VHS-10 & VHS-400 Diffusion Pumps
Technical Reference Summary
Covered Models & Document Scope
Covers VHS-10 and VHS-400 diffusion pumps, including 4400 W and 5100 W heater variants; includes operating specifications, dimensions, installation, operation, troubleshooting, maintenance, and replacement parts.
Section-by-Section Technical Breakdown
Describes the VHS-10 and VHS-400 diffusion pumps, their operating specifications, and performance characteristics. Includes tables of operating specifications for both models and notes that data refer to pumps charged with DC-704 diffusion pump fluid.
- Operating specifications are provided for 4400 W and 5100 W heater variants.
- Pumping speed data are given for air with standard and extended cold caps.
- Warmup time is 12 minutes; cooldown time without Quick Cool is 65–67 minutes.
- Fluid charge is 1000 cc; recommended backing pump size is 30 cfm.
Presents speed and throughput curves for the VHS-10 and VHS-400 pumps. These curves allow users to estimate performance at different inlet pressures.
- Speed and throughput curves are provided for VHS-10 and VHS-400.
- Curves are referenced in Figures 1-1 and 1-2.
Provides dimensions and outline drawings for the VHS-10 and VHS-400 pumps with ASA flanges. Includes Table 1-3 for dimensions.
- Dimensions are listed in Table 1-3.
- Outline drawings with ASA flanges are shown in Figure 1-3.
Shows the electrical wiring diagram and operating characteristics for the pumps. Includes heater connections and electrical supply requirements.
- Wiring diagram is provided for electrical connections.
- Heater circuit resistance values are given for 380 V and 480 V operation.
Covers unpacking, pump oil installation, vacuum system connections, cooling water connections, electrical connections, and thermal switch connections. Provides procedures and cautions for safe installation.
- Unpacking instructions and inspection for shipping damage.
- Pump oil installation procedure and fluid charge of 1000 cc.
- Vacuum system connections including inlet and foreline.
- Cooling water connections with pressure drop across coils of 5 psi.
- Electrical connections and thermal switch wiring.
Describes startup and shutdown procedures for the diffusion pumps. Includes precautions to avoid hazards such as overpressure and overtemperature.
- Startup procedure includes checks for cooling water and proper backing.
- Shutdown procedure includes cooldown time and venting precautions.
- Do not operate without continuous evacuation below 0.5 Torr.
Provides guidance on diagnosing leakage, outgassing, and poor pump or system performance. Includes a troubleshooting guide table with faults, probable causes, and corrective actions.
- Check inlet and foreline connections, drain and fill plugs, and compression fittings for leaks.
- Estimate gas load by isolating the system and measuring pressure rise.
- Table 4-1 lists faults, probable causes, and corrective actions.
Covers periodic inspections, cleaning, and disassembly/reassembly procedures. Includes replacement parts information in Appendix B.
- Periodic inspections include checking fluid level and cooling water flow.
- Cleaning procedures for pump components.
- Disassembly and reassembly procedures with reference to figures.
- Replacement parts listed in Table B-1.
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Pumping speed for air is 5300 l/s with standard cold cap and 4200 l/s with extended cold cap for both 4400 W and 5100 W variants. p.19 ↗ | Select cold cap type based on required pumping speed; extended cold cap reduces speed but may improve other performance aspects. | VHS-10 and VHS-400 |
| Warmup time is 12 minutes. p.20 ↗ | Allow sufficient time for pump to reach operating temperature before processing. | VHS-10 and VHS-400 |
| Cooldown time without Quick Cool is 65 minutes for 4400 W and 67 minutes for 5100 W. p.20 ↗ | Plan shutdown procedures accordingly; Quick Cool option can reduce cooldown time. | VHS-10 and VHS-400 |
| Fluid charge is 1000 cc. p.20 ↗ | Use correct amount of diffusion pump fluid; overfilling or underfilling can affect performance. | VHS-10 and VHS-400 |
| Recommended backing pump size is 30 cfm. p.20 ↗ | Select a backing pump with at least this capacity for proper operation. | VHS-10 and VHS-400 |
| Pressure drop across cooling coils is 5 psi. p.20 ↗ | Ensure cooling water supply can provide adequate flow without excessive pressure drop. | VHS-10 and VHS-400 |
| Heater circuit resistance for 4400 W at 380 V is 62.4/62.4/124.8 Ohms (L1-L2/L2-L3/L1-L3); at 480 V it is 99.5/99.5/199.0 Ohms. p.20 ↗ | Verify heater resistance matches supply voltage to ensure correct power and avoid damage. | VHS-10 and VHS-400 4400 W |
| Heater circuit resistance for 5100 W at 380 V is 53.8/53.8/107.6 Ohms; at 480 V it is 85.8/85.8/171.6 Ohms. p.20 ↗ | Verify heater resistance matches supply voltage for 5100 W variants. | VHS-10 and VHS-400 5100 W |
| Weight is 150 lbs (68 kg). p.20 ↗ | Use appropriate lifting equipment; pump exceeds 81 kg and requires power-assisted lifting. | VHS-10 and VHS-400 |
| Do not operate the diffusion pump without continuous evacuation below 0.5 Torr. p.13 ↗ | Ensure foreline pressure is maintained below 0.5 Torr during operation to prevent overheating and damage. | VHS-10 and VHS-400 |
| Do not run pump without cooling water. p.14 ↗ | Cooling water is essential; interlock or alarm should be provided to prevent operation without cooling. | VHS-10 and VHS-400 |
| Do not run pump with low level of pump fluid. p.14 ↗ | Monitor fluid level and maintain at recommended charge to avoid overtemperature. | VHS-10 and VHS-400 |
| Do not pressurize the pump body above 1 atm. p.15 ↗ | Ensure system design prevents overpressure; use pressure relief devices. | VHS-10 and VHS-400 |
| Diffusion pump heaters operate at voltages up to 480 V. p.17 ↗ | Use appropriate electrical safety measures and wiring for high voltage. | VHS-10 and VHS-400 |
| Pumps weigh in excess of 180 lbs (81 kg) and have largest dimension 1 to 2 meters. p.17 ↗ | Use power-assisted lifting equipment and proper rigging to avoid injury. | VHS-10 and VHS-400 |
Faults & Troubleshooting
| Code / Symptom | Possible Cause | Remedy | Note |
|---|---|---|---|
| Poor system pressure p.36 ↗ | Leaks in system, virtual or real | Locate and repair | Table 4-1 |
| Poor system pressure p.36 ↗ | High process gas load | Measure gas load, eliminate cause | Table 4-1 |
| Poor system pressure p.36 ↗ | System dirty | Clean system to reduce outgassing | Table 4-1 |
| Poor ultimate pressure p.36 ↗ | Contaminated pump fluid | Examine and clean pump; replace fluid | Table 4-1 |
| Poor ultimate pressure p.36 ↗ | Low heat input | Check voltage. Check for continuity, burned-out element, poor thermal contact | Table 4-1 |
| Poor ultimate pressure p.36 ↗ | Inadequate cooling water flow | Check water pressure. Check tubing for obstructions and backpressure | Table 4-1 |
| Poor ultimate pressure p.36 ↗ | Cooling water is too cold | Check temperature | Table 4-1 |
| Poor ultimate pressure p.36 ↗ | Cooling water flow is too high | Adjust water flow | Table 4-1 |
| Poor ultimate pressure p.36 ↗ | High forepressure | Check for leak in foreline, poor mechanical pump performance, breakdown of mechanical pump fluid | Table 4-1 |
| Poor ultimate pressure p.36 ↗ | Water in Quick Cool coil | Check and remove cause | Table 4-1 |
| Slow pumpdown p.36 ↗ | Low heat input | Check heaters | Table 4-1 |
| Slow pumpdown p.36 ↗ | Low fluid level | Add fluid | Table 4-1 |
| Slow pumpdown p.36 ↗ | Malfunctioning pump assembly | Check and repair or replace | Table 4-1 |
| Improperly located jets p.36 ↗ | Damaged jet system | Table 4-1 | |
| Inlet pressure surges p.36 ↗ | Incorrect heater input | Check and correct | Table 4-1 |
| Inlet pressure surges p.36 ↗ | Fluid outgassing | Condition fluid by operating the pump for a few hours | Table 4-1 |
| Inlet pressure surges p.36 ↗ | Leak in system ahead of pump inlet | Check and correct | Table 4-1 |
| High chamber contamination of the pump fluid p.37 ↗ | Forepressure too high | Check for leak in foreline, poor mechanical pump performance, breakdown of pump fluid, and incorrect valve operation | Table 4-1 |
| High chamber contamination of the pump fluid p.37 ↗ | Prolonged operation in overload range: 10-3 Torr | Adhere to operating procedures | Table 4-1 |
| High chamber contamination of the pump fluid p.37 ↗ | Cutting over from the backing pump too early in the pump down cycle | Cut over at a lower chamber pressure | Table 4-1 |
| High chamber contamination of the pump fluid p.37 ↗ | Improper system operation and air release procedures | Adhere to operating procedures | Table 4-1 |
| Pump will not start p.37 ↗ | Safety circuits or protective devices prevent contactor from staying closed | Check utilities, flow devices switches, interlocks. Check thermostat operation | Table 4-1 |
Technical Data
| Parameter | Value | Condition |
|---|---|---|
| Pumping speed | 5300 with std cold cap l/s p.19 ↗ | Air, 4400 W |
| Pumping speed | 4200 with extended cold l/s p.19 ↗ | Air, 4400 W |
| Pumping speed | 5300 with std cold cap l/s p.19 ↗ | Air, 5100 W |
| Pumping speed | 4200 with extended cold l/s p.19 ↗ | Air, 5100 W |
| Warmup time | 12 minutes p.20 ↗ | |
| Cooldown time without Quick Cool | 65 minutes p.20 ↗ | 4400 W |
| Cooldown time without Quick Cool | 67 minutes p.20 ↗ | 5100 W |
| Fluid charge | 1000 cc p.20 ↗ | |
| Recommended backing pump size | 30 cfm p.20 ↗ | |
| Pressure drop across coils | 5 psi p.20 ↗ | |
| Heater circuit resistance | 62.4/62.4/124.8 Ohms p.20 ↗ | L1-L2/L2-L3/L1-L3, 4400 W at 380 V |
| Heater circuit resistance | 99.5/99.5/199.0 Ohms p.20 ↗ | L1-L2/L2-L3/L1-L3, 4400 W at 480 V |
| Heater circuit resistance | 53.8/53.8/107.6 Ohms p.20 ↗ | L1-L2/L2-L3/L1-L3, 5100 W at 380 V |
| Heater circuit resistance | 85.8/85.8/171.6 Ohms p.20 ↗ | L1-L2/L2-L3/L1-L3, 5100 W at 480 V |
| Weight | 150 (68) lbs (kg) p.20 ↗ |