Selection
The unit is rated for an operating temperature range of -50 to 50 °C, so it must be selected only for processes within this window.
Defines the process temperature envelope for which the cooler can be specified.
Source
“Operating temperature range
-50...50 °C”
Safety
The refrigerant is R-290 (A3, H220), a flammable natural refrigerant, so installation must account for A3 safety requirements.
A3 classification affects room ventilation, ignition-source control and local safety compliance.
Source
“Refrigerant (ASHRAE, GHS)
R-290 (A3, H220)”
Installation
The refrigerant charge is only 0.06 kg, which keeps the CO2 equivalent at 0.0 t and simplifies leak/CO2 reporting.
Small charge reduces regulatory burden and leak-management requirements.
Source
“Refrigerant quantity
0,06 kg
CO2 equivalent
0,0 t”
Installation
The probe has a 48 mm nominal diameter and 155 mm length, so the vessel opening and immersion depth must be checked before mounting.
Mechanical fit and immersion depth determine whether the probe can be installed in the application.
Source
“Nominal diameter probe
48 mm
Length of probe
155 mm”
Installation
The flexible connection is 1150 mm long, which constrains the maximum distance between the refrigerating unit and the probe.
Layout and routing must keep the unit within reach of the probe without stretching the line.
Source
“Length flexible connection
1150 mm”
Installation
The unit requires 208-240 V single/two-phase 50/60 Hz supply with max current 3 A and a fuse between 10 A and 16 A.
Electrical supply and protection must be sized to these limits before commissioning.
Source
“Power supply requirement
208-240V 1~/2~ 50/60Hz
max. current
3 A
min. Fuse
10A
max. Fuse
16A”
Operation
The ambient temperature must stay between 5 °C and 40 °C, so the installation location must be controlled within this range.
Operation outside this range may degrade cooling performance or damage the unit.
Source
“min. ambient temperature
5 °C
max. ambient temperature
40 °C”
Performance
Cooling capacity is 0.3 kW at 0 °C, 0.26 kW at -20 °C and 0.2 kW at -30 °C, so capacity must be checked at the actual process temperature.
Selection must use the capacity at the required temperature, not a single nominal value.
Source
“at 0°C
0,3 kW
at -20°C
0,26 kW
at -30°C
0,2 kW”
Performance
Output data are valid at 20 °C room temperature and cooling capacity may drop as ambient temperature rises.
Hot rooms can reduce available cooling and require derating or better ventilation.
Source
“Output data valid for: Room temperature 20°C. If the ambient temperature rises, the cooling capacity may drop.”
Installation
Voltage tolerance is ±5% only with simultaneous frequency tolerance of ±2%, and the combination -5% voltage with +2% frequency is not allowed.
Supply quality must be verified to avoid invalid voltage/frequency combinations.
Source
“Voltage + / - 5% with a simultaneous frequency tolerance of + / - 2%
Example
-5% voltage and +2% frequency -> not allowed!”
Compliance
The equipment is EMC Class A Group 1 to EN55011, so it is intended for industrial environments and may cause interference in residential areas.
Class A equipment may require additional EMC measures if installed near sensitive or residential loads.
Source
“Classification (disturbance) to EN55011: Class A, Group 1”
Installation
Single/two-phase devices are delivered with a power cable and country-specific plug that must be specified at ordering.
The correct plug type must be ordered to avoid delays and rework at installation.
Source
“Single / two-phase devices (100V to 240V) --> with power cable and country-specific plug (please specify when ordering)”
Compliance
The US-SNAP end-use for this equipment is industrial process refrigeration, which defines its permitted application in the US.
Using it outside the stated end-use may violate refrigerant regulations.
Source
“The US-SNAP end-use for this equipment is the industrial process
refrigeration.”
Installation
Space requirements must be respected according to the operating conditions referenced by the manufacturer.
Insufficient clearances can impair air-cooled condenser performance and service access.
Source
“** Please respect space requirements. See operating conditions at www.huber-online.com”