Operating instructions (EN, 78 pages) for the Pfeiffer Vacuum AMI 1000 leak testing equipment, customized version (part number not shown, '-' in the products table). Options configured at ordering include a tool set whose contents vary by part number, and specific customer-defined tools using the Interseal pumping port. This copy is a partial extract covering pages 1-32 (front matter, safety, transport/storage, product description, installation, and operation through calibration).
Section-by-Section Technical Breakdown
Describes identification, delivery contents, ordering options, and the human/machine interface (touchscreen, test port TWISTLOCK interface, light ring, ABORT/VENT / VERIFY / START buttons, USB3/Ethernet/HDMI, gas connectors). The equipment is available as a customized version with option-dependent tool set.
- Delivery includes: AMI 1000, operating instructions, customized mains cable, 2 capillary certificates, 3 gauge certificates, DN 50 ISO-KF TWISTLOCK adapter + flange + clamp, VERIFY ORIFICE plug and gripping handle, one verification orifice leak with certificate, cart panel key
- Interfaces: test input TWISTLOCK; CDA, venting gas and tracer gas supplies on G1/8" connectors; Interseal pumping on quick connector; USB3 x2, Ethernet, HDMI
- Gas bottle holders (x2), laptop table, handling handle, light ring
- Options: tool set (contents vary per part number); additional supplies per selected options
Equipment must stand horizontally on its feet, level, with 110 mm minimum clearance behind the air circulation grids and 12 h acclimatization before switching on. CDA operates the valves; venting gas (argon, ambient air, N2 or CDA only) and tracer gas (air, argon, N2 only) are customer-supplied; mains is a type E cable. A flow limiter (max 25 slm) is recommended against asphyxia on hose burst.
- Store/install ≥ 12 h under normal usage conditions before switching on; humidity-controlled, well-lit area; do not obstruct air vents
- Rear air circulation grids must be ≥ 110 mm from fixed walls
- Circuit: supply 90-250 V AC / 50-60 Hz / 16 A MAX via provided type E mains cable; use shielded cables in EMC-prone environments; do not override circuit breaker interlocks
- Venting gas allowed: argon, ambient air, nitrogen, CDA only; tracer gas allowed: air, argon, nitrogen only
- Fit flexible hoses of the same diameter as connectors to reduce vibration transmission; provide isolation valve in CDA circuit for maintenance
- Do not leave the VERIFY ORIFICE port open — fit the plug if no orifice leak is installed
- Interseal pumping quick connector is for pumping/venting the interseal space of specific manufacturer/customer-defined tools (customer-supplied)
Commissioning requires all supply connections checked, three switches to I, login, START STANDBY, then the flashing green START button. Standard shutdown runs via [Advanced] > [Exit] > [Shutdown] with a status indicator before power-off; emergency stop is done by disconnecting the mains cable. The light ring and buttons encode status: PASS green, FAIL red, INVALID violet; secondary pump readiness is indicated by speed thresholds 28,000 and 75,000 rpm.
- After switching on, place equipment in standby and wait at least 12 hours before use
- Secondary pump not ready: yellow ring at 28,000 rpm < speed < 75,000 rpm; red at speed < 28,000 rpm
- Shutdown procedure in progress: red display, do not disconnect mains cable; finished: blue, disconnect mains cable
- Buzzer (volume not adjustable) warns on invalid test result, test chamber open too long, or active alarm; each source can be individually disabled
- Access levels: Operator can open chamber/start standby, start/stop test and calibration; Advanced additionally abort UUT creation; Administrator has restricted test/calibration rights; alarms visible to all, acknowledging restricted at Operator level
Workflow: create UUT, create recipe, calibrate recipe, then run batch test. UUTs for calibration and test must be in identical temperature/humidity conditions, stored near the equipment at least 1 hour; wait at least 1 hour (preferably 24 h) before reusing the same UUT. Calibration validity expires after 24 hours, and any change to recipe, UUT parameters or test mode invalidates the recipe.
- Recipe calibration status values: 'Valid', 'Invalid - Calibration required', 'Invalid - Expired' (> 24 h)
- Calibration steps include Calibration Offset/Span (ALPS sensor), Pressure Adjustment (Massive Leak Detection mode, two sub-steps: sealed UUT then no UUT), Calibration Big Leak (Vacuum Decay mode, one measurement), Big Leak Verification, Overlap Verification (requires calibrated leak connected to VERIFY ORIFICE), Upper/Lower Point Verification and Blank tests
- Clean seals and chamber interior with alcohol and soft lint-free cloth before operations
- Operator-level calibration is guided step-by-step; Advanced level can select steps and re-validate an expired calibration without performing steps; forcing a stop during a type 37xx alarm requires a privilege
- Automatic calibration verification steps can be individually disabled in the recipe [Calibration] tab
- A calibration report is auto-generated, named Calibration - Date - Time; closable as Valid / Abort / Cancel
The full document (78 pages) contains chapters for advanced menus (Users Manager, Files Transfer, Configuration, Events, Maintenance, Leak Signal Monitoring, Recipe Manager, UTT Manager, Air Sensor Spectra, Buzzer Manager, Capillaries Manager), decommissioning/recommissioning/disposal, malfunctions (test result/warning/alarm messages, type 37xx alarms, migration and recovery procedures), and maintenance (filter replacement, pressure check, panel disassembly, spare parts). Technical data and dimensions are given in chapter 13, not included in this extract.
- Chapter 9 'Malfunctions' (p. 58-61): display/acknowledgement of messages, troubleshooting for test result, warning and alarm messages, migration and recovery procedures
- Chapter 10 'Maintenance' (p. 62-69): maintenance frequency, component locations, panel disassembly, pressure check, venting exhaust gas filter cleaning/replacement, CDA and calibration gas inlet filter replacement, vent expander replacement, spare parts
- Chapter 8 'Decommissioning' (p. 57): long-term shutdown, recommissioning, disposal
- Chapter 13 'Technical data and dimensions' (p. 73-75): environmental conditions, CDA/venting/tracer gas characteristics, pressure and gas-throughput unit conversion tables, equipment and on-cart dimensions, maintenance space required
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Mains supply requirement: 90-250 V AC, 50-60 Hz, 16 A max, connected via a type E mains power cable. p.9 ↗ | Size the site supply and breaker for 16 A; mains connection must remain visible and accessible for disconnection at any time. | AMI 1000 (all models) |
| Minimum clearance of 110 mm required behind the equipment where the air circulation grids are located; air vents must not be obstructed. p.18 ↗ | Reserve installation space to guarantee performance within operating conditions. | AMI 1000 |
| Equipment must be stored ≥ 12 h under normal usage conditions before switching on, and after switching on placed in standby with ≥ 12 h wait before use. p.18 ↗ | Plan a ~24 h warm-up/acclimatization window before the first valid measurement. | AMI 1000 |
| Venting gas may only be argon, ambient air, nitrogen or CDA; tracer gas may only be air, argon or nitrogen; all other gases require manufacturer approval or are prohibited. p.19 ↗ | Restrict gas selection in the installation design; using other gases voids compliance. | AMI 1000 |
| Recommended flow limiter on N2/Air/O2 gas circuits with maximum authorized flow of 25 slm to prevent asphyxia in case of hose burst. p.19 ↗ | Include a ≤25 slm flow limiter and adequate room ventilation in the gas supply design. | Venting gas and tracer gas circuits |
| Misuse includes analyzing gas with hydrogen concentration higher than 5%. p.13 ↗ | Do not use the unit as an H2 leak detector above 5% H2 concentration — this voids warranty and is unsafe. | AMI 1000 |
| Hot surfaces > 65 °C can occur depending on application; EN ISO 21420 protective gloves required. p.12 ↗ | Apply burn-protection precautions and wait for cool-down before any intervention. | AMI 1000 |
| Recipe calibration validity expires after 24 hours ('Invalid - Expired'); any modification of recipe parameters, UUT parameters, or test mode invalidates the recipe and requires recalibration. p.28 ↗ | Schedule daily calibration in production planning; treat any recipe/UUT edit as triggering recalibration of all affected recipes. | AMI 1000 recipes (Recipe Manager) |
| UUTs must be stored near the equipment ≥ 1 hour for temperature/humidity stabilization, and the same UUT must rest ≥ 1 hour (preferably 24 hours) before reuse to reabsorb humidity. p.27 ↗ | Provide multiple UUTs or dwell time in the test workflow to avoid invalid measurements. | AMI 1000 calibration and testing |
| Gross leak mode has two configurable variants: Massive Leak Detection (Pressure Adjustment calibration with 2 sub-steps: sealed UUT, then no UUT) and Vacuum Decay (Calibration Big Leak, 1 measurement), both used with the ALPS sensor. p.27 ↗ | Recipe sensor configuration (ALPS only vs ALPS + gross-leak mode) dictates the mandatory calibration steps. | AMI 1000 recipe configuration |
| Secondary pump readiness is signaled by turbine speed: yellow ring at 28,000 < rpm < 75,000 rpm, red at rpm < 28,000 rpm. p.23 ↗ | Do not start tests until the pump-ready status is displayed; speed thresholds allow diagnostic interpretation of the light ring. | AMI 1000 |
| Test result indication: PASS = green ring, FAIL = red ring, INVALID = violet ring. p.23 ↗ | Integrate visual result status into operator procedures or line acceptance logic. | AMI 1000 |
| Test port connection is DN 50 ISO-KF with TWISTLOCK adapter; delivery includes matching flange and clamp; standard shutdown requires fitting the blank-off flange on the test port. p.16 ↗ | Specify DN 50 ISO-KF tooling for UUT connections and refit the blank-off set after each session. | AMI 1000 |
| After emergency power-off, wait 5 minutes and until the control panel screen is fully off before working on or moving the product. p.14 ↗ | Embed a 5-minute lockout period into maintenance procedures to avoid detector component damage. | AMI 1000 |
| Backing pump isolation valve must be closed before disconnecting the pumping port (safety label requirement). p.9 ↗ | Include valve closure in pump removal SOPs to prevent air ingress/oil loss. | AMI 1000 backing pump connection |
| Capillary and gauge certificates: 2 capillary certificates (1 per capillary) and 3 gauge certificates (1 per gauge) are delivered. p.16 ↗ | Traceability chain includes 2 calibrated capillaries and 3 gauges; retain certificates for calibration audits. | AMI 1000 |
| Buzzer volume is not adjustable — only enable/disable; each warning source (invalid result, open chamber too long, alarm) can be disabled individually via the Buzzer Manager menu. p.26 ↗ | Configure buzzer sources per line requirements; no volume tuning is possible. | AMI 1000 |
| Calibration can be stopped only by a privileged user in the event of a type 37xx alarm or emergency stop; normal users cannot interrupt in that case. p.29 ↗ | Assign the force-stop privilege to at least one qualified user per shift. | AMI 1000 user management |
| Storage limit is 3 months in original packaging under specified temperature conditions; longer storage risks elastomer/lubricant damage. p.14 ↗ | For idle periods > 3 months, contact Pfeiffer service and follow recommissioning steps (chapter 8). | AMI 1000 |
| Equipment must not be operated with inlet/exhaust disconnected from the pumping line, and blanking plates must remain fitted on ports otherwise. p.13 ↗ | Verify port sealing before power-up; prevents contamination and safety issues. | AMI 1000 |