HiScroll 12 — instruction manual hiscroll 18 3ph atex
Technical Reference Summary
Covered Models & Document Scope
Pfeiffer Vacuum HiScroll 18 scroll pump with three-phase asynchronous motor (dry-running, air-cooled). Two variants covered: HiScroll 18 3-phase including ATEX (with gas ballast, GB) and HiScroll 18 3-phase without GB, including ATEX. Example part number on rating plate: PD S33 201. Document is a 64-page operating instructions manual.
Section-by-Section Technical Breakdown
Describes the dry-running scroll principle (stationary + orbiting spiral, lubricant-free suction chamber) with three-stage gas ballast to prevent condensation. Identifies product via rating plate and lists variants, pumping speeds and scope of delivery.
- Pumping speed 16.7 m³/h at 50 Hz, 20 m³/h at 60 Hz (HiScroll 18 with ATEX)
- Rating plate example: 190–220/380–415 V AC ±5% 50 Hz 3.2/2.5 A; 200–240/380–480 V AC ±5% 60 Hz 2.9/2.1 A; S(N2) max 20.0 m³/h; mass 27 kg; n max 1760 1/min
- Drive: three-phase asynchronous motor; cooling: air; shaft bearing: 2x maintenance-free deep groove ball bearings, hermetically separated from dry working chamber
- Scope of delivery: pump, protective caps for vacuum and exhaust connections, operating instructions
- IP 44 / Type 1, UL/CSA 61010-1 (TÜV Rheinland)
Setup on flat horizontal surface (inclination max. 10°, clearance >25 mm), DN 25 ISO-KF vacuum and exhaust connections, and external gas ballast supply (inert gas only). Electrical section covers MCB, RCCB and motor protection switch requirements, 6-pin terminal board star (high voltage, factory setting) vs delta (low voltage) connection, fan voltage selection and rotation direction check.
- Minimum distance >25 mm, max inclination 10°; screw to base for stationary installation (remove rubber feet)
- Vacuum connection via DN 25 ISO-KF small flange components; keep lines short to avoid throttling; protective strainer mandatory at vacuum inlet for explosive media
- Exhaust line must be routed without shut-off units; observe maximum permissible exhaust pressure
- Miniature circuit breaker (MCB), residual current circuit breaker (RCCB) and motor protection switch required on site (settings per Tbl. 6–8)
- Star circuit = high voltage (factory setting); delta connection = low voltage (6-pin terminal board)
- Check direction of rotation with rotary field measuring instrument (Fig. 12)
- Fan connecting cable must be clamped onto circuit board depending on voltage supply (Fig. 11)
Commissioning, switching on/off, temperature monitoring via bimetal switch and operation with the three-stage gas ballast. Gas ballast valve must only be operated in snap positions 0, 1 and 2 (intermediate positions are not vacuum-tight).
- Gas ballast valve settings per Tbl. 11: positions 0 (closed), 1 and 2; only snapped positions are vacuum-sealed
- Temperature monitoring via bimetal switch (technical data Tbl. 10)
- Motor restarts automatically after power failure — maintain distance from vacuum flange
- Proper shutdown procedures must be observed; never disconnect plug connections during operation
Maintenance intervals per checklist (Tbl. 12); customer-performable tasks include replacing the exhaust-side non-return valve, gas ballast valve and tip seal (involves disassembly of spiral housing). Final inspection and inerting requirements before opening the pump.
- Maintenance levels: level 1 = trained customer, level 2 = customer with technical education / PV service tech, level 3 = PV-trained customer / PV service tech
- Tip seal replacement: disassemble spiral housing (remove fan cover), replace tip seal, reassemble housing (Fig. 19–24)
- Non-return valve and gas ballast valve replacement procedures documented (Fig. 13–18)
- Before maintenance: vent to atmospheric pressure, disconnect from mains, secure against restart, decontaminate if toxic media were pumped
- Ensure suction chamber is sufficiently inerted before opening the pump
Shutting down for longer periods and recommissioning procedures, disposal of the scroll pump, general malfunction troubleshooting table (Tbl. 13), plus service solutions and spare part packages (Tbl. 14–15: maintenance kit 1, valve set).
- Troubleshooting table Tbl. 13 for scroll pump malfunctions (p.52-53)
- Spare part packages: HiScroll maintenance kit 1 and HiScroll valve set (Tbl. 14–15)
- Accessories list for HiScroll with ordering information (Tbl. 16, p.58)
Technical data table for HiScroll 18 3-phase (Tbl. 19), pressure/throughput unit conversion tables, materials in contact with process media (Tbl. 20), dimension drawing (Fig. 27), plus EC and UK Declarations of Conformity.
- Materials in contact with process media documented in Tbl. 20 (incl. FKM, PTFE per abbreviation list)
- Pressure unit and gas throughput conversion tables (Tbl. 17–18)
- Dimension drawing HiScroll 18 3-phase in Fig. 27 (p.61)
- EC Declaration of Conformity (p.62) and UK Declaration of Conformity (p.63) included
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Pumping speed is 16.7 m³/h at 50 Hz and 20 m³/h at 60 Hz; rating plate states S(N2) max 20.0 m³/h p.8 ↗ | Size the backing/vacuum system for the 50 Hz figure unless a 60 Hz supply is available; max capacity only 20 m³/h | HiScroll 18 3-phase incl. ATEX |
| Motor supply ratings: 190–220/380–415 V AC ±5% at 50 Hz, 3.2/2.5 A; 200–240/380–480 V AC ±5% at 60 Hz, 2.9/2.1 A (delta/star) p.8 ↗ | Wire the 6-pin terminal board in star for high voltage (factory setting) or delta for low voltage; size supply fuses at ~3.2 A max | whole series |
| Rated motor speed n max = 1760 1/min; mass 27 kg; protection IP 44 / Type 1 p.8 ↗ | 27 kg requires mechanical lifting aids (eye bolt); IP44 limits use to dry, dust-protected indoor locations | whole series |
| ATEX marking II 3/-G Ex h IIC T4 Gc X, permissible ambient temperature +5 °C to +40 °C, Category 3G (Zone 2) p.17 ↗ | Only Zone 2 indoor use; pumped gas ignition temperature must stay above +135 °C (T4 limit) even at elevated exhaust pressures; only ATEX-approved accessories allowed | whole series |
| Explosion risk condition: at exhaust side pressures up to 3500 hPa abs, pumped medium ignition temperature must remain above +135 °C p.13 ↗ | Verify medium ignition temperature vs exhaust back-pressure when sizing exhaust line; route exhaust without shut-off valves | whole series |
| Installation limits: air pressure 750–1060 hPa, altitude max. 3000 m, surface inclination max. ±10°, relative humidity max. 90% non-condensing p.18 ↗ | Validate site conditions before installation; derate/avoid installations above 3000 m or in condensing environments | whole series |
| Overvoltage category II, pollution degree 2, protection class I (requires PE earth conductor) p.16 ↗ | Installation must include proper protective earth; after connection work, perform an earthed conductor check | whole series |
| Pump has no built-in mains disconnection device; a motor protection switch, MCB and RCCB must be installed on site with settings per Tbl. 6–8 p.14 ↗ | Spec the site electrical cabinet with MCB/RCCB/motor protection switch before commissioning; without motor protection switch, surface temperature can exceed 105 °C in a fault | whole series |
| Vacuum and exhaust connections are DN 25 ISO-KF small flange; use short lines with large nominal diameter to avoid throttling p.27 ↗ | Plan manifold with DN 25 ISO-KF clamping ring/centering ring hardware; long or narrow lines reduce effective pumping speed | whole series |
| Three-stage gas ballast valve must only be operated in snap positions 0, 1 and 2; intermediate positions are not vacuum-tight p.13 ↗ | Lockout/labeling and operator training must prohibit intermediate valve settings to prevent toxic process media escaping | HiScroll 18 with gas ballast (GB) variant |
| Only inert gases are permitted as gas ballast supply; the inert gas system must be closed to avoid zone entrainment p.11 ↗ | Design gas ballast supply line as closed inert gas system (no open air/O2-containing gas); clean the valve inlet area with slight overpressure before connecting | whole series |
| Motor restarts automatically after power failure or overtemperature standstill p.12 ↗ | During any service work near the vacuum flange: disconnect from mains and secure against restart to avoid entrapment injuries | whole series |
| Surface temperature can exceed 70 °C in normal operation and >105 °C during malfunction without motor protection switch p.13 ↗ | Install touch protection if pump is freely accessible; keep cables/lines away from surfaces >70 °C; allow cooldown before work | whole series |
| Exhaust pressure limit: exhaust line must be routed without shut-off units and max permissible pressure per technical data must be observed; risk of bursting p.12 ↗ | Never install valves in the exhaust line; check exhaust line function regularly | whole series |
| Suction chamber is completely dry and lubricant-free; shaft bearings are 2x maintenance-free deep groove ball bearings hermetically separated from the working chamber p.21 ↗ | No oil changes/lubrication of the pumping chamber; maintenance limited to valves and tip seal | whole series |
| Transport must always use the eye bolt with a lifting device; never stack products; improper lifting tears off the fan cover fastener p.10 ↗ | Rigging plans must specify vertical lifting via the eye bolt; keep the eye bolt for future relocations | whole series |
| A protective strainer is mandatory at the vacuum connection when pumping explosive media (particles can form ignition sources) p.11 ↗ | Include a strainer in the inlet design and only remove it once no solid particles can enter the pump | whole series (ATEX operation) |
| Tip seal replacement requires disassembly of the spiral housing (fan cover removal, Fig. 19-24); maintenance kit 1 and valve set are available as spare part packages p.44 ↗ | Plan tip seal as a wear-part replacement at customer maintenance level; order maintenance kit and valve set proactively (p.56-57) | whole series |
| Rotation direction must be verified with a rotary field measuring instrument after electrical connection (Fig. 12); fan connecting cable must be matched to the chosen voltage supply on the circuit board p.32 ↗ | Incorrect phase sequence reverses the pump; include rotation check in commissioning checklist and set fan cable per high/low voltage wiring | whole series |