectronics field) in non-explosive environments, operated by qualified personnel. Defines SEMI S2 electrical work types, Lock Out/Tag Out procedures, emergency off circuit behavior, safety perimeter, and seismic/ground fixation requirements.

  • Safety perimeter of at least 610 mm around the pump before any maintenance
  • Ground fixing: four M10 screws, two per bracket, each bracket must withstand 1200 N tensile force
  • Emergency stop immediately stops DP and MB pumps; PLC stays energized to save pump status; restart via LCD START button
  • Maximum 2 starts per hour, spread within the hour; pump thermally suitable for continuous operation
  • Sound pressure per EN ISO 2151 (see Technical Data); ear protection required near non-insulated pump
  • LOTO: stop pump (STOP button 10 s via LCD, or 2 s via Start/Stop), press emergency stop, switch off main breaker and customer supply, close water (inlet first) and nitrogen quick connections
pp. 21-25
Installation and Commissioning

Installation prerequisites (ambient conditions, cooling water and nitrogen quality/pressures), flange connections, and startup preparation. Includes dimensional drawing with flange sizes and utility connections.

  • Ambient: 0–40°C, atmospheric pressure, humidity 20–95%, altitude up to 1000 m
  • Cooling water: hardness <5°dGH, temperature 10–25°C, overpressure 2–5 bar rel, flow ≥10 l/min (standard) / ≥12 l/min (other applications), particle size <200 µm, chloride <100 mg/l, free chloride <0.3 mg/l, conductivity ≤100 µS/cm
  • Nitrogen: overpressure 1.5 bar; dilution 1 preset 10 Nl/min, dilution 2 preset 20 Nl/min; max consumption 200 Nl/min
  • Inlet DN 160 ISO-K; outlet DN 63 ISO-KF; cooling water 3/8''; nitrogen inlet 1/4''
  • Minimum 1 m distance from walls for cooling; ~30 mm adjustment stroke on four machine feet for levelling
  • Surface temperature can exceed 50°C in operation — burn hazard
  • Inlet line requires upstream shut-off device; line cross-section at least equal to flange diameter
  • Cooling liquid flow switch FS 1 stops pump if flow <1 l/min for ≥30 s; TS 3 gives emergency signal above 100°C cooling liquid temperature
pp. 38-45
Operation, Switching and Load Lock Mode

Recommendations on operation, on/off switching via LCD (local) or production machine (remote), and load lock operation modes with signal control (LL Mode = EXTERN) and current control (LL Mode = AUTO).

  • Allowed inlet gas temperature (air): Pa > 50 mbar → TGas < 80°C; Pa < 50 mbar → TGas < 200°C
  • Solid particles must not enter the pump; if liquid is drawn in, a short drying time at end of procedure is required
  • Cooling water flow preset at 10 l/min at factory, adjustable via valve CWR, monitored by flow meter CWM (factory alarm setting: ESS — pump stops after alarm)
  • Nitrogen flow alarm factory setting: None — pump continues running with alarm
  • Start/stop in Local via LCD controller or in Remote by production machine
pp. 46-59
Maintenance (Oil and Cooling Liquid)

Maintenance schedule with lockout procedures, oil checking/refilling/color inspection/change, and cooling liquid level checks, refilling, draining and filling.

  • Oil type: YLC 250 B, Art. No. 0831 131 400 (0.5 l ≈ 1 kg)
  • Oil quantity: NS 0600 C = 1.6 l; WY 3600 A = 3.5 l
  • Oil replacement interval: 5000 h
  • Cooling liquid: approx. 26 l ethylene glycol, Art. No. 2000 241 757, CLA 25 (ready-to-use mix), replacement after 5000 h
pp. 60-62
Overhaul, Removal from Service and Disposal

Covers overhaul, temporary removal from service, recommissioning, and dismantling/disposal with mandatory decontamination and a contamination declaration form.

  • Dismantling only by authorized personnel after a signed 'Declaration Regarding Contamination of Vacuum Equipment and Components'
  • PPE required before any intervention; process residues may remain inside
pp. 63-65
Spare Parts and Troubleshooting

Spare parts lists and a troubleshooting chapter with fault finding guidance.

  • Spare parts chapter (p. 63) and Troubleshooting chapter (p. 64) referenced; details in full manual
pp. 68-71
Technical Data and Declarations of Conformity

Technical data table plus EU and UK Declarations of Conformity. Sound pressure values are given in the technical data table per EN ISO 2151.

  • EU Declaration of Conformity (p. 70) and UK Declaration of Conformity (p. 71) included
  • Reference to Machine Directive 2006/42/EC for integration responsibility

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
COMBI pump consists of screw pump NS 0600 C (DP) + booster WY 3600 A (MB); version DS 3161 C = 3200 m³/h nominal displacement p.9 ↗ Two-stage sizing: select system pipework and backing calculations for the combined COMBI package, not a single pump stage whole series
Maximum 2 starts per hour, spread within the hour; continuous operation allowed thermally p.9 ↗ Cycle duty must be limited in the host machine control; frequent start/stop applications need soft-start logic or a larger pump whole series
Allowed inlet gas temperature (air): Pa > 50 mbar → TGas < 80°C; Pa < 50 mbar → TGas < 200°C p.9 ↗ Process gas temperature limits depend on inlet pressure; verify process conditions before pump selection for hot gas duties whole series
Cooling water requirements: hardness <5°dGH, 10–25°C, 2–5 bar rel, flow ≥10 l/min standard (≥12 l/min other applications), chloride <100 mg/l, free chloride <0.3 mg/l, conductivity ≤100 µS/cm, particles <200 µm p.21 ↗ Site water quality must be verified before commissioning; poor water causes cooling failure and pump damage whole series
Factory cooling water flow preset 10 l/min, adjustable via valve CWR, monitored by flow meter CWM; factory alarm setting ESS (pump stops after alarm) p.10 ↗ Low-flow alarm stops the pump by default — can be reconfigured in the PLC if continuous-run-with-alarm behavior is desired whole series
Cooling liquid flow switch FS 1 stops the pump if flow <1 l/min for at least 30 s; PT100/TS 3 emergency signal above 100°C cooling liquid temperature stops pump immediately p.10 ↗ Indirect cooling circuit protection is automatic; ensure glycol circuit is filled and pump operational before startup whole series
Nitrogen: supply overpressure 1.5 bar; dilution flows preset 10 Nl/min (DGR 1, cylinder middle) and 20 Nl/min (DGR 2, cylinder end); max consumption 200 Nl/min p.10 ↗ Size the N2 supply line and regulator for up to 200 Nl/min peak consumption; dilution improves screw function with corrosive gases whole series
Exhaust overpressure sensor TS 5 alarms at 0.2 bar (factory) and starts purge cycle; relief valve SV at 6 bar on expansion tank p.10 ↗ Exhaust back-pressure must stay below 0.2 bar to avoid purge/alarms; exhaust line sizing (DN 63 ISO-KF) must not create excess back-pressure whole series
Purge cycle lasts about 30 min (programmable in basic parameters); inlet shut-off valve must be closed for correct purge p.10 ↗ Account for ~30 min pump-down purge time in tool idle/standby sequencing whole series
Inlet flange DN 160 ISO-K, outlet DN 63 ISO-KF, cooling water 3/8'', nitrogen inlet 1/4'' p.23 ↗ Matching line diameters mandatory to prevent performance loss; smaller cross-sections reduce pumping speed whole series
Oil: YLC 250 B (Art. No. 0831 131 400); NS 0600 C 1.6 l, WY 3600 A 3.5 l; replacement after 5000 h p.17 ↗ Stock correct oil type and ~5.1 l total per oil change interval whole series
Cooling liquid: approx. 26 l ethylene glycol CLA 25 (Art. No. 2000 241 757), ready-to-use mix, replacement after 5000 h p.17 ↗ Use premixed CLA 25; do not fill plain water; plan 26 l inventory per fluid change NS 0600 C cooling circuit
Ambient conditions: 0–40°C, humidity 20–95%, altitude up to 1000 m, non-explosive environment p.21 ↗ Do not install outdoors or above 1000 m without derating review; ATEX zones require local motor/electrical regulation compliance whole series
Ground fixation: four M10 screws (two per bracket), each bracket withstanding 1200 N tensile force; final user adapts screw type to ground material p.16 ↗ Seismic/anchoring specification is the end user's responsibility; specify anchors per floor material whole series
Safety perimeter ≥610 mm around pump for maintenance; ≥1 m distance from walls for cooling p.14 ↗ Layout footprint must include clearance zones beyond physical pump dimensions whole series
Max inclination 5° from horizontal when lifting an oil-filled pump p.19 ↗ Crane lifts require inclinometer/spreader control to avoid oil leaks into the work area whole series
LOTO: stop via LCD STOP (10 s) or Start/Stop button (2 s), then emergency stop, main breaker, customer supply, then water (inlet first) and nitrogen isolation p.15 ↗ Site safety procedures must mirror this exact isolation sequence; end user provides water/N2 energy isolation capability whole series
Emergency stop immediately stops DP and MB pumps while PLC remains energized preserving pump status; restart after releasing E-stop via LCD START p.15 ↗ PLC stays live after E-stop — treat control cabinet as energized during E-stop conditions whole series
Pump shipped with oil and cooling liquid installed (per order) but without cooling water; check oil and coolant levels and connect cooling water before first startup p.10 ↗ First startup without coolant connection will damage the pump — a mandatory pre-start checklist item whole series
Temperature switches: TS1 oil 120°C, TS2 cooling liquid 100°C, TS4 oil 140°C, TS 155°C; temperature regulator TR at 55°C p.6 ↗ Integrate these alarm/interlock thresholds into supervisory control and fault diagnosis whole series