Induztr
Engineering Digest Document Viewer Related Models

Installing the 2998 PDA Detector Flow Cell

Technical Reference Summary

Covered Models & Document Scope

This document covers the replacement of flow cells for the 2998 Photodiode Array Detector. Four flow cell kits are available: Analytical (205000399), Microbore (205000400), Semi-Prep (205000401), and Autopurification (205000402). The procedure applies to all these variants.

Section-by-Section Technical Breakdown

pp. 1
Flow Cell Specifications

Table 2 lists the specifications for each available flow cell, including volume, pathlength, tubing internal diameter, and pressure rating. The Autopurification flow cell has separate inlet and outlet tubing diameters and a higher pressure rating.

  • Analytical: volume 9 µL, pathlength 10 mm, tubing ID 0.010 in, pressure rating 69 bar/1000 psi.
  • Autopurification: volume 11 µL, pathlength 0.5 mm, inlet tubing ID 0.010 in, outlet tubing ID 0.040 in, pressure rating 138 bar/2000 psi.
  • Microbore: volume 3 µL, pathlength 8 mm, tubing ID 0.005 in, pressure rating 69 bar/1000 psi.
  • Semi-preparative: volume 17 µL, pathlength 3 mm, tubing ID 0.020 in, pressure rating 69 bar/1000 psi.
  • Cuvette: volume N/A, pathlength 10 mm, tubing ID N/A, pressure rating N/A.
pp. 1-3
Flow Cell Replacement Procedure

Step-by-step instructions for removing and installing a flow cell in the 2998 detector. The procedure includes powering off, disconnecting tubing, removing the old flow cell, inserting the new one with proper alignment, tightening thumbscrews, reconnecting tubing, and priming the system.

  • Tools required: 1/4-inch flat-blade screwdriver.
  • Power off the detector and stop solvent flow before starting.
  • Lift up the detector front cover and pull it from the chassis.
  • Disconnect inlet and outlet tubing from their connections.
  • Loosen three thumbscrews on the flow cell front plate with the screwdriver.
  • Grasp the handle and gently pull the flow cell toward you.
  • Unpack and inspect the new flow cell.
  • Square the flow cell assembly in front of the opening and insert it into the optics bench, using the alignment pins.
  • Push the front of the assembly until it seats on the front alignment pins.
  • Continue inserting until the three thumbscrews align with their holes.
  • Alternate between tightening the captive screws and pushing the flow cell forward to prevent binding and ensure proper seating.
  • Hand tighten the thumbscrews, then tighten snug with the screwdriver.
  • Connect inlet tubing to the column outlet and flow cell inlet.
  • Replace the front panel cover.
  • Prime the system to fill the flow cell with solvent and remove air before powering on.

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
Analytical flow cell (205000399) has a volume of 9 µL, pathlength of 10 mm, tubing internal diameter of 0.010 inches, and pressure rating of 69 bar/1000 psi. p.1 ↗ Select this flow cell for standard analytical separations where high sensitivity and moderate pressure are required. Analytical flow cell
Autopurification flow cell (205000402) has a volume of 11 µL, pathlength of 0.5 mm, inlet tubing ID 0.010 inches, outlet tubing ID 0.040 inches, and pressure rating of 138 bar/2000 psi. p.1 ↗ Use this flow cell for purification applications requiring higher pressure and larger outlet tubing to accommodate higher flow rates. Autopurification flow cell
Microbore flow cell (205000400) has a volume of 3 µL, pathlength of 8 mm, tubing internal diameter of 0.005 inches, and pressure rating of 69 bar/1000 psi. p.1 ↗ Choose this flow cell for microbore LC applications where low volume and minimal band broadening are critical. Microbore flow cell
Semi-preparative flow cell (205000401) has a volume of 17 µL, pathlength of 3 mm, tubing internal diameter of 0.020 inches, and pressure rating of 69 bar/1000 psi. p.1 ↗ Use this flow cell for semi-preparative scale purifications where larger tubing and shorter pathlength reduce backpressure and accommodate higher flow rates. Semi-preparative flow cell
The optional autopurification flow cell has three fittings: inlet analytical, inlet prep, and outlet. p.2 ↗ When installing this flow cell, ensure all three connections are made correctly to avoid leaks or improper flow. Autopurification flow cell
The flow cell uses alignment pins on the optics bench for proper positioning. p.2 ↗ When inserting the flow cell, square it in front of the opening and push until it seats on the front alignment pins to ensure correct optical alignment. All flow cells
To prevent binding and ensure proper seating, alternate between tightening the captive screws and pushing the flow cell forward. p.3 ↗ Follow this alternating technique during installation to avoid damaging the flow cell or optics bench. All flow cells
Hand tighten the thumbscrews, then tighten them snug with a 1/4-inch flat-blade screwdriver. p.10 ↗ Do not overtighten; snug tightening is sufficient to secure the flow cell without damaging the threads or seals. All flow cells
Before powering on the detector, prime the system to fill the flow cell with solvent and remove any air. p.13 ↗ Priming prevents air bubbles from affecting detector performance and ensures the flow cell is ready for operation. All flow cells
A 1/4-inch flat-blade screwdriver is required for loosening and tightening the three thumbscrews on the flow cell assembly. p.1 ↗ Ensure this tool is available before starting the replacement procedure. All flow cells