DuoVane 12 — instruction manual duovane 6

Technical Reference Summary

Covered Models & Document Scope

Operating instructions for Pfeiffer Vacuum DuoLine two-stage oil-sealed rotary vane pumps: Duo 6 (standard), Duo 6 M (magnetic coupling), and Duo 6 MC (corrosive gas version with magnetic coupling, F4 operating fluid, changed vane material, hose connection on gas ballast valve, leakage rate ≤1×10⁻⁸ Pa·m³/s). Covers transport, installation, operation, maintenance, troubleshooting, spare parts and technical data. Motor variants: single-phase fixed voltage and reversible voltage (100/200 V or 115/230 V switchable, 50/60 Hz).

Section-by-Section Technical Breakdown

pp. 18-19
Product description

Describes the DuoLine pumps as two-stage oil-sealed rotary positive displacement pumps for coarse and medium vacuum, equipped with a vacuum safety valve. Explains operating principle, gas ballast valve function and the roles of the operating fluid.

  • Two-stage, oil-sealed rotary vane design with centrifugally- and spring-loaded sliding vanes; exhaust valve is oil-sealed.
  • Vacuum safety valve seals the vacuum chamber at standstill and vents the pump so oil cannot rise into the chamber; opens with delay after switch-on.
  • Gas ballast blends ambient air or inert gas with process gas to expel vapor mixtures without condensation in the suction chamber.
  • M version pump housing is hermetically sealed via non-contact, wear-proof magnetic coupling.
pp. 22-27
Installation

Covers mechanical placement (flat surface, ≤±10° inclination, >35 mm clearance), vacuum and exhaust side connection, mains power connection with fuse ratings and voltage selector, and initial operating fluid filling.

  • Minimum vacuum/exhaust line cross section equal to the nominal diameter of the connection flange; connect with centering ring with cone sieve, O-ring and circlip; piping must not impose forces on the pump.
  • Exhaust pressure must be at least 250 hPa higher than intake pressure; negative pressure in the exhaust line is permitted only on pumps with magnetic coupling; max 1500 hPa absolute; route exhaust line without shut-off units and downwards to avoid condensate return.
  • Recommended slow-blow fuses: 100–115 V: 16 A (4.1 A @50 Hz / 5.3 A @60 Hz rated current); 100/200 V: 16/6 A (4.3/2.3 A @50 Hz, 5.7/3.2 A @60 Hz); 115/230 V: 16/6 A (4.0/2.1 A @50 Hz, 4.8/2.7 A @60 Hz); 200–240 V: 6 A (2.5 A @50 Hz, 3.0 A @60 Hz).
  • Voltage selector switch positions: '115'/'1' = 115 V ±10 %, '230'/'2' = 230 V ±10 % (or 100/200 V); change only with pump disconnected from mains.
  • Approved operating fluids: P3 (standard), F4 (corrosive gas version), D1 (special applications such as higher operating temperatures); type and quantity shown on rating plate.
  • Initial cold fill: maximum 3/4 of the min./max. range of the sight glass; filler screw tightening torque max 0.3 Nm (Allen key WAF 5).
pp. 28-31
Operation

Pre-start checks (fluid level, voltage match, exhaust free passage), switching on, operation with gas ballast, refilling operating fluid and switching off. Warns of toxic exhaust media, exhaust line bursting, hot surfaces and automatic motor restart.

  • Before switching on: check operating fluid in sight glass, compare mains voltage/frequency with motor rating plate, check exhaust connection free passage (max 1500 hPa absolute).
  • Open shut-off units before or at the same time as the pump starts.
  • The magnetic coupling does not provide overload protection for the motor despite its strong torque.
pp. 32-41
Maintenance

Maintenance instructions including a checklist with intervals, operating fluid change procedure, determining degree of aging of P3 fluid, rinsing/cleaning the pump, cleaning the gas ballast valve (including corrosive gas version) and changing fluid type. Maintenance levels 1–3 with defined personnel qualifications.

  • Maintenance level 1: trained customer; level 2: customer with technical education or PV service technician; level 3: customer with PV service training or PV service technician.
  • Decontaminate parts exposed to toxic process media before maintenance; wear PPE when handling contaminated operating fluid.
  • Allow pump to cool before work; wear protection against scalding when draining hot operating fluid.
pp. 42-43
Decommissioning, Recycling and Disposal

Shutting down for longer periods and recommissioning procedure, plus general disposal information and disposal of the rotary vane pump.

  • Toxic-contaminated components must be decontaminated and disposed of according to local regulations.
pp. 44-47
Malfunctions

Troubleshooting table for rotary vane pumps (Tbl. 7) covering malfunctions and remedies, plus pointer to Pfeiffer Vacuum service solutions.

pp. 48-51
Spare parts and Accessories

Spare parts packs by maintenance level: Maintenance kit 1 (level 1), radial shaft seal ring set (level 2), Maintenance kit 2 extended (level 2), overhaul kit (level 3), set of vanes, and coupling set for magnetic coupling versions. Accessories and consumables ordering tables are provided.

  • Spare parts structured by maintenance level 1–3; separate coupling set exists for versions with magnetic coupling.
pp. 52-57
Technical data and dimensions

General data, materials in contact with process media, pressure and gas throughput unit conversion tables, separate technical data tables for Duo 6, Duo 6 M and Duo 6 MC, and dimension drawings for all versions and voltage variants.

  • Separate data tables: Tbl. 14 (Duo 6), Tbl. 15 (Duo 6 M), Tbl. 16 (Duo 6 MC).
  • Dimension figures for Duo 6 / Duo 6 M (115/230 V switchable and 100–115 V) and Duo 6 MC (115/230 V switchable).

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
Permissible installation inclination is ±10°; pump must be placed on a flat, horizontal surface to safeguard operating fluid supply. p.22 ↗ Mounting surface must be levelled; base plate can be screwed down if needed. whole series
Exhaust pressure limit is ≤ 1500 hPa absolute; exhaust line must be routed without shut-off units. p.14 ↗ Undersized or blocked exhaust lines risk bursting and pump damage; check exhaust line function regularly. whole series
Exhaust pressure must be at least 250 hPa above intake pressure; negative exhaust pressure is permitted only on pumps with magnetic coupling (M/MC versions). p.23 ↗ Standard Duo 6 must never see negative exhaust pressure; size exhaust lines accordingly. Duo 6 vs Duo 6 M/MC
Ambient temperature range +12 °C to +40 °C; max relative humidity 85 %; pumped medium intake temperature max +40 °C. p.14 ↗ Selection and cooling design must respect these limits or performance/warranty is compromised. whole series
Above 1000 m installation altitude, motor rated power must be reduced or ambient temperature limited due to increased heating; max altitude 2000 m. p.14 ↗ High-altitude installations require derating or cooling measures. whole series
Protection class I, pollution degree 2, overvoltage category II, permissible protection degree IP40, housing Type 1 per UL 50E. p.14 ↗ Pump is not for dusty/wet environments without additional enclosure; PE connection mandatory. whole series
Surface temperature can exceed 70 °C in normal operation and above 105 °C during a fault. p.11 ↗ Provide touch protection if untrained persons have access; allow cool-down before any work. whole series
Magnetic field of the coupling: persons with pacemakers/medical implants must stay ≥ 2 m away; disassembled couplings must be kept away from computers and data carriers. p.12 ↗ Mark magnetic coupling rooms accordingly and handle couplings as ESD/magnetic hazards. Duo 6 M and Duo 6 MC only
Recommended slow-blow on-site fuses: 100–115 V → 16 A; 100/200 V → 16/6 A; 115/230 V → 16/6 A; 200–240 V → 6 A (rated currents 2.5–5.7 A depending on voltage/frequency). p.25 ↗ Fuse sizing per voltage/frequency variant protects motor and supply cable; thermal switch does not permanently shut down motor. whole series (per motor variant)
Reversible motor voltage selector switch positions: '115'/'1' = 115 V ±10 %, '230'/'2' = 230 V ±10 % (also 100/200 V variant); all voltages 50/60 Hz, ±10 %. p.26 ↗ Verify on-site mains voltage and selector setting before every installation or relocation; change only when disconnected from mains. pumps with reversible single-phase motor
The magnetic coupling does not provide overload protection for the motor. p.25 ↗ External fuse/overload protection is mandatory; do not rely on the coupling to slip. Duo 6 M and Duo 6 MC
Initial cold fill of operating fluid: max 3/4 of the min./max. range of the sight glass; filler screw torque max 0.3 Nm with Allen key WAF 5. p.27 ↗ Overfilling risks oil escape; correct torque prevents O-ring damage. whole series
Approved operating fluids: P3 (standard), F4 (corrosive gas version), D1 (special applications, e.g. higher operating temperatures); type/quantity specified on rating plate. p.26 ↗ Using non-approved fluids voids warranty and performance data; changes only after consulting Pfeiffer Vacuum. whole series
With oxygen concentration ≥ 21 %, only perfluorinated synthetic oils (F4, F5, A113) may be used; D1/mineral oil forbidden above 21 % O₂. p.15 ↗ Mineral oils are combustible and ignite in pure oxygen; oxygen applications require perfluorinated fluids. whole series
Vacuum and exhaust line cross sections must be at least equal to the flange nominal diameter; connection uses centering ring with cone sieve, O-ring and circlip. p.22 ↗ Undersized lines reduce pumping speed; support piping so no forces act on the pump flanges. whole series
Vacuum safety valve seals the vacuum chamber at pump standstill and vents the pump so oil cannot rise into the chamber; it opens with delay after switch-on. p.19 ↗ Chamber stays isolated on unintended shutdown; do not restrict valve function. whole series
For storage, fill pump with operating fluid to the upper edge of the sight glass, seal all openings, close gas ballast valve, and change fluid if storage exceeds 2 years. p.20 ↗ Prevents corrosion and preserves seal integrity during long-term storage. whole series
Duo 6 MC has leakage rate ≤ 1 × 10⁻⁸ Pa·m³/s and hermetically sealed pump housing via encapsulated magnetic coupling. p.7 ↗ MC version suitable for applications demanding tightest sealing/corrosive gas compatibility. Duo 6 MC only
Motor restarts automatically after power failure or overheating-related standstill; exhaust burst danger from faulty lines; motor thermal switch does not permanently shut down the motor. p.11 ↗ Secure motor against restart before any maintenance work on the vacuum flange or rotating parts. whole series
Maintenance spare parts are tiered: Maintenance kit 1 (level 1), radial shaft seal ring set and Maintenance kit 2 extended (level 2), overhaul kit (level 3), plus set of vanes and magnetic coupling set. p.48 ↗ Plan service stocking by maintenance level; levels 2–3 require trained/PV-trained personnel. whole series