210-MS, 220-MS, and 225-MS GC/MS Ion Trap Mass Spectrometer Hardware Operation Manual
Technical Reference Summary
Covered Models & Document Scope
Covers the Varian 210-MS, 220-MS, and 225-MS Ion Trap Mass Spectrometers. Variant-specific differences are called out for the 210-MS/220-MS (separate foreline pump, turbomolecular pump replacement procedure) and the 225-MS (Integrated Pumping Solution, different turbomolecular pump replacement procedure, different wall clearance). Chemical Ionization (CI) source installation and operation is included.
Section-by-Section Technical Breakdown
Describes the four principal components of the 210-MS, 220-MS, and 225-MS GC/MS systems: gas chromatograph, mass spectrometer, data system, and optional autosampler. Explains the sample path from GC injection through the capillary column and transfer line into the ion trap, where electron or chemical ionization occurs and ions are detected by an electron multiplier. Details the electronics and analyzer compartments, cooling fans, vacuum system, transfer line, ion trap assembly, ion gauge, electronic assemblies, foreline pump, data system, and autosampler.
- Principal components: GC, MS, data system, optional autosampler
- Electronics compartment contains controller board and power board
- Analyzer compartment contains transfer line, vacuum manifold with ion trap, vacuum pump/controller/turbo power supply, RF coil and generator, pneumatics manifold, manifold board, and Integrated Pumping Solution (225-MS only)
- Two rear-panel cooling fans: analyzer compartment fan cools turbomolecular pump bearing end; electronics section fan cools controller and power boards
- 210-MS/220-MS must be at least 15.3 cm (6 in.) from a wall; 225-MS at least 25.4 cm (10 in.)
- Do not block cooling fan air intakes
Describes the vacuum system that evacuates water vapor, air, and carrier gas from the ion trap assembly. Principal components include the vacuum manifold, turbomolecular pump, foreline pump, vent valve, cal gas valve, and CI reagent gas valves. The 210-MS and 220-MS use a separate foreline pump, while the 225-MS uses an Integrated Pumping Solution containing both turbomolecular and foreline pumps.
- Turbomolecular pump provides approximately 10-5 Torr (1.33x10-3 Pa) in the manifold region outside the ion trap assembly
- Turbomolecular pump rated at 80 L/s, operates at 60 L/s, air cooled and thermostatically protected
- Pump automatically shuts down if housing temperature near bearing exceeds 60 °C
- TURBOMOLECULAR SPEED OK signal is sent when speed is ≥92% of maximum operating speed; below 92% the filament, electron multiplier, RF generator, CI reagent gas valve, and cal gas valve turn off automatically
- Eight electrical feed-throughs pass through the analyzer flange: one electron gate, three filament assembly, two axial modulation, one high voltage to electron multiplier cathode, one ion current signal from electron multiplier anode
- A feed-through through the underside of the manifold provides RF voltage to the ring electrode
- Ion gauge monitors pressure inside the manifold
- Vent valve is manually operated via a toggle arm on the front of the instrument
- Calibration compound is perfluorotributylamine (PFTBA) or C12F27N, also known as fluorocarbon-43 (FC-43)
The transfer line is a stainless-steel tube that couples the GC to the MS and keeps the GC column warm as it enters the MS. It is 12 cm (5 in.) long with a diameter of 4.1 cm (1.6 in.). One end enters the GC oven; the transfer-line tip enters the vacuum manifold and goes into the ion trap.
- Transfer line is hot; ensure it is cool before touching or use protective gloves
- Transfer line is a stainless-steel weldment
- Transfer line tip enters the vacuum manifold and goes into the ion trap
Covers installation and operation of the chemical ionization source, including CI reagent gas requirements, setting up the reagent gas supply, checking reagent gas plumbing for leaks, setting CI reagent flow, default parameters for gaseous and liquid CI reagents, ion intensities for standard CI reagents, liquid CI reagents, installing the liquid CI inlet, filling and refilling the liquid CI reservoir bulb, preserving liquids in reservoirs, setting flows of vapor from liquid CI reagents, and switching to gaseous CI reagent.
- Flush gas line of air and water vapor by evacuating the CI reagent supply line for about 30 minutes
- If excess water vapor is indicated by a high 19/18 ratio, there may be water in the gas line or an atmospheric air leak
- To flush excess water, open main valve on lecture bottle, turn CI needle valve fully counterclockwise, open CI gas solenoid valves and pump down about 1 hour, then close main valve and pump down about 15 minutes
- Check tightness of CI GAS fitting on rear of instrument and fitting on pressure regulator if large air leak
- CI button is green when valves are open; black or red when closed
Provides maintenance procedures for the foreline pump (210-MS and 220-MS only), oil mist cartridge, cooling fans, turbomolecular pump replacement (210-MS/220-MS and 225-MS), ion trap servicing, electron multiplier replacement, filament replacement, ion trap oven removal, trap component cleaning and reassembly, analyzer assembly removal and reinstallation, transfer line retraction and installation, vent closing, MS turn-on, trap bake-out, ion trap operation check, calibration compound vial filling, and moving the MS.
- Foreline pump oil checking, purging, changing, and flushing procedures for 210-MS and 220-MS
- Oil mist cartridge replacement for 210-MS, 220-MS, and 225-MS; DS-42 and DS-102 oil mist eliminators
- Turbomolecular pump replacement procedures differ for 210-MS/220-MS and 225-MS
- Ion trap servicing includes turning off MS, retracting transfer line, removing analyzer assembly, replacing electron multiplier, replacing filament(s), removing ion trap oven, cleaning trap components, reassembling trap, reinstalling trap oven assembly, repositioning electron multiplier, reinstalling analyzer assembly, installing transfer line, closing vent, turning on MS, baking out trap, checking ion trap operation, and filling calibration compound vial
- Moving the MS procedures differ for 210-MS/220-MS and 225-MS
Describes troubleshooting procedures in order: data system, GC, then MS. Covers isolating the problem, checking the data system, GC, and MS, resolving problems with spectra (no spectrum, loss of high mass peaks, missing part of the spectrum, poor resolution, high baseline at high masses, trap calibration fails), checking for leaks, removing high water levels, using leak detection gas, repairing large and small-to-moderate air leaks, checking GC connections, removing and installing capillary columns, troubleshooting the GC, running the COLTEST sample, and troubleshooting chromatographic problems.
- Check system in order: data system, GC, MS
- Auto Tune provides information about system performance; diagnostics program tests hardware and isolates simple ion trap problems such as air leaks, burned-out filaments, and high contamination levels
- If diagnostics fail, after correcting the problem click the Reset button before further testing
- Bake out the MS for at least 2 hours before doing troubleshooting
- To isolate MS, remove column from injector and plug its end with a septum; maintain column and transfer line at ambient temperature; no need to vent MS vacuum system
- To isolate MS further, remove column from ion trap by shutting down system and capping transfer line with a no-hole ferrule
- Use leak detection gas such as Freon or argon; leak at transfer line produces immediate response; leak from GC injector takes about 90 seconds
- For argon leak detection set mass range 35 to 50; for Freon set 80 to 110; argon mass peak of interest is mass 40
- Leak detection method: electron multiplier 100 V below 105 setting, AGC off, ion time 100 μsec, filament emission current 10 μA, scan range m/z 35 to 50 (or 80 to 110)
- Check gaskets and fittings for leaks in order: cal gas tube fitting on pneumatics manifold, vent valve fitting on manifold, top vacuum manifold flange
- COLTEST mixture part number 392027300; run with 30-m DB-5 column (0.25 mm ID, 0.25 μm film thickness)
- COLTEST mixture includes polar/active compounds 1-octanol, 2,6-dimethylphenol, 2,6-dimethylaniline and nonpolar decane and dodecane at approximate levels of 1 ppm in hexane
Lists related documents, parts and supplies including kits, assemblies, boards, cables, trap components, pump spares, pumps, pump conversion parts, GC spares, tools, test samples, other supplies, and CI parts/spares. Also provides Varian Service contact information and the information to provide when calling for support.
- Parts and supplies organized into kits, assemblies, boards, and cables; trap components; pump spares, pumps, pump conversion parts; GC spares; tools, test samples, and other supplies; CI parts/spares
- When calling Varian Customer Support, provide MS serial number (inside front panel), installed options, and diagnostics test results
- For GC problems provide GC model, AutoSampler model, injector type, cryogenics, and GC column information
- For computer/software problems provide computer manufacturer and model, Windows version, mouse driver version, printer manufacturer and model, network configuration, printouts of autoexec.bat and config.sys, and MS Workstation software version
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Turbomolecular pump speed must be ≥92% of maximum operating speed for the TURBOMOLECULAR SPEED OK signal to enable the filament, electron multiplier voltage, RF generator, CI reagent gas valve, and cal gas valve. p.15 ↗ | If pump speed falls below 92%, these components turn off automatically, indicating a major air leak or overheated pump; check vacuum integrity and pump cooling. | 210-MS, 220-MS, 225-MS |
| Turbomolecular pump automatically shuts down if the pump housing temperature near the bearing exceeds 60 °C. p.15 ↗ | Ensure adequate cooling airflow and do not block cooling fan air intakes; overheating will stop the pump and disable analysis. | 210-MS, 220-MS, 225-MS |
| Minimum wall clearance is 15.3 cm (6 in.) for 210-MS/220-MS and 25.4 cm (10 in.) for 225-MS. p.13 ↗ | Install the instrument with these clearances to prevent hot air from the GC oven from affecting the MS and to allow proper cooling. | 210-MS/220-MS and 225-MS respectively |
| Capillary column should project about 1 mm (1/32 in.) from the transfer line tip; tighten brass nut with a 5/16-in. wrench until snug, but do not over tighten. p.84 ↗ | Correct column position ensures proper chromatography and prevents leaks; recheck position after tightening as it may change. | 210-MS, 220-MS, 225-MS |
| Bake out the MS for at least 2 hours before doing troubleshooting. p.68 ↗ | Insufficient bake-out can cause misleading spectra or calibration failures; always bake out before diagnosing spectral problems. | 210-MS, 220-MS, 225-MS |
| For leak detection with argon, set mass range 35 to 50 and monitor mass 40; for Freon, set mass range 80 to 110. p.80 ↗ | Using the correct mass range and peak ensures sensitive and specific leak detection. | 210-MS, 220-MS, 225-MS |
| Leak detection method parameters: electron multiplier 100 V below the 105 setting, AGC off, ion time 100 μsec, filament emission current 10 μA. p.80 ↗ | These settings reduce the risk of damaging the filaments or multiplier during leak checking. | 210-MS, 220-MS, 225-MS |
| A leak at the transfer line (high vacuum side) produces an immediate response; a leak from the GC injector takes about 90 seconds to see a response. p.80 ↗ | Response timing helps localize the leak source; injector leaks do not require venting the system, but transfer line connection leaks require shutdown and venting. | 210-MS, 220-MS, 225-MS |
| If trap temperature is too high, the height of the mass 614 peak may be reduced, and the mass 502 peak may disappear entirely above 200 °C. p.72 ↗ | Reduce trap oven temperature to 150 °C and wait 2 hours for thermal equilibration to observe all cal gas ions. | 210-MS, 220-MS, 225-MS |
| To flush excess water from the CI gas line, open main valve on lecture bottle, turn CI needle valve fully counterclockwise, open CI gas solenoid valves and pump down about 1 hour, then close main valve and pump down about 15 minutes. p.34 ↗ | Proper flushing removes water vapor that can degrade CI spectra and cause high 19/18 ratio. | 210-MS, 220-MS, 225-MS with CI |
| COLTEST mixture part number is 392027300; run with a 30-m DB-5 column (0.25 mm ID, 0.25 μm film thickness). p.82 ↗ | Use this standard test sample to troubleshoot injector and column problems and to verify chromatographic performance. | 210-MS, 220-MS, 225-MS |
| For programmable SPI or 1079 injector, a typical setting is 20 °C below the solvent boiling point, with column temperature at the solvent boiling point. p.85 ↗ | This helps prevent solvent tailing or broadening due to incorrect temperature control. | GC with SPI or 1079 injector |
| If using sandwich injection, reduce the solvent plug to 0.5 μL. p.85 ↗ | Reduces solvent flashing in hot injectors and improves peak shape. | GC with 1077 or 1079 injector |
| The calibration compound is perfluorotributylamine (PFTBA) or C12F27N, also known as fluorocarbon-43 (FC-43). p.14 ↗ | Use the correct calibration compound for tuning and calibration; a small glass vial attached to the valve assembly holds the compound. | 210-MS, 220-MS, 225-MS |
| The transfer line is 12 cm (5 in.) long and has a diameter of 4.1 cm (1.6 in.). p.16 ↗ | Ensures proper fit and thermal connection between GC and MS; handle with care as it is hot. | 210-MS, 220-MS, 225-MS |
| Eight electrical feed-throughs pass through the analyzer flange: one electron gate, three filament assembly, two axial modulation, one high voltage to electron multiplier cathode, one ion current signal from electron multiplier anode. p.15 ↗ | Understanding feed-through functions aids in troubleshooting electrical connections and signal issues. | 210-MS, 220-MS, 225-MS |
| If diagnostics fail, after the problem is corrected, click the Reset button before doing further testing. p.68 ↗ | Prevents false failures and ensures diagnostics run from a clean state. | 210-MS, 220-MS, 225-MS |
| To isolate the MS, remove the column from the injector and plug its end with a septum; maintain column and transfer line at ambient temperature to prevent degradation of the stationary phase. p.68 ↗ | This procedure minimizes air input and does not require venting the MS vacuum system. | 210-MS, 220-MS, 225-MS |
Faults & Troubleshooting
| Code / Symptom | Possible Cause | Remedy | Note |
|---|---|---|---|
| No Spectrum p.68 ↗ | Method segment is a FIL/MUL Delay and ionization is EI (AUTO or FIXED) mode; filament is open; turbomolecular pump has stopped; RF adjustment required; instrument parameters inappropriate; trap incorrectly assembled; electronics problem; system has not finished baking out. | Run Diagnostics to detect hardware problems; bake out MS for at least 2 hours; investigate listed causes; check filament, turbomolecular pump, RF adjustment, method parameters, trap assembly, electronics. | See Resolving Problems with Spectra |
| Loss of High Mass Peaks p.71 ↗ | RF ramp needs adjustment; too many low mass ions (e.g., air or water leak); improper ionization storage levels (settings too low); high trap temperatures may cause loss of high mass cal gas peaks. | Bake out MS for at least 2 hours; check for air leak; check RF ramp adjustment; reduce trap temperature to 150 °C; ensure method contains EI AGC ionization mode and default values for other parameters. | See Loss of High Mass Peaks |
| Missing Part of the Spectrum p.71 ↗ | RF adjustment may be required, particularly if ion trap temperature was just changed; ionization RF level may be incompatible with scan range; trap temperature may be too high to observe all cal gas ions. | Check RF adjustment; check RF storage level; reduce trap oven temperature to 150 °C and wait 2 hours for thermal equilibration. | See Missing Part of the Spectrum |
| Poor Resolution with Acceptable Air and Water Levels p.72 ↗ | Too many ions in the trap (e.g., contamination or high column bleed); axial modulation value too high or too low; axial modulation not functioning properly. | Bake out MS for at least 2 hours; check ion content of trap; check axial modulation setting. | See Poor Resolution with Acceptable Air and Water Levels |
| High Baseline at High Masses p.74 ↗ | Not explicitly stated; if baseline ramps up, electrode surfaces may need cleaning. | Shut down MS and carefully clean electrode surfaces with a lint-free cloth. | See High Baseline at High Masses |
| Trap Calibration Fails after Calibration Ions are Identified p.74 ↗ | Electron multiplier voltage is too low; cal gas pressure is too low. | Check electron multiplier voltage via Auto Tune > Electron Multiplier Tune > Start Auto Tune; check cal gas pressure via Manual Control > Adjustments > Adjust Cal Gas and set to mid to high end of scale. | See Trap Calibration Fails after Calibration Ions are Identified |
| Solvent Tailing or Broadening p.85 ↗ | Poor column installation resulting in dead volume in the injector; solvent flashing in hot injector (usually 1077 or 1079); incorrect temperature control using programmable SPI or 1079 injector. | Reinstall column in injector; check column seal with insert in SPI/1079; ensure good cut on column; check 1077/1079 injector insertion depth; reduce injection speed for hot injectors; reduce injector temperature if possible; reduce solvent plug to 0.5 μL for sandwich injection; set SPI to 20 °C below solvent boiling point and column temperature at solvent boiling point. | See Troubleshooting Chromatographic Problems |
Technical Data
| Parameter | Value | Condition |
|---|---|---|
| Manifold vacuum | approximately 10-5 Torr p.15 ↗ | normal operating conditions, outside ion trap assembly |
| Manifold vacuum | 1.33x10-3 Pa p.15 ↗ | normal operating conditions, outside ion trap assembly |
| Turbomolecular pump rated pumping speed | 80 liters/second p.15 ↗ | |
| Turbomolecular pump operating pumping speed | 60 liters/second p.15 ↗ | |
| Turbomolecular pump over-temperature shutdown | 60 °C p.15 ↗ | pump housing near bearing exceeds this temperature |
| Turbomolecular pump speed OK threshold | 92 % of maximum operating speed p.15 ↗ | speed equal to or greater than this value enables filament, multiplier, RF, CI a |
| Transfer line length | 12 cm p.16 ↗ | |
| Transfer line length | 5 in. p.16 ↗ | |
| Transfer line diameter | 4.1 cm p.16 ↗ | |
| Transfer line diameter | 1.6 in. p.16 ↗ | |
| Minimum wall clearance | 15.3 cm p.13 ↗ | 210-MS or 220-MS |
| Minimum wall clearance | 6 in. p.13 ↗ | 210-MS or 220-MS |
| Minimum wall clearance | 25.4 cm p.13 ↗ | 225-MS |
| Minimum wall clearance | 10 in. p.13 ↗ | 225-MS |
| Capillary column projection from transfer line tip | about 1 mm p.84 ↗ | column installation |
| Capillary column projection from transfer line tip | 1/32 in. p.84 ↗ | column installation |
| Transfer line nut tightening wrench size | 5/16 in. p.84 ↗ | |
| Trap temperature for troubleshooting high-mass loss | 150 °C p.71 ↗ | reduce trap oven temperature and wait 2 hours for thermal equilibration |
| Trap temperature above which mass 502 peak may disappear | 200 °C p.72 ↗ | cal gas ions |
| Minimum bake-out time before troubleshooting | 2 hours p.68 ↗ | |
| CI reagent line evacuation time | about 30 minutes p.34 ↗ | flushing gas line of air and water vapor |
| CI gas line water flush pump-down time | about 1 hour p.34 ↗ | CI solenoid valves open, main cylinder valve open |
| CI gas line water flush final pump-down time | about 15 minutes p.34 ↗ | main cylinder valve closed, CI solenoid valves open |
| Leak detection response time from GC injector | about 90 seconds p.80 ↗ | leak detection gas |
| Argon leak detection mass range | 35 to 50 m/z p.80 ↗ | argon leak-detection gas |
| Freon leak detection mass range | 80 to 110 m/z p.80 ↗ | Freon leak-detection gas |
| Argon leak detection mass peak | 40 m/z p.80 ↗ | argon leak-detection gas |
| Leak detection electron multiplier voltage offset | 100 V below the 105 setting p.80 ↗ | leak detection method |
| Leak detection ion time | 100 μsec p.80 ↗ | AGC off |
| Leak detection filament emission current | 10 μA p.80 ↗ | leak detection method |
| COLTEST mixture part number | 392027300 p.82 ↗ | |
| COLTEST column | 30-m DB-5, 0.25 mm ID, 0.25 μm film thickness p.82 ↗ | COLTEST sample chromatographic conditions |
| COLTEST compound concentration | approximate levels of 1 ppm in hexane p.85 ↗ | decane and dodecane |
| SPI injector typical setting | 20 °C below the solvent boiling point p.85 ↗ | programmable SPI or 1079 injector |
| Sandwich injection solvent plug | 0.5 μL p.85 ↗ | if using sandwich injection |