Rev h protector pass through laboratory fume hoods

Technical Reference Summary

Covered Models & Document Scope

Labconco Protector® Pass-Through Laboratory Fume Hood, 4', 5' and 6' models, standard and A-Style Combination Sash variants, 115 V 50/60 Hz 20 A or 230 V 50/60 Hz 10 A electrical configurations, with optional side view window, sash stops, Guardian airflow monitors, ceiling enclosures, additional service fixtures and duplex outlets. Part #9411200, Rev. H.

Section-by-Section Technical Breakdown

pp. 9-12
Prerequisites: Location, Support, Exhaust, Electrical and Service Line Requirements

Defines site preparation: locate the hood away from traffic, doors, windows, fans and ventilation registers; installations must be permanent and stationary on a base cabinet and chemically resistant work surface. Exhaust connection is 12" nominal (12.75" OD) duct sized for 60–100 fpm face velocity and 1000–2500 fpm transport velocity. Electrical service is 115 V 50/60 Hz 20 A or 230 V 50/60 Hz 10 A with internal wiring terminated at a single-point junction box. Service lines are ¼" OD copper (brass for natural gas) with 40 PSI recommended and 200 PSI maximum pressure.

  • Do not install on a cart, dolly or mobile bench; all installations must be permanent and stationary.
  • Exhaust duct: 12" nominal (12.75" OD), transport velocity 1000–2500 fpm.
  • Face velocity range 60–100 fpm; Labconco recommends 100 fpm average for Pass-Through hoods.
  • Electrical: 115 V 50/60 Hz 20 A or 230 V 50/60 Hz 10 A; dedicated branch circuits recommended.
  • Service lines: ¼" OD copper (brass for natural gas), 40 PSI recommended, 200 PSI maximum.
pp. 11
Airflows and Static Pressure

Table 2-1 gives airflow volumetric rate and static pressure for 4', 5' and 6' hoods at two sash positions: one sash full open at 25" and one sash 62.5% open at 18". Values are used to select the remote blower based on total system static pressure loss.

  • 4' hood: 775 CFM @ 0.33 in H2O at 100 fpm (25" open); 590 CFM @ 0.19 in H2O at 100 fpm (18" open).
  • 5' hood: 1020 CFM @ 0.42 in H2O at 100 fpm (25" open); 775 CFM @ 0.24 in H2O at 100 fpm (18" open).
  • 6' hood: 1250 CFM @ 0.59 in H2O at 100 fpm (25" open); 950 CFM @ 0.34 in H2O at 100 fpm (18" open).
  • At 130 fpm, 4' hood is NA; 5' and 6' values are given in the table.
pp. 13-15
Installation: Unpacking, Shipping Skid Removal and Sash Weight Release

Hoods weigh 400–800 lbs (182–363 kg) and must remain on the shipping skid until close to the final location. Move with a floor jack or furniture dolly under the skid; do not tilt onto a hand truck. Sash weights are shipped disconnected and secured with a bolt; remove the two bolts, verify cables are on pulleys, then attach weights. Sash weights are individually matched to the specific hood and must not be exchanged between units.

  • Hood weight range: 400–800 lbs (182–363 kg).
  • Do not lift by the front air foil.
  • Remove side panels (two Phillips screws atop each) to access skid hardware.
  • Sash weights are individually matched and must not be exchanged on any other unit.
pp. 16
Installing the Hood on a Supporting Structure and Work Surface

The supporting structure must safely support the combined weight of the hood and related equipment. The work surface must be at least as wide as the hood, smooth, nonporous, chemically resistant (e.g., epoxy resin) and include a dished recessed area for primary spills. Position the front edge of the fume hood 1.7" past the front edge of the work surface; lower base cabinets are flush with the front edge of the work surface.

  • Position front edge of fume hood 1.7" past front edge of work surface.
  • Work surface must be at least as wide as the hood.
  • Labconco recommends supports by others underneath the work surface at installation.
pp. 17-18
Connecting to the Hood Exhaust System and Electrical Supply

Exhaust ductwork weight must be supported independently of the hood superstructure. The exhaust connection is 12" nominal (12.75" OD) and should be installed by a qualified HVAC contractor. Electrical supply must include overload protection with a marked disconnecting switch or circuit breaker in close proximity and within easy reach. The hood is grounded to MAINS protective earthing; wire colors are black/white for 115 V and brown/blue for 230 V.

  • Exhaust duct weight must not be supported by the hood structure.
  • Building supply must include overload protection and a marked disconnecting device.
  • Ground only MAINS ground conductors to the protective earthing lug using a ring terminal for a 10-24 machine screw.
  • 115 V: Phase (Hot) black, Neutral white; 230 V: Phase1 brown, Phase2 blue.
  • Maximum combined load if circuits are wired together is the sum of individual outlets plus the unit rating (i.e., 2 Amps).
pp. 20-21
Connecting the Service Lines

Hoods with service fixtures are plumbed from valve to hose connector or gooseneck. Supply tubing is provided by the qualified installer and can enter from above, through the back, or through the work surface. Fixtures are designed for air, hot water, vacuum, cold water and natural gas; natural gas must only be used in the fixture pre-plumbed with brass tubing. Oxygen must not be used with any standard service fixture.

  • Inspect all fittings for leakage and tighten slightly if needed.
  • Do not use oxygen with any standard service fixture.
  • Natural gas only in the service fixture pre-plumbed with brass tubing due to sulfur content.
  • Service access plate on front corner posts allows access to valve bodies.
pp. 21
Sealing the Hood to the Work Surface and Certifying

After the hood is set, ducted, wired and plumbed, seal it to the work surface with silicone sealant to prevent spilled materials from collecting under the hood walls. Certification requires airflow velocity readings across the sash opening per the Industrial Ventilation Manual. Labconco recommends an average face velocity of 100 fpm for Pass-Through hoods; factory ASHRAE 110-1995 rating is AM<0.05 ppm at 4 lpm.

  • Seal hood structure to work surface with silicone sealant.
  • Recommended average face velocity at sash opening: 100 fpm.
  • Factory ASHRAE 110-1995 as-manufactured rating: less than 0.05 ppm at 4 lpm.
  • Face velocity profiles and smoke testing should be done periodically.
pp. 22-23
Performance Features

The hood is a fully featured by-pass hood with baffle and air foil, designed for OSHA-approved velocities at 100 fpm. Features include a vertical-rising sash with 37.5" maximum visibility and 25" travel, 28" maximum operating height, 48" interior height, factory-wired T8 fluorescent lighting behind laminated safety glass, ADA-compliant low-mounted switches, Clean-Sweep air foil openings, up to 8 service fixtures (4 with side view window), duplex receptacles on corner posts, and factory preparation for the Guardian airflow monitor.

  • Vertical-rising sash: 37.5" visibility, 25" travel, 28" maximum operating height.
  • Interior height 48".
  • Factory prepared for up to 8 service fixtures (4 if Side View Window option selected).
  • Right corner post factory prepared for Guardian Digital Airflow Monitor or Guardian Airflow Monitor.
  • Sash alarm sounds if both sashes are raised.
  • Optional 50,000-hour LED direct replacement T8 bulbs available.
pp. 29-31
Using Your Protector Pass-Through

The counterbalanced sash requires only a few pounds of force and can be raised to a maximum 28" operating height. Airflow requirements should be sized for 28"; with sash stops at 18", airflow requirements can be reduced by approximately 40%. The remote blower is activated by the blower switch; performance can be validated by watching smoke drawn into the hood face. Working procedures include planning, start-up, loading, work techniques, final purging, unloading and shutdown.

  • Maximum sash operating height: 28".
  • With sash stops at 18", airflow requirements can be reduced by approximately 40%.
  • Allow hood to operate unobstructed for two minutes before work and two minutes for final purging.
  • Keep materials at least 6 inches inside the sash and at least 2 inches from side walls.
  • Do not obstruct the front air foil or rear baffle slots.
pp. 32
Maintaining Your Protector Pass-Through

Routine maintenance includes service safety precautions: disconnect power at the main disconnect for electrical maintenance, consult safety officer for decontamination PPE and procedure, use proper safety for step ladders, and shut off supply for service line maintenance. A routine maintenance schedule and routine service operations are provided.

  • Always disconnect power at the main disconnect before electrical maintenance.
  • Consult safety officer for decontamination PPE and procedure.
  • Shut off supply before maintenance on service lines.
pp. 31-34
Modifying Your Protector Pass-Through

Covers field installation of work surfaces, ceiling enclosures above the fume hood, additional service fixtures, Guardian airflow monitors, sash stop kits, and an electrical duplex outlet.

  • Installing work surfaces.
  • Installing ceiling enclosures above the fume hood.
  • Installing additional service fixtures.
  • Installing Guardian airflow monitors.
  • Sash stop kit field installation.
  • Installing an electrical duplex outlet.
pp. 39-41
Troubleshooting

A troubleshooting table lists problems, probable causes and corrective actions for blower/lights failures, contamination outside the hood, sash operation issues, duplex outlet power loss, service valve failures and audible alarm sounding.

  • Remote blower and lights won't operate: check switch connections, control box connections, reset building circuit breakers.
  • Remote blower won't operate but lights work: inspect blower wiring and switch, replace belt, replace blower motor.
  • Fume hood blower operates but lights will not operate: inspect lamp installation and wiring, replace lamp, reset lamp circuit breaker, replace lamp ballast.
  • Contaminants outside fume hood: review user techniques, remove baffles to clear air slots and exhaust outlet, check external factors, re-certify and check face velocity (60–100 fpm).
  • Vertical sash no longer operates smoothly: inspect/replace cable, replace pulley/bearing or add grease, re-install cable, replace pulley(s), straighten distorted sash frame.
  • Electrical duplex outlets no longer have power: check wire connection or replace duplex, reset circuit breakers.
  • Service valves no longer operate: inspect building supply shut-off valves and pressures below recommended 40 PSI, replace valve and check for leaks, fix leaking plumbing connections.
  • Audible Alarm Sounding: both sashes too high — close one sash completely.

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
Exhaust duct connection is 12" nominal (12.75" OD) designed for minimum static pressure loss at 60–100 fpm face velocities and 1000–2500 fpm transport velocities. p.10 ↗ Ductwork and blower must be sized to these diameters and velocities; duct weight must be supported independently of the hood. Whole series
Airflow for 4' hood: 775 CFM @ 0.33 in H2O at 100 fpm with one sash full open at 25"; 590 CFM @ 0.19 in H2O at 100 fpm with one sash 62.5% open at 18". p.11 ↗ Blower selection for 4' models must provide these airflow/static pressure combinations. 4' Hood
Airflow for 5' hood: 1020 CFM @ 0.42 in H2O at 100 fpm (25" open); 775 CFM @ 0.24 in H2O at 100 fpm (18" open). p.11 ↗ Blower selection for 5' models must provide these airflow/static pressure combinations. 5' Hood
Airflow for 6' hood: 1250 CFM @ 0.59 in H2O at 100 fpm (25" open); 950 CFM @ 0.34 in H2O at 100 fpm (18" open). p.11 ↗ Blower selection for 6' models must provide these airflow/static pressure combinations. 6' Hood
Electrical service is normally 115 V, 50/60 Hz, 20 A or 230 V, 50/60 Hz, 10 A; each circuit should be a dedicated branch circuit; if wired together maximum load is sum of individual outlets plus unit rating (i.e., 2 Amps). p.18 ↗ Verify voltage on I.D. plate behind front panel; provide dedicated circuits and overload protection with marked disconnect. Whole series
Service lines should be ¼ inch outside diameter, copper (brass for natural gas), with easily accessible shut-off valve; recommended operating pressure 40 PSI, maximum allowable 200 PSI. p.12 ↗ Install pressure regulator if line pressure exceeds 40 PSI; use brass tubing for natural gas. Whole series
Hood models weigh between 400 and 800 lbs (182–363 kg). p.13 ↗ Supporting structure and work surface must safely support combined hood and equipment weight; use mechanical lift or floor jack. Whole series
Position front edge of fume hood 1.7" past front edge of work surface; work surface should be at least as wide as the hood. p.16 ↗ Ensures proper support and containment; lower base cabinets flush with front edge of work surface. Whole series
Vertical-rising sash may be raised to a maximum 28" operating height; with sash stops at 18", airflow requirements can be reduced by approximately 40%. p.29 ↗ Size airflow for 28" unless sash stops are used; sash stops reduce energy usage. Whole series
Labconco recommends an average face velocity at the sash opening of 100 feet per minute for Pass-Through Hoods; hood should have average face velocity of 60–100 fpm. p.21 ↗ Certification and periodic re-certification must verify face velocity within this range. Whole series
Factory ASHRAE 110-1995 as-manufactured rating: less than 0.05 ppm at 4 liters per minute (AM<0.05). p.21 ↗ Baseline containment performance; field ASHRAE testing requires certified on-site contractor. Whole series
Hoods are factory prepared for up to 8 service fixtures (4 service fixtures if Side View Window option is selected). p.23 ↗ Plan service fixture count and side view window option accordingly. Whole series
Sash weights are individually matched for this specific hood and should not be exchanged on any other unit. p.15 ↗ Do not swap sash weights between hoods; replace with matched weights only. Whole series
Grounding: connect MAINS ground conductor to grounding lug marked with protective earthing symbol using ring terminal sized for 10-24 machine screw; only MAINS ground conductors to this lug. p.18 ↗ Proper protective earthing is required for safe operation. Whole series
Wire color codes: 115 V Phase (Hot) black, Neutral white; 230 V Phase1 brown, Phase2 blue. p.18 ↗ Verify supply wiring matches these codes before connection. Whole series
Keep all materials at least 6 inches inside of the sash and at least two inches from the side walls; perform contaminated operations as far to the rear as possible. p.30 ↗ Improves containment and reduces contamination escape. Whole series
Allow hood to operate unobstructed for two minutes before work and two minutes for final purging before closing sash. p.30 ↗ Ensures airborne contaminants are purged from work area. Whole series
Perchloric acid use in this hood is prohibited; high level radioisotope materials are prohibited. p.27 ↗ Do not use these materials in this hood. Whole series
Hood should be certified by a qualified certification technician before initial use and re-certified whenever relocated, serviced, or at least annually thereafter. p.27 ↗ Establish certification and annual re-certification schedule. Whole series

Faults & Troubleshooting

Code / Symptom Possible Cause Remedy Note
Remote blower and lights won’t operate p.39 ↗ Wires not connected at junction boxes or switches. Check connection of switches. Check connection to control box on top of unit. Chapter 8
Remote blower and lights won’t operate p.39 ↗ Circuit breakers tripped in building electrical supply. Reset circuit breakers. Chapter 8
Remote blower won’t operate, but lights work p.39 ↗ Blower wiring is disconnected. Inspect blower wiring and switch. Chapter 8
Remote blower won’t operate, but lights work p.39 ↗ Belt broken Replace belt. Chapter 8
Remote blower won’t operate, but lights work p.39 ↗ Blower motor is defective. Replace blower motor. Chapter 8
Fume hood blower operates but lights will not operate p.39 ↗ Lamp not installed correctly. Inspect lamp installation. Chapter 8
Fume hood blower operates but lights will not operate p.39 ↗ Lamp is defective. Replace lamp. Chapter 8
Fume hood blower operates but lights will not operate p.39 ↗ Lamp circuit breaker in building is tripped. Reset the lamp circuit breaker. Chapter 8
Fume hood blower operates but lights will not operate p.40 ↗ Lamp wiring is disconnected. Inspect lamp wiring. Chapter 8
Fume hood blower operates but lights will not operate p.40 ↗ Defective lamp ballast. Replace lamp ballast. Chapter 8
Contaminants outside of fume hood p.40 ↗ Improper user techniques for the fume hood. See “Certifying the Hood” Chapter 3 and “Safety Precautions” Chapter 4 sections in the manual. (Ref. Appendix E) Chapter 8
Contaminants outside of fume hood p.40 ↗ Restriction of the baffle air slots or – blockage of the exhaust outlet. Remove baffles to ensure that all air slots, and the exhaust outlet are unobstructed. Chapter 8
Contaminants outside of fume hood p.40 ↗ External factors are disrupting the fume hood airflow patterns or acting as a source of contamination. See “Location Requirements” Chapter 2, “Certifying the Hood” Chapter 3, and “Safety Precautions” Chapter 4 sections of this manual. (Ref. Appendix E) Chapter 8
Fume hood has improper face velocity p.40 ↗ Fume hood has improper face velocity. Have fume hood re-certified and check remote blower exhaust system. Hood should have average face velocity of 60-100 fpm. Chapter 8
Vertical sash no longer operates smoothly p.40 ↗ Cable is frayed or plastic protection is damaged. Inspect cable and replace cable if worn or damaged immediately; otherwise injury could result. Chapter 8
Vertical sash no longer operates smoothly p.40 ↗ Pulley bearing is damaged. Replace pulley, bearing or add grease. Chapter 8
Vertical sash no longer operates smoothly p.40 ↗ Cable has slipped off the pulleys. Re-install, cable must be replaced immediately if damaged. Chapter 8
Vertical sash no longer operates smoothly p.40 ↗ Weight has broken pulleys. Replace pulley(s). Chapter 8
Vertical sash no longer operates smoothly p.40 ↗ Vertical sash frame is distorted. Place horizontal glass symmetrically and pull sash down to air foil. Straighten damaged frame. Chapter 8
Vertical sash no longer operates smoothly p.41 ↗ Cable is frayed or has slipped off the pulleys. Re-install, cable must be replaced immediately if damaged. Chapter 8
Electrical duplex outlets no longer have power p.41 ↗ Wires not connected or faulty duplex. Check wire connection or replace duplex. Chapter 8
Electrical duplex outlets no longer have power p.41 ↗ Circuit breakers tripped in building electrical supply. Reset circuit breakers. Chapter 8
Service valves no longer operate p.41 ↗ Faulty building supply. Inspect building supply shut off valves and appropriate pressures below the recommended 40 PSI. Chapter 8
Service valves no longer operate p.41 ↗ Valve no longer operates. Replace valve and check for leaks. Chapter 8
Service valves no longer operate p.41 ↗ Supply line or outlet line has leaks. Inspect line for leaks and fix any leaking plumbing connections. Chapter 8
Audible Alarm Sounding p.41 ↗ Both sashes are too high. Close one sash completely. Chapter 8