Safety precautions, UV radiation and hazard information
Overviewp. 11
Overview of the spectrophotometer system
Specp. 12
Technical specifications of the instruments
Procedurepp. 13-15
Installation and setup procedures
Procedurep. 16
Power-on and initialization procedure
Procedurep. 17
Instrument performance test procedures
Configpp. 18-23
Cell holder types and solid sample holder setup
Procedurepp. 24-25
Installing the sample compartment base plate
Procedurepp. 26-27
Nitrogen purge setup and cautions
Procedurepp. 28-30
Removing and reinstalling the sample compartment base
Procedurep. 31
Routine maintenance procedures
Procedurep. 32
Source lamp replacement information
Orderingp. 33
Spare parts list and ordering information
p. 5table, 6 rows
p. 13table, 11 rows
p. 31table, 4 rows
Safety Practices and Hazards
Раздел
Страница
Verifying Safe State
5
Ultraviolet radiation
6
Electrical hazards
6
Other precautions
7
Information symbols
8
Color coding
9
Table
Раздел
Страница
Starting the software
13
Software Status Bulletin
14
GPIB communications
14
Setting up the instrument
15
Turning on the system
16
Instrument performance tests
17
Sample holders
17
Installing the base plate
25
Installing other accessories
25
Nitrogen purging
26
Removing the sample compartment base
28
Table
Раздел
Страница
Cleaning
31
Source lamps
32
Fuses
32
Spare Parts
33
Оглавление главы 4 Maintenance; номера страниц приведены как напечатано
Engineering Facts
14 facts · every claim linked to a page
Installation
The Cary 300 requires loosening the wavelength drive transit screw before power-on or the instrument will be damaged.
Prevents mechanical damage to the wavelength drive during first installation or after relocation.
Source
“If you have a Cary 300 instrument, you MUST loosen the transit screw in the wavelength drive before turning on the instrument.”
Installation
A minimum clearance of 50 mm on the sides and 150 mm at the rear is required for free air circulation.
Defines lab bench layout and prevents overheating from blocked ventilation.
Source
“Allow at least 50 mm (2 in.) of space on the sides, and 150 mm (6 in.) at the rear of the system to permit free air circulation.”
Installation
Cary 100/300 voltage selector switches on the rear panel must be set to the local mains voltage before connecting power.
Wrong voltage setting creates fire and shock hazards and can destroy the system.
Source
“ensure both the instrument and the power supply are turned OFF, and that the voltage selector switches on the instrument rear panel (Cary 100/300 only) are set to the correct mains power supply voltage”
Performance
A two-hour warm-up is required before use for optimum performance.
Affects measurement scheduling and data quality expectations after power-on.
Source
“For optimum performance, allow your Cary instrument to warm up for 2 hours before use.”
Installation
Nitrogen purging requires supply pressure between 83 and 172 kPa (12 to 25 psig) with a proper regulator and gauge.
Determines regulator selection and safe purging setup for UV/NIR work.
Source
“Operating pressure is from 83 to 172 kPa (12 to 25 psig).”
Installation
Purging flow rates should be set to 0–20 L/min for the instrument and 0–10 L/min for the sample compartment.
Guides flowmeter setup and gas consumption planning for purged measurements.
Source
“Instrument: 0–20 L/min”
Installation
Only clean flexible PVC or equivalent tubing of 6 mm (1/4 inch) internal diameter should be used; rubber tubing is prohibited.
Rubber tubing can release talc into the optical system and contaminate optics.
Source
“Use clean, flexible plastic (polyvinyl chloride (PVC) or equivalent) tubing of 6 millimeter (1/4 inch) internal diameter.”
Safety
Compressed nitrogen from suppliers using oil or water compression must never be used because it deposits oil on optical surfaces.
Prevents optical contamination and avoids voiding the instrument warranty.
Source
“Never use compressed nitrogen from a supplier who uses oil or water in the compression process.”
Safety
The high-voltage connector in the sample compartment must only be used with Agilent Internal and External DRA accessories.
Prevents electrical shock and damage when installing third-party accessories.
Source
“This connector should only be used with the Agilent Internal and External DRA's.”
Installation
Removing the sample compartment floor of Cary 4000/5000/6000i/7000 loses optical alignment and requires realignment before microcell analyses.
Signals a mandatory realignment step after installing large apparatus.
Source
“Once the floor of the sample compartment has been removed, the optical alignment with respect to the floor has been lost.”
Maintenance
Only two fuses at the rear are operator-accessible; all other internal fuses must be replaced by Agilent authorized personnel.
Defines the boundary of user-serviceable electrical maintenance.
Source
“There are two operator accessible fuses located at the rear of the instrument.”
Maintenance
Lamps must be handled only by the base with a soft cloth; touching the glass envelope reduces efficiency.
Prevents premature lamp degradation during replacement.
Source
“NEVER touch the glass surfaces of new lamps. ALWAYS handle a lamp by its base, using a soft cloth.”
Safety
Before changing a lamp, the instrument must be switched off, the power cable removed, and the lamp allowed to cool.
Mitigates burn and high-voltage shock hazards during lamp service.
Source
“Before changing the deuterium or visible lamps, ALWAYS switch off the instrument, remove the power supply cable and allow the lamps to cool.”
Operation
The sample compartment must be empty and its lid closed before turning on the instrument.
Avoids stray light and detector exposure during startup and self-tests.