Magnis/MagnisDx NGS Prep System Quick Reference Guide
Contenido
Overviewp. 2
Prerequisites and setup checks before operating the system
Warningpp. 3-5
Warnings and safety precautions for instrument operation
Specp. 6
Operating environment conditions required for the instrument
Specp. 7
Site and installation requirements for the system
Overviewpp. 8-10
Description of instrument parts and components
Procedurep. 11
Procedure for powering on the system
Procedurep. 12
Steps to create and manage user accounts
Procedurep. 13
Decontamination procedure for the instrument
Procedurepp. 14-15
Instructions for running protocols with cautions
p. 16
Document revision history
p. 2table, 3 rows
p. 11table, 3 rows
p. 10table, 4 rows
p. 12table, 10 rows
Table 2 Recommended supplies for cleaning the system instrument
Description
Purpose
Vendor
Diluted bleach (10%) wipes
Surface-cleaning of the instrument deck
Hype-Wipe Bleach Towelettes, or equivalent
Alcohol (70%) wipes
Surface-cleaning of the instrument exterior and instrument deck
VWR Pre-Moistened Clean Wipes, or equivalent
Dry, lint-free, scratch-free, laboratory wipes
Surface-cleaning of the barcode scanner window
Kimwipes, or equivalent
Table 4 Preparatory steps
Step
Description
Hardware initialization
During hardware initialization, the system returns all motorized parts (i.e., the gantry, HSM module, and thermal cycler) back to their home positions. Additionally, the system checks for the presence of any tips on the micropipettor and, if necessary, disposes of those tips in the tip waste bin.
Instrument Health Check (IHC)
The system performs an IHC each time it is powered on (after login) and each time a protocol run is initiated. The checks performed during the IHC ensure that the hardware is functioning within specifications.
Teach-point verification
Auto-teaching is a process in which the system locates and records the positions of markers (called teach points) that are printed on the instrument deck. Auto-teaching ensures that, during a run, the micropipettor is accurately aligned with the tubes or wells at each deck position. You can configure the system settings to include teach-point verification as part of the initial IHC that is performed after powering up the instrument. During teach-point verification, the current teach-point locations are compared to those that were previously recorded during the most recent auto-teaching run to ensure that the values are sufficiently within range of each other. If the values do not fall within the expected range, the system prompts you to rerun auto-teaching.
Table 3 Colors and descriptions of the LED indicator lights in the plate filling area
LED Color
Instrument Status
Description
White
Ready
The lights are illuminated white when the system is idle but the door is open, when the system is performing auto-teaching or teach-point verification, and when a user is setting up a protocol run.
Blue
Ready
The lights are illuminated blue anytime the system is idle and the door is closed, including at completion of a protocol run. The lights are also blue when the system is performing diagnostic tests.
Green
Running
The lights are illuminated green when the system is running a protocol.
Red
Error
The lights are illuminated red when the system has encountered an error. Check the touchscreen for an error message containing further details.
WARNING During UV decontamination, the indicator lights are off and the instrument deck is illuminated by the UV light. Do not look directly at the UV light.
Table 5
Actions permitted for Standard and Advanced user account
Action
Permitted by Standard users?
Permitted by Advanced users?
Set up and run protocols
Yes
Yes
View data from their own protocol runs
Yes
Yes
Update the number of PCR cycles during run setup
No
Yes
View data from protocol runs of other users
No
Yes
Edit user accounts of other users
No
Yes
Edit chiller temperature setting
No
Yes
Install firmware and protocol updates
No
Yes
Delete diagnostic reports
No
Yes
Change default protocol version
No
Yes
Bypass reagent expiration error
No
Yes*
* Only permissible on the G9710A Magnis NGS Prep System.
Engineering Facts
14 facts · every claim linked to a page
Installation
The instrument must be installed by an Agilent engineer or authorized service provider, so installation labor and scheduling must be planned into the project.
Determines who can legally and safely commission the unit and affects project timeline and cost.
Source
“The system must be installed by an Agilent engineer or Agilent authorized service provider.”
Installation
Moving the instrument requires a forklift or lift table rated for at least 100 kg plus two people, so rigging and floor access must be arranged in advance.
Affects site access planning, manpower and handling equipment needed during delivery and placement.
Source
“To move the instrument, use an automated forklift or lift table that can lift at least 100 kg (220 lbs).”
Installation
The unit needs a 100–240 VAC, 50/60 Hz, 1000 W wall outlet, which drives the electrical circuit sizing for the lab bench.
Needed to verify the lab's power availability and circuit capacity before installation.
Source
“Connect the power cord to a wall output that provides 100–240 VAC, 50/60 Hz, 1000 W.”
Installation
The instrument must be on a grounded socket and preferably on an independent or dedicated AC circuit away from high-current devices.
Prevents electrical noise and nuisance tripping that could interrupt runs; guides circuit assignment.
Source
“Do not connect the instrument to the same circuit as other devices with a high current draw (e.g., freezers, centrifuges).”
Installation
Clearance must be maintained: 10 cm on each side, 18 cm at the back, 5 cm in front and 111 cm above for door opening.
Defines the bench footprint and overhead space required for ventilation and door operation.
Source
“Top of the instrument: 111 cm (44 inches) above to allow for opening the door.”
Installation
The instrument must be placed in a post-PCR laboratory environment, which constrains where in the lab workflow it can be sited.
Affects room selection and lab layout to avoid contamination of pre-PCR areas.
Source
“Place the instrument in a post-PCR laboratory environment.”
Operation
Ambient temperature must be kept between 15°C and 25°C, so HVAC capacity of the room must be verified.
Out-of-range temperature can degrade performance; drives room climate requirements.
Source
“Keep the ambient temperature between 15°C and 25°C (53.6°F to 77°F).”
Operation
Humidity must stay between 30% and 70% non-condensing, otherwise system performance can be impacted.
Requires humidity control or monitoring in the installation room to protect performance.
Source
“The laboratory humidity levels must be between 30% and 70% non-condensing.”
Operation
Maximum operating altitude is 2000 m, which must be checked for high-altitude sites.
Sites above this altitude may not be suitable without consulting the vendor.
Source
“Maximum altitude for instrument operation is 2000 m (6562 feet)”
Safety
The system is static sensitive and discharges above 8000 V can disrupt USB ports, so anti-static precautions are required in high-static environments.
Dictates ESD flooring, wrist straps and grounding measures at the installation site.
Source
“Electrostatic discharges greater than 8000 volts may interfere with the normal operation of the USB ports on the instrument.”
Operation
Only Agilent plates, seals, foils and mats rated to 120°C may be used, so third-party consumables are not acceptable.
Constrains consumable sourcing and prevents thermal damage or run failure.
Source
“Use only Agilent materials (plates, adhesive seals, foils, mats) intended for use on the Magnis/MagnisDx NGS Prep System.”
Maintenance
A 30-minute UV quick decontamination cycle is recommended before each protocol run, and a 2-hour extended cycle after spills.
Adds a recurring 30-minute step to the run schedule and defines spill recovery procedure.
Source
“The quick cycle is a 30-minute decontamination.”
Operation
Prepared libraries are held at 12°C on the thermal cycler for up to 72 hours, so collection must occur within that window.
Sets a hard deadline for sample retrieval and downstream scheduling after a run.
Source
“which is held at 12°C for up to 72 hours”
Cumplimiento
The MagnisDx variant is for IVD use while the G9710A Magnis is research use only, so model choice depends on the regulatory context.
Determines which model can be selected for clinical versus research workflows.
Source
“G9710A Magnis NGS Prep system: For Research Use Only. Not for use in diagnostic procedures.”