Operating lights, microscope, help access, system shutdown
Procedurepp. 45-48
Routine maintenance and cleaning procedures
Procedurepp. 49-50
Troubleshooting guidance for common issues
p. 22table, 2 rows
p. 24table, 7 rows
p. 38table, 6 rows
Table 1. Fuse specifications
Instrument
Fuse type
Agilent Cary 600 Series FTIR spectrometer
T4 AH 250 V, IEC601272-2 Sheet 5, 5x20 mm, Littelfuse 0215004 or equivalent
Agilent Cary 610 FTIR microscope (typical)
1FS1: T2.0 AH 250 V, IEC601272-1 Sheet 5, 5 x 20 mm, Littelfuse 0215020 or equivalent
Table 2. Cooling methods for available detectors
Detector
Cooling method
High-sensitivity MCT
Liquid nitrogen
Linearized high-sensitivity MCT
Liquid nitrogen
Linearized broadband MCT
Liquid nitrogen
Room temperature DLaTGS
None
Cooled DLaTGS
Peltier
Far-infrared DLaTGS
None
PbSe
None
Table 3. LED descriptions
Position
Condition
Comment
Top — Power/Scan
Flashing yellow
The spectrometer is initializing.
Top — Power/Scan
Solid yellow
The spectrometer has not correctly initialized and needs attention.
Top — Power/Scan
Solid green
The spectrometer has initialized and is ready.
Top — Power/Scan
Flashing green
The spectrometer is scanning.
Bottom — A/D over-range
Off
Normal operation.
Bottom — A/D over-range
Flashing blue
The A/D exceeds its maximum value. Reduce the sensitivity setting or increase the beam attenuation.
Engineering Facts
14 facts · every claim linked to a page
Safety
The instrument contains a helium-neon laser operating at 632.8 nm and is rated Class II (USA) or Class 2 (European), so laser safety controls must be observed.
Knowing the laser class and wavelength is essential for site safety assessment and for ensuring appropriate laser safety signage and controls are in place.
Source
“a helium-neon laser operating in the visible region at 632.8 nanometers. The instrument is rated at Class II (USA) or Class 2 (European).”
Safety
The spectrometer has an interlock switch that automatically turns off laser power when the interferometer compartment cover is opened, and this interlock must never be bypassed.
Installers and service personnel must verify the interlock functions correctly and must not defeat it, as it is a primary laser safety control.
Source
“The Agilent Cary 600 Series FTIR spectrometers incorporate an interlock switch that automatically turns off power to the laser if the interferometer compartment cover is opened.”
Safety
Liquid nitrogen used for cryogenically-cooled MCT detectors is at -196 °C and requires appropriate protective equipment during handling.
Operators must be trained and equipped for cryogenic handling before using MCT detectors, which affects detector selection and lab safety planning.
Source
“The liquid nitrogen used in this process is extremely cold (-196 °C, -320.8 °F) and can cause damage to the human body.”
Installation
Purge gas must be water-free air dried to a dew point of -70 °C or dry nitrogen, and a flow meter is required to monitor purge flow.
The purge gas supply specification determines what gas conditioning equipment and flow monitoring must be installed at the site.
Source
“Purge gas must be water-free air (dried to dew point of -70 °C) or dry nitrogen.”
Installation
The maximum purge flow rate is 10 L/min, and a second flow meter is strongly recommended for independent microscope purge control.
This sets the capacity requirement for the purge gas delivery system and the need for flow metering hardware during installation.
Source
“Flow rate for purge: 10 L/min (20 ft3/hr) maximum; you must have a flow meter to monitor the flow of the purge gas.”
Installation
A pressure regulator is required if the purge gas source pressure exceeds 60 psi (420 kPa).
Sites with high-pressure gas supplies must include a regulator in the installation to avoid overpressurizing the instrument.
Source
“A regulator is required if the source pressure is greater than 60 psi (420 kPa).”
Installation
At least 50 mm of side clearance and 150 mm at the rear must be maintained for free air circulation around the system.
Bench or floor layout must account for these clearances to prevent overheating and ensure adequate ventilation.
Source
“Allow at least 50 mm (2 in.) of space on the sides, and 150 mm (6 in.) at the rear of the system to permit free air circulation.”
Installation
The spectrometer fuse is T4 AH 250 V, 5x20 mm (Littelfuse 0215004 or equivalent), and the Cary 610 microscope uses T2.0 AH 250 V fuses.
Correct fuse ratings must be verified at installation and spare fuses stocked to avoid downtime or unsafe substitutions.
Source
“T4 AH 250 V, IEC601272-2 Sheet 5, 5x20 mm, Littelfuse 0215004 or equivalent”
Operation
If the spectrometer has been off for an extended period, it takes about 30 minutes to reach operating temperature, and data collected before then may be inaccurate.
Operators must allow adequate warm-up time before collecting data to avoid inaccurate results.
Source
“If the spectrometer has been turned off for an extended period, it will take about 30 minutes to reach its operating temperature.”
Operation
Filling the detector Dewar requires about 475 mL of liquid nitrogen, then about 20 minutes to reach thermal equilibrium, followed by a top-up of about 200 mL.
This defines the liquid nitrogen quantity and timing needed per fill, which affects consumables planning and operating procedure.
Source
“This takes about 2.5 medium-sized Styrofoam cups (475 milliliters, 16 ounces) of liquid nitrogen.”
Operation
Overfilling the Dewar can freeze the elastomer o-ring seal, causing loss of vacuum and requiring the detector assembly to be returned for pump-down.
Operators must be trained not to overfill, as this causes costly detector damage and downtime.
Source
“Do not fill the Dewar to the top. This can freeze the elastomer o-ring Dewar seal causing a loss of vacuum.”
Operation
Agilent recommends leaving the spectrometer powered on unless it will be idle for some time or moved, and disabling the screen saver to avoid interference with long data collections.
This affects daily operating practice and power management, and helps prevent data collection interruptions.
Source
“Unless the system will be idle for some time or will be moved, we recommend that the spectrometer not be turned off.”
Maintenance
Only maintenance procedures specifically mentioned in the manual may be carried out by the operator; all others require Agilent-trained, qualified, or authorized representatives.
This defines the boundary of user-serviceable maintenance and affects service contract and training planning.
Source
“Any maintenance procedures not specifically mentioned should be carried out only by Agilent-trained, Agilent-qualified or Agilent-authorized representatives.”
Conformité
The equipment is Class A for EMC and is intended for use in electromagnetic environments outside of the home, suitable for professional use.
Class A EMC classification affects installation location and potential interference with nearby sensitive equipment.
Source
“This equipment is Class A suitable for professional use and is for use in electromagnetic environments outside of the home.”