Nabertherm RSRB 120/750/11
Nabertherm RSRB 120/750/11 — Tube furnaces.
The RSRB 120/750/11 is a rotary tube furnace for batch operation up to 1100 °C, with a 750 mm heated length and a 120 kg weight. Its 3-phase electrical connection and 10.6 kW connected load distinguish it from smaller siblings such as the RSRB 80/500/11. It is intended for thermal processing of granular or powdery materials under controlled atmosphere in laboratory and pilot-scale settings.
Nabertherm RSRB Series — Model Comparison & Selection
| Model | Weight, kg | Electrical connection | Max temperature, °C |
|---|---|---|---|
| RSRB 120/750/11 Current | 120 | 3-phase | 1100 |
| RSRB 80/500/11 | 100 | 3-phase | 1100 |
Full specifications
| Electrical connection | 3-phase |
| Max. outer mfr | 106 |
| Heated mfr | 750 |
| Connected mfr | 10.6 |
| Weight | 120 kg |
| Length constant mfr | 250 |
| Length constant mfr | 375 |
| Tube length mfr | 1390 |
| Ø Terminal mfr | 28 |
| Max temperature | 1100 °C |
Description
Construction and series positioning
- The RSRB 120/750/11 is a rotary tube furnace from Nabertherm's RSRB series, designed for batch operation up to 1100 °C.
- It features a 750 mm heated length and a maximum outer tube diameter of 106 mm, with a terminal diameter of 28 mm.
- The tube length is 1390 mm, and the constant temperature zone extends over 250 mm and 375 mm lengths (two zones).
- Compared to the sibling model RSRB 80/500/11, this model offers a larger heated length (750 mm vs. 500 mm) and higher weight (120 kg vs. unspecified).
- The furnace is equipped with a 3-phase electrical connection and a connected load of 10.6 kW.
Behavior under load and media
- The maximum operating temperature is 1100 °C, suitable for processes such as calcination, sintering, and pyrolysis.
- The rotary tube design ensures uniform mixing and heat treatment of granular or powdery samples.
- No curve points or additional process media specifications are provided; the furnace is intended for use with appropriate gas atmospheres as per the tube material and seals.
Installation, connection, and control
- The furnace requires a 3-phase power supply; the exact voltage and frequency are not specified in the provided facts.
- Control and automation details are not included in the supplied documents; refer to the separate process controller documentation for the 500 series and MyNabertherm app.
- The tube connections (terminal diameter 28 mm) allow for gas inlet and outlet fittings.
- The furnace weight is 120 kg, necessitating a sturdy mounting surface and proper handling during installation.
Integration & Operating Notes
The furnace draws 10.6 kW from a 3-phase supply. Ensure the electrical installation can handle this load and that appropriate circuit protection and cabling are sized accordingly. Voltage and frequency are not specified in the provided facts; consult the nameplate or manual.
The furnace is rated for a maximum temperature of 1100 °C. Operating above this limit can damage the heating elements and insulation. Use an independent over-temperature protection device if the process requires it.
The rotary tube and seals are wear components. Inspect periodically for cracks, wear, or leaks, especially when processing corrosive or reactive materials. Replace as needed to maintain atmosphere integrity.
Selection & Integration Q&A
Choose the RSRB 120/750/11 for larger batch sizes up to 120 kg and longer heated zones (750 mm vs. 500 mm). The RSRB 80/500/11 is better suited for smaller batches and lower throughput where space or power is limited.
The tube terminal diameter is 28 mm. Use fittings compatible with this size and ensure they are rated for the process gas and temperature. The furnace does not include gas supply components; these must be sourced separately.
The base delivery does not include spare tubes, seals, or gas fittings. These are consumables and should be ordered separately based on expected wear. Regular inspection and replacement are recommended to avoid process downtime.