Induztr
Resumen técnico Visor de documentos Modelos relacionados

Measuring Lead in Water

Contenido

  1. Overview p. 1
    Introduces the purpose of measuring lead in water
  2. Procedure p. 2
    Shows a worked example of the lead analysis process
  3. p. 3
    Presents the results of the analysis
  4. p. 2 table, 2 rows

Table 3. The optimum conditions determined for the standard and sample were similar, indicating that the modifier mix was suited to the application.

TemperatureStandardSample
Ash (°C)598614
Atomize (°C)14351476

Engineering Facts

11 facts · every claim linked to a page
Cumplimiento

The method is aligned with multiple international drinking-water lead standards, so it can be selected for regulated Pb testing across several jurisdictions.

Confirms the method covers the regulatory frameworks a lab must satisfy when choosing an analytical setup.

Source
“Standards: ISO 15586:2003 U.S. EPA Method 200.9 IS 10500; IS 14543, IS 13428 GB 5749-2006 3113 B:2012”
Selection

The instrument relies on the Stabilized Temperature Platform Furnace concept, which is a key selection criterion for reproducible graphite furnace Pb analysis.

STPF compliance affects accuracy and method transferability when selecting a GFAA system.

Source
“Agilent AA instruments feature the Stabilized Temperature Platform Furnace (STPF) concept.”
Operation

The SRM Wizard can automatically determine optimal ash and atomize temperatures, reducing manual method development effort.

Automated optimization shortens setup and lowers operator skill requirements during commissioning.

Source
“The SRM Wizard, an integrated feature of the instrument software, can automatically determine the best ash and atomize temperatures.”
Installation

An extraction/LED accessory improves fume removal over standard ventilation ducts and aids capillary alignment.

Ventilation and access requirements influence lab layout and installation planning.

Source
“An extraction/LED accessory (see Figure 3) allows for improved fume removal compared to standard ventilation ducts.”
Operation

Lead atomization was performed from a pyrolytic platform Omega tube, which is the specified consumable for this method.

Specifying the correct tube type is essential for reproducing the method and ordering consumables.

Source
“Atomization for Lead was from a pyrolytic platform Omega tube.”
Operation

The inert gas must be 99.99% pure argon, a purity requirement that affects gas supply setup.

Gas purity directly impacts baseline, sensitivity, and tube lifetime, so the supply must be specified at installation.

Source
“The inert gas used was 99.99% pure argon.”
Performance

The instrumental detection limit for a 20 µL injection is 0.15 µg/L, well below the 10 µg/L regulatory guideline.

Detection limit margin determines whether the system meets the required regulatory reporting levels.

Source
“Instrumental Detection limit for 20 µL: 0.15 µg/L”
Performance

Recoveries of 100.1% for the SRM and 103.6% for spiked water demonstrate method accuracy for selection justification.

Accuracy data supports method validation and instrument selection decisions.

Source
“% recovery of SRM: 100.1 % • % recovery of water spiked with 25 µg/L: 103.6%”
Safety

The optional extraction accessory removes ashing vapors at their source and eliminates the need for direct positioning under an exhaust fan.

Local fume extraction affects lab safety compliance and placement flexibility during installation.

Source
“the exhaust system removes ashing vapors at their source.”
Maintenance

The system lowers argon consumption and increases graphite tube lifetime, reducing operating costs.

Consumable and gas consumption drive long-term operating cost when selecting a system.

Source
“The 240Z is a cost effective solution, lowering argon consumption and increasing graphite tube lifetime without compromising accuracy and precision.”
Operation

The integrated Tube-CAM video is used to control injection and dry steps, aiding consistent sample deposition.

Visual control of injection improves reproducibility and reduces operator-dependent errors.

Source
“The instruments' Tube-CAM video can be used to control the injection and dry steps of the measurement.”

Modelos relacionados