Agilent Technologies 725 ICP OES
Agilent Technologies ·Made in USA · In Active Production

Agilent Technologies 725 ICP OES

Agilent Technologies 725 ICP OES — Atomic spectroscopy.

The Agilent 725 ICP OES is a radial-plasma optical emission spectrometer in the 700 Series, distinguished from the axial-plasma 710/720 by its radial induction coil (4.7 mm pitch) and side-on plasma viewing. It operates a ~10,000 K argon plasma driven by a 40 MHz, 1500 V RMS work coil, with argon flows of 9–32.8 L/min and optional nitrogen purge. It is used for multi-element trace analysis in laboratory atomic spectroscopy.

Full specifications

Core Performance & Functional Specifications
Consumables 42
Nitrogen (argon Only) 20 ppm
Oxygen Content 5 ppm
Plasma Temperature 10000 K
Standby Mode Flow 0.75 L/min
Water Vapor 4 ppm
Argon purity mfr 99.996
Nitrogen purity mfr 99.996
Permissible pressure range mfr 400...600 kPa
Recommended pressure mfr 550 regulated
Operational range (plasma on) mfr 9...32.8 L/min
Measuring wavelengths > 200 nm (poly boost off) mfr 13.5...21.75 L/min
Measuring wavelengths < 200 nm (poly boost on) mfr 15.75...24 L/min
Drain vessel minimum capacity mfr 2 liters
Standby mode nitrogen flow mfr 0.45 L/min
Operational range (plasma on) argon flow mfr 8.3...29.1 L/min
Operational range (plasma on) nitrogen flow mfr 0.45...2.1 L/min
Measuring wavelengths > 200 nm (poly boost off) argon flow mfr 12.75...21 L/min
Measuring wavelengths > 200 nm (poly boost off) nitrogen flow mfr 0.45 L/min
Measuring wavelengths < 200 nm (poly boost on) argon flow mfr 12.75...21 L/min
Measuring wavelengths < 200 nm (poly boost on) nitrogen flow mfr 2.1 L/min
Purity mfr 99.996
General mfr 7
Verifying Safe State mfr 8
Heat, Vapors and Fumes mfr 9
Compressed Gas Hazards mfr 9
Electrical Hazards mfr 10
Other Precautions mfr 10
Warning Symbols mfr 11
Color Coding mfr 14
Electromagnetic Compatibility mfr 15
Analysis Checklist mfr 27
Turning On the Instrument and Software mfr 28
Preparing for Analysis mfr 30
Calibrating the Detector mfr 30
Aligning the Torch mfr 30
Setting Operating Conditions mfr 31
Creating/Opening a Worksheet mfr 31
Developing a Method mfr 31
Running Samples mfr 32
Printing a Report mfr 32
Turning Off the Instrument mfr 32
Routine Maintenance mfr 38
Induction Coil Maintenance mfr 39
Cleaning mfr 41
Troubleshooting mfr 42
Spare Parts mfr 42
Oxygen impurity limit mfr 5 ppm
Permissible gas pressure range mfr 400...600 kPa
Recommended gas pressure mfr 550 regulated
Dimensions, Weight & Mechanical Design
Radial induction coil pitch mfr 4.7 mm
Axial induction coil pitch mfr 7.5 mm
Instrument weight mfr 203 kg
Gas supply hose length mfr 1.8 meters
Electrical, Power & Drive Specifications
Work Coil Frequency 40 MHz
Fuse 1FS1 and 1FS2 mfr 6.3 mm
Circuit breaker 1CB1 mfr 30 A
Work coil voltage mfr 1500 RMS
Fuse 1FS1 and 1FS2 rating mfr 6.3 V
Circuit breaker 1CB1 rating mfr 30 trip
Operating Conditions, Environment & Protection
Ambient temperature limit 20 °C
Maximum permissible cooling water pressure mfr 310 kPa
Minimum cooling water flow mfr 1.1 L/min
South Korean Class A EMC declaration mfr 16
Cooling water flow trip threshold mfr 1.1 L/min
Standards, Safety & General Data
CE Compliance mfr 14

Description

Construction and series positioning

Plasma and gas behavior

Installation, control and operation

Integration & Operating Notes

Process Limits
Gas purity below 99.996% compromises plasma and purge

Argon and nitrogen must be 99.996% pure with O2 <5 ppm, H2O <4 ppm and N2 in argon <20 ppm. Lower purity affects plasma stability and optical purge performance, so specify instrument-grade gas and suitable filters at the regulator.

User Manual, Gas Supplies, p.20
Cooling & Media
Cooling water flow below 1.1 L/min trips plasma and Peltier

A water flow sensor stops the plasma and camera Peltier assembly if flow drops below 1.1 L/min (0.3 gpm). The cooling system must be on before ignition, and supply pressure above 310 kPa requires a pressure regulator.

User Manual, Water Chiller System, p.21
Maintenance
Induction coil service only by Agilent field service engineer

Coil pitch must be 4.7 ±0.5 mm for the radial coil; out-of-tolerance pitch degrades RF field uniformity and risks melting the torch or torch clamp. Coil service is strongly recommended only by an Agilent field service engineer; the torch must be centered with uniformly spaced loops.

User Manual, Induction Coil Maintenance, p.40-41
Process Limits
Allow 20 min Poly Boost purge before wavelength calibration

Poly Boost purge must be left on for at least 20 minutes before wavelength calibration. A dark current scan takes about 2 minutes and wavelength calibration up to 2–3 minutes; plan this time during installation and after any purge interruption.

User Manual, Installation, p.25
Maintenance
Drain vessel must be inert, non-glass, ≥2 L and checked hourly

Provide a chemically inert container, not glass or narrow-necked, holding at least 2 liters, located underneath the sample compartment or on the right side. Check and empty it hourly during operation to avoid overflow.

User Manual, Drain Vessel, p.22

Selection & Integration Q&A

When should I choose the 725 radial-plasma model over the axial 710/720 siblings?

Choose the 725 when radial viewing suits your matrices (reduced matrix effects, higher-concentration samples). The 710/720 use an axial plasma with a 7.5 mm coil pitch; the 725 uses a radial coil at 4.7 mm pitch. Axial siblings favor lower detection limits.

What gas supply and purity must be in place before the 725 can be integrated?

Argon (and nitrogen if the purge kit is fitted) at 99.996% purity, O2 <5 ppm, H2O <4 ppm, N2 in argon <20 ppm. Regulated pressure 400–600 kPa, recommended 550 kPa. PTFE hoses are 1.8 m with Swagelok fittings; size for 9–32.8 L/min operational argon flow.

What laboratory environment and duty-cycle conditions does the 725 require?

Ambient 20–25 °C held within ±2 °C through the working day. Exhaust must vent outside and run before ignition. Cooling water flow >1.1 L/min and pressure ≤310 kPa. The torch area stays hot up to 5 min after plasma off; the drain vessel must be checked hourly.

What maintenance and accessories are operator-performable versus service-only, and what is not included in base delivery?

Operator tasks: torch replacement, cone cleaning, peristaltic pump tubes, fuses, exterior cleaning. Coil service and internal fuses are Agilent field service only. Not included: cooling water chiller, exhaust system, drain vessel, gas regulators/cylinders, and the USB-GPIB-HS converter is required for software communication.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
ICP-OES User's Guide
Manual ·44 pp.
View PDF