A 1204 H — instruction manual a 124 h

Technical Reference Summary

Covered Models & Document Scope

Pfeiffer Vacuum A124H MD multi-stage dry Roots pump dedicated to Implant source application in semiconductor industry. Covers product part number ACP120GSP111x2 (example order code ACP120GSP11122, 200-230 V / 50-60 Hz variant). Based on A4 Series dry pump technology. Document is the EN operating instructions (translation of original French), delivered with declaration of conformity.

Section-by-Section Technical Breakdown

pp. 7-10
Safety, flammable/pyrophoric materials, protective equipment, proper use

Safety precautions for installation and operation, including absence of an integrated EMO device, LO/TO requirements per OSHA 29 CFR 1910.147, and hazard management for pyrophoric/flammable gases with dilution to 25% LEL. Defines proper use (gas vacuum pumping only, industrial environment) and improper use (explosive media, liquids, dusts, pressure generation, potentially explosive areas).

  • Pump has no integrated EMO/lock-out; host tool must de-energize pump when EMO activated
  • LO/TO required per OSHA 29 CFR 1910.147; lock out electrical, nitrogen and water circuits
  • Dilute pyrophoric/flammable gases to 0.25x LEL (NFPA 69-2002 chap. 6.3.1); otherwise oxidant < 0.6x MOC
  • Safety devices per EN 50495; interlock 'gas purge fault' and 'pump fault' with tool
  • Improper use: pumping explosive media, liquids, dusts, generating pressure, use in Ex areas
pp. 15-23
Installation: set-up, oil, water, nitrogen, electrical, pumping line, leak test

Covers horizontal set-up with vertical pumping axis and inlet up, oil filling to mid-sight-glass, water and nitrogen circuit connection with 3 m manual isolation valves, electrical connection with customer-supplied protection, rotation direction check, pumping line connection and leak test. Pump has no integrated command system or electric protection; owner supplies circuit breaker, emergency stop and thermal safety wiring.

  • Oil level must be in the middle of the sight glass; use only Pfeiffer Vacuum approved oil delivered in separate containers
  • Water: female = inlet, male = outlet; use treated water per 12.2.2; filter if particle/pollution specs not met; flowmeter-controlled flow
  • Manual valve on water and nitrogen circuits within 3 m of product
  • Nitrogen: 6.35 mm OD (1/4 in) customer tubing; regulator R1 closed (counterclockwise) before pressurizing; manometer on injection device
  • Nitrogen flow vs BF pressure: 0.7·10³ hPa→20 slm, 1.4·10³→30, 2·10³→40, 2.6·10³→50, 3.2·10³→60 slm
  • Main circuit breaker: curve D (IEC 60947-2), ≥ 10 kA short-circuit cutoff, within 7 m and line of sight of pump
  • Second protective earth conductor required, cross-section ≥ conductor size; earth wire longer than the 3 phase conductors
  • Rotation check: brief start; inlet pressure < 5·10⁻¹ hPa = correct; if pressure rises, swap two phases
  • Pumping line as short as possible, internal diameter ≥ inlet flange; flexible bellows to reduce vibration; LEL detection at 25% in exhaust extraction
  • Connected chambers must withstand negative pressure of 1·10³ hPa relative to atmosphere
pp. 24
Operation: prerequisites, start-up, shut-down

Before each start-up: verify inlet connection, oil levels mid-sight-glass, water and N2 supplies on, emergency shutdown cabling, unclogged exhaust with valves open. Start/stop is via the electrical cabinet circuit breaker; prolonged stop requires the decommissioning procedure.

  • Rotation direction check mandatory before initial start-up
  • Switch on/off via circuit breaker of electrical cabinet
  • Exhaust must be connected to a facility hazardous gas exhaust system with filters/scrubbers
pp. 25-30
Maintenance, freeing the FB, standard repair exchange

Generally no on-site maintenance before factory overhaul; customer-site work limited to external cleaning, exhaust line checks, oil color/level checks and freeing the FB. Before removal, purge with nitrogen from the process tool for 30 min at process pressure/flow. Sections cover cabling changes in the motor terminal box and the standard repair exchange procedure (disconnection, water draining, pump draining, conditioning for shipping).

  • Purge N2 for 30 min at process values before disconnecting the pump
  • Maintenance area lighting > 300 lux; wait 5 minutes after power-off before electrical work
  • Always leak-test after maintenance; allow hot exhaust (> 70 °C possible) to cool
  • Repair exchange: disconnect, drain water circuit, drain pump, seal and pressurize with nitrogen for shipping
  • Overhaul only by manufacturer-trained personnel (support.service@pfeiffer-vacuum.fr)
pp. 31
Decommissioning and disposal

Procedures for prolonged shutdown, re-starting after storage, and disposal of the product and contaminated waste.

  • Used pumps must not be stored; return to service center per Service procedure
pp. 33-35
Malfunctions and troubleshooting

Describes what happens in the event of a defect and provides a troubleshooting guide; service and accessories chapters list support contacts and optional inlet pipe extension / exhaust anti-noise device.

  • Optional accessories: inlet pipe extension, exhaust anti-noise device (reduces vibration during repetitive atmospheric pumping)
  • Contact: support.service@pfeiffer-vacuum.fr
pp. 36-41
Technical data, facility characteristics, dimensions, weight distribution, maintenance area

Contains technical data tables, required environmental conditions, water and nitrogen characteristics, electrical characteristics, dimensional drawings, weight distribution (center of gravity) and required maintenance clearance area. Includes the Declaration of incorporation of partly completed machinery.

  • Motor: three-phase, UL/CSA/CE, cabled at factory for ordered voltage range (200-230 V or 380-480 V)
  • Storage/ambient temperature limits referenced in 12.2.1
  • Reference dimensions and center of gravity for lifting and floor loading

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
Pump is delivered without oil; only Pfeiffer Vacuum approved oil (factory-tested fluid) must be used, filled to mid-sight-glass level in each functional block housing p.15 ↗ Order oil cans with the pump; verify oil level in every FB sight glass before each start-up; wait a few minutes after filling for level to settle A124H MD (all FB housings)
Main circuit breaker must be curve D per IEC 60947-2 with ≥ 10 kA short-circuit cut-off capacity, installed max 7 m from the pump within line of sight p.20 ↗ Facility electrical design must reserve breaker placement adjacent to the pump; breaker rating per full-load current table in §12.2.4 whole series
Motor has 3 thermal safeties (100 °C, 120 °C, 150 °C), NC dry contacts rated 250 V max / 0.5 A max p.21 ↗ 150 °C contact must be wired to cut motor power (mandatory); 100/120 °C contacts recommended for overheat alert — all customer-implemented whole series
Nitrogen purge flow must be set per BF pressure: 20 slm @ 0.7·10³ hPa up to 60 slm @ 3.2·10³ hPa (regulator R1 + calibrated injectors) p.17 ↗ Size N2 supply and regulator for up to 60 slm; interlock gas flow stop on N2 loss to stay below LEL whole series
Nitrogen tubing: 6.35 mm OD (1/4 inch), customer supplied; manual shutoff valve required within 3 m of pump on both N2 and water circuits p.16 ↗ Include manual isolation valves in facility routing design for safe pressurized-circuit work whole series
Rotation direction check at initial start-up: brief pump start; inlet gauge pressure < 5·10⁻¹ hPa = correct rotation, otherwise invert two phases of the power plug p.21 ↗ Mandatory commissioning step with a customer-provided inlet pressure gauge before connecting process whole series
Pump weight is 213 kg; lifting requires 2-arm sling with arms > 500 mm and > 350 kg load per arm using supplied hoisting rings p.11 ↗ Specify lifting gear ratings and rigging plan; parts > 20 kg need lifting devices whole series
Storage requires pressurization with dry nitrogen to 200 hPa relative pressure, sealed blanking plates, max 1 year storage; pump ships N2-pressurized p.12 ↗ Keep blanking plates until connection to pumping line; never store a used pump — return to service center whole series
Before removing the pump from the installation, continue nitrogen purge from the process tool for 30 min at process pressure and flow rate p.25 ↗ Schedule 30 min purge in removal/maintenance procedures to clear residual process gases whole series
Flammable gas safety: dilute to 0.25x LEL (NFPA 69-2002 chap. 6.3.1); if dilution insufficient, oxidant concentration must stay < 0.6x MOC; hardware LEL detection at 25% LEL in exhaust must stop chemical supply p.8 ↗ Integrate LEL monitor and gas-supply interlock in exhaust abatement and tool interlock chain per EN 50495 whole series (implant source application)
Pump has no integrated EMO, no command system and no electric protection; host tool EMO must de-energize the pump; LO/TO per OSHA 29 CFR 1910.147 p.7 ↗ Integrator must supply breaker, emergency stop, differential breaker and lock-out hardware whole series
Connected parts/chambers at the inlet must withstand a negative pressure of 1·10³ hPa relative to atmospheric pressure p.23 ↗ Verify chamber/line vacuum integrity rating before hookup whole series
A second protective earth conductor with cross-section ≥ phase conductor size is required; earth wire must be longer than the 3 conducting wires p.20 ↗ Grounding design must include redundant PE termination at host frame/primary grounding point whole series
Motor supports two voltage ranges (200-230 V and 380-480 V), factory cabled per ordered variant; re-cabling in the motor terminal box is described in §7.5; full-load current on the motor box label p.6 ↗ Verify mains voltage label matches facility supply before energizing; use re-cabling procedure for voltage range changes variants ACP120GSP111x2 (200-230 V / 380-480 V)
External surfaces on the exhaust pipe can exceed 70 °C and remain hot after shutdown; wait 5 minutes after power-off before electrical work, wait 5 min stated for electrical components and complete cooldown before mechanical work p.9 ↗ PPE (EN 420 gloves) and cooldown waits must be built into maintenance SOPs whole series
Pumping line should be as short as possible with internal diameter ≥ pump inlet flange; flexible bellows recommended; optional inlet pipe extension and exhaust anti-noise device available as accessories p.22 ↗ Design connection to minimize conductance losses and vibration transmission whole series
Maintenance area lighting must exceed 300 lux; wait 5 minutes after switching off electricity before working on electrical components p.26 ↗ Facility maintenance zone design must meet lighting and electrical delay requirements whole series
Generally no customer-site maintenance is required before factory overhaul; all other maintenance and overhaul by manufacturer-trained personnel / service center p.26 ↗ Plan for standard repair exchange workflow rather than in-field rebuilds whole series