Nabertherm L 9/11 BO
Nabertherm ·Made in Germany · In Active Production

Nabertherm L 9/11 BO

Nabertherm L 9/11 BO — Muffle furnaces.

The L 9/11 BO is a 9-litre ashing furnace with integrated exhaust gas cleaning, rated to 1100 °C and powered by a 7 kW three-phase connection. It is the smallest BO-series modification, distinguished by a 75 g organic load limit and 1.0 g/min evaporation rate, intended for controlled ashing of organic samples without releasing process fumes.

Full specifications

Core Performance & Functional Specifications
Chamber volume 9 l
Electrical connection 3-phase
Nominal power 7 kW
Max. evaporation rate of organic substances mfr 1.0
Inner dimensions (W × D × H) mfr 230 × 240 × 170 mm
Outer dimensions (W × D × H) mfr 415 × 575 mm
Dimensions, Weight & Mechanical Design
Weight 60 kg
Max. loading weight of organic substances mfr 75
Operating Conditions, Environment & Protection
Max temperature 1100 °C

Description

Construction and series positioning

Process behavior and limits

Electrical and control

Installation and operation

Integration & Operating Notes

Process Limits
Do not exceed 75 g organic load per batch

The integrated exhaust gas cleaning is sized for a maximum loading weight of 75 g of organic substances. Larger sample batches generate more fumes than the cleaning stage can handle, risking incomplete combustion and contamination of the exhaust path. Split samples or use the larger L 40/11 BO for heavier loads.

Factory Specification Sheet
Process Limits
Keep the evaporation rate at or below 1.0 g/min

The maximum evaporation rate of organic substances is 1.0 g/min. The heating program must be ramped so that the sample does not release volatiles faster than this; a fast ramp on a wet or high-volatile sample can exceed the limit even when the total load is under 75 g.

Factory Specification Sheet
Electrical
Confirm site voltage and phase before connecting the 7 kW load

The furnace is a 7 kW three-phase unit, but the verified facts do not state the operating voltage or frequency. The supply must be matched to the nameplate before connection; connecting a three-phase unit to an incompatible supply risks damage to the heating and control circuits.

Factory Specification Sheet
Maintenance
Plan exhaust cleaning stage service around ashing duty

Because exhaust gas cleaning is integrated, its condition depends on the organic load history. No service interval is given in the verified facts; the unit's own manual should be consulted for inspection and replacement intervals of the cleaning stage, and the 75 g / 1.0 g/min limits should be logged to anticipate servicing.

Factory Specification Sheet

Selection & Integration Q&A

When should I choose the L 9/11 BO rather than the larger L 40/11 BO in the same series?

Pick the L 9/11 BO for small ashing batches within its 75 g organic load and 1.0 g/min evaporation limits, where its 9-litre chamber and 415 × 575 mm footprint fit the bench. Choose the L 40/11 BO when sample mass or throughput exceeds those limits.

What supply and adjacent equipment does the L 9/11 BO require?

It needs a 7 kW three-phase supply matched to the nameplate voltage and frequency, which the verified facts do not state. No controller, cable or exhaust duct accessories are listed as included; confirm controller compatibility and any extraction connection against the unit's own manual.

What duty-cycle and environmental limits apply to the L 9/11 BO?

Operation is capped at 1100 °C with a maximum organic load of 75 g and evaporation rate of 1.0 g/min. The verified facts and attached digests give no ambient temperature, clearance or duty-cycle figures; these must be taken from the unit's manual before siting.

What maintenance and consumables should be budgeted for beyond the base furnace?

The integrated exhaust gas cleaning stage is the main service item, and its condition tracks the organic load history. No service interval, spare parts list or included accessories are given in the verified facts; the unit's manual should be consulted for the cleaning-stage inspection schedule and any consumables.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
Prozesssteuerung englisch
Brochure ·2,8 МБ ·20 pp.
View PDF
PDF
Fiber optics glass english 0
Brochure ·10,3 МБ ·97 pp.
View PDF
PDF
Foundry english
Brochure ·4,2 МБ ·52 pp.
View PDF
PDF
Dental english
Brochure ·13,1 МБ ·72 pp.
View PDF