-
Warning
pp. 3-4
Safety warnings, hazard symbols, and flashback response procedures
-
Procedure
pp. 5-6
Connecting and configuring the Duo system
-
Warning
pp. 7-25
Electrical, thermal, gas cylinder, hose, and flame safety guidance
-
Overview
pp. 26-27
Graphite furnace and Zeeman operation safety notes
-
Overview
pp. 28-32
Front and rear views of flame and graphite furnace instruments
-
Config.
pp. 33-37
Electrical, gas supply, and PC requirements for installation
-
Procedure
pp. 38-45
IEEE address, autosampler, USB-RS232, software startup, Tube-CAM driver
-
Overview
pp. 46-52
SpectrAA software windows, worksheets, reports, and help
-
Procedure
pp. 53-56
Starting the system and initial operation steps
-
Procedure
pp. 57-62
Daily checks, surface cleaning, filters, and flashback prevention
-
p. 3 table, 25 rows
-
p. 4 table, 28 rows
-
p. 5 table, 28 rows
-
p. 6 table, 21 rows
-
p. 7 table, 13 rows
-
p. 30 table, 11 rows
-
p. 33 table, 18 rows
-
p. 36 table, 5 rows
-
p. 37 table, 17 rows
-
p. 56 table, 3 rows