The unit is rated for an operating temperature range of -30 to 50 °C, so the process must stay within these limits.
Defines the allowable process temperature window for selection.
Source
“Operating temperature range -30...50 °C”
| Parameter | Value |
|---|---|
| Operating temperature range | -30...50 °C |
| Safety classification | I / NFL |
| Cooling power at 15°C | 0,4 kW |
| Cooling power at 0°C | 0,35 kW |
| Cooling power at -20°C | 0,1 kW |
| Refrigeration machine | air-cooled, natural |
| refrigerant | |
| Refrigerant (ASHRAE, GHS) | R-290 (A3, H220) |
| Global Warming Potential (GWP) | 0,02 |
| Refrigerant quantity | 0,06 kg |
| fluid connection | M16x1 male |
| Overall dimensions WxDxH ** | 250x310x415 mm |
| Net weight | 23 kg |
| Power supply requirement | 220-240V 1~/2~ 50/60Hz |
| max. current | 2,7 A |
| min. Fuse | 10A |
| max. Fuse | 16A |
| Degree of Protection | IP20 |
| min. ambient temperature | 5 °C |
| max. ambient temperature | 40 °C |
| from Serial-No. | 412521 |
** Please respect space requirements. See operating conditions at www.huber-online.com
The unit is rated for an operating temperature range of -30 to 50 °C, so the process must stay within these limits.
Defines the allowable process temperature window for selection.
“Operating temperature range -30...50 °C”
Cooling capacity drops with lower evaporating temperature, from 0.4 kW at 15 °C to 0.1 kW at -20 °C, so sizing must use the capacity at the actual working temperature.
Prevents undersizing when the application runs at low temperatures.
“Cooling power at 15°C 0,4 kW at 0°C 0,35 kW at -20°C 0,1 kW”
The refrigerant is R-290 (A3, H220), a flammable natural refrigerant, so installation must respect flammable-refrigerant requirements.
Affects site safety classification, ventilation and ignition-source control.
“Refrigerant (ASHRAE, GHS) R-290 (A3, H220)”
The fluid connection is M16x1 male, so mating hoses and fittings must match this thread.
Ensures correct hose and adapter selection during installation.
“fluid connection M16x1 male”
The unit requires 220-240 V single/two-phase 50/60 Hz supply with a 10-16 A fuse, so the electrical supply and protection must be sized accordingly.
Determines electrical connection and upstream protection rating.
“Power supply requirement 220-240V 1~/2~ 50/60Hz max. current 2,7 A min. Fuse 10A max. Fuse 16A”
The enclosure is IP20, so it must be installed in a dry indoor location protected from water and dust ingress.
Restricts installation environment and enclosure requirements.
“Degree of Protection IP20”
Ambient temperature must stay between 5 and 40 °C, so the installation room must be conditioned within this range.
Out-of-range ambient affects cooling performance and reliability.
“min. ambient temperature 5 °C max. ambient temperature 40 °C”
Cooling capacity is valid at 20 °C room temperature and may drop as ambient rises, so capacity margins should account for higher ambient.
Prevents optimistic sizing based on nominal capacity at 20 °C.
“Output data valid for: Room temperature 20°C. If the ambient temperature rises, the cooling capacity may drop.”
Voltage tolerance is ±5% only with simultaneous frequency tolerance of ±2%, and certain combinations are not allowed, so supply quality must be verified.
Ensures the site power quality meets the allowed tolerance envelope.
“Voltage + / - 5% with a simultaneous frequency tolerance of + / - 2% Example -5% voltage and +2% frequency -> not allowed! -5% voltage and - 2% frequency -> allowed”
The equipment is EMC Class A, Group 1, so it may cause radio interference and is intended for non-residential environments.
Affects installation location and EMC planning in sensitive environments.
“Classification (disturbance) to EN55011: Class A, Group 1”
Single/two-phase devices are delivered with a power cable and country-specific plug that must be specified at ordering.
Prevents delivery of the wrong plug type and rework at commissioning.
“Single / two-phase devices (100V to 240V) --> with power cable and country-specific plug (please specify when ordering)”
Space requirements around the unit must be respected, so clearance must be planned per the operating conditions.
Insufficient clearance impairs air-cooled condenser performance and service access.
“** Please respect space requirements. See operating conditions at www.huber-online.com”