Installation
The chiller requires a three-phase 400 V supply with a 3x32 A fuse, so the site electrical infrastructure must be sized accordingly.
Determines the electrical connection, cable sizing and breaker rating needed at the installation site.
Source
“Power supply (3 Phase) 400V 3~ 50Hz”
Installation
Three-phase devices drawing less than 63 A are delivered with a cable but without a plug, so the customer must provide and fit the site plug.
Affects procurement and installation planning because the mating plug is not included.
Source
“Three-phase devices with current consumption less than 63A --> with cable, without plug”
Installation
The unit must be operated within an ambient temperature window of 5 to 32 °C, which constrains where it can be installed.
Room conditions at the installation site must be verified before commissioning.
Source
“min. ambient temperature 5 °C”
Performance
Cooling capacity is rated at 20 °C room temperature and drops if ambient temperature rises, so capacity must be derated for warmer rooms.
Prevents undersizing the chiller when the actual installation room is warmer than 20 °C.
Source
“Output data valid for: Room temperature 20°C. If the ambient temperature rises, the cooling capacity may drop.”
Installation
Voltage and frequency tolerances are coupled: a -5% voltage deviation is only allowed together with -2% frequency, not with +2%.
Site power quality must be checked against the combined tolerance rule, not voltage alone.
Source
“-5% voltage and +2% frequency -> not allowed!”
Operation
The flow rate is adjusted via a manual bypass valve on the rear of the chiller, so rear access is needed for balancing.
Installation layout must leave clearance at the rear for flow adjustment and service.
Source
“The flow rate can be adjusted via the manual bypass valve on the backside of the chiller.”
Safety
The refrigerant R-449A is classified A1 with GHS hazard H280, so refrigerant handling and ventilation precautions apply.
Affects site safety assessment and refrigerant handling procedures.
Source
“R-449A (A1, H280)”
Cumplimiento
The equipment emits as Class A, Group 1 per EN55011, which is industrial EMC classification and may restrict use in residential environments.
Determines whether the chiller can be installed in an environment with residential EMC requirements.
Source
“Classification (disturbance) to EN55011: Class A, Group 1”
Operation
The recommended thermofluid is a 50:50 water-monoethylene glycol mixture, which sets the fluid to be filled at commissioning.
Guides fluid selection and prevents use of incompatible or freeze-unsafe media.
Source
“Recommended thermofluid: Water - Monoethylene Glycol 50:50”
Installation
The pump connection is G3/4 male, so mating hoses and fittings must match this thread.
Needed to specify connection hoses and adapters before delivery.
Source
“Pump connection G3/4 male”
Selection
The tank holds between 160 and 175 litres, which sets the required fluid volume and expansion allowance.
Determines the quantity of thermofluid to procure and the expansion volume to plan.
Source
“min. filling capacity 160 l”
Installation
The unit is IP52, so it is protected against dust and dripping water but not against water jets or immersion.
Constrains cleaning methods and placement in wet or washdown areas.
Source
“Degree of Protection IP52”
Maintenance
The condenser is air-cooled with a high-efficiency fan, so adequate air flow and cleaning access around the condenser are required.
Affects placement clearances and the maintenance plan for condenser cleaning.
Source
“Condenser in air-cooled design, performance- optimized by a built-in high-efficiency fan motor.”