Shimadzu Tescan Quiin
Shimadzu ·Made in Japan · In Active Production

Shimadzu Tescan Quiin

Shimadzu Tescan Quiin — Microscopes.

The Tescan Quiin is a focused ion beam (FIB) system with a SEM column in coincidence point, using a Wien filter for isotope selection and YAP scintillator detectors. It operates with gas ions (N, Ar, O, He, Xe or mixtures) and metal ions (Au, Ge, Si) at 3–30 keV, and integrates an in-situ heating stage (FurnaSEM 1000) for annealing above 950 °C. It is intended for advanced nanofabrication, isotope-selective implantation, and high-temperature material studies within a single vacuum platform.

Full specifications

Description

Construction and positioning

Selection & Integration Q&A

When should I choose the Tescan Quiin over other FIB-SEM systems in the series?

Choose the Quiin when you need isotope-selective ion beams (via Wien filter) and in-situ heating above 950 °C. It is ideal for studies requiring precise dose control and multi-species ion implantation. Other models may lack these specialized features.

What are the requirements for the vacuum system and gas delivery when integrating the Quiin?

The Quiin requires a high-vacuum environment compatible with FIB and SEM operation. Gas delivery lines for N, Ar, O, He, Xe or mixtures must be of high purity and materials compatible with the reactive species. Metal ion sources require dedicated ports and power supplies.

What are the duty-cycle and environmental limits for continuous operation of the Quiin?

Continuous operation at high beam currents or elevated temperatures may require cooling breaks. The heating stage should not be operated above 950 °C for extended periods without verifying sample stability. Ambient temperature and humidity must be within laboratory standards to ensure electronics reliability.

What maintenance items and consumables are not included with the base system?

The base delivery does not include gas cylinders, metal ion source materials, sample holders for the heating stage, or calibration standards. Regular replacement of YAP scintillators and Wien filter components may be required. A service contract for software updates and preventive maintenance is recommended.

Dimensional Drawings & Technical Documentation

Technical documentation