The unit's cooling capacity drops as ambient temperature rises, so it must be sized with margin for warm rooms.
Prevents undersizing when the installation room is warmer than 20 °C.
Source
“If the ambient temperature rises, the cooling capacity may drop.”
Installation
The device must be operated only within an ambient temperature window of 5 to 40 °C.
Defines allowable room conditions for reliable operation and warranty.
Source
“min. ambient temperature
5 °C
max. ambient temperature
40 °C”
Installation
Voltage and frequency tolerances are coupled: ±5 % voltage only with ±2 % frequency, and opposite-sign deviations are not allowed.
Prevents connecting to unstable mains that would violate EN60034-1 tolerances.
Source
“-5% voltage and +2% frequency -> not allowed!”
Installation
Single/two-phase units are delivered with a country-specific plug that must be specified at ordering.
Avoids missing or wrong plug on delivery and rework at site.
Source
“with power cable and country-specific plug (please specify when ordering)”
Installation
Three-phase devices below 63 A come with cable but without plug, so a plug must be sourced separately.
Plans the electrical termination and avoids a missing plug during commissioning.
Source
“Three-phase devices with current consumption less than 63A --> with cable, without plug”
Safety
The second refrigerant stage is R-1150 (A3, H220), a flammable refrigerant requiring appropriate handling.
Triggers flammable-refrigerant safety measures for installation and service.
Source
“R-1150 (A3, H220)”
Cumplimiento
The equipment is EMC Class A Group 1, so it may cause interference in residential environments.
Restricts use to industrial/commercial locations and informs EMC planning.
Source
“Classification (disturbance) to EN55011: Class A, Group 1”
Installation
The unit is pressure equipment under Art. 4.3 PED, which affects documentation and conformity obligations.
Determines the regulatory regime applicable to the pressure side.
Source
“Pressure equipment category
Art. 4.3 PED”
Installation
Space requirements around the unit must be respected per the operating conditions.
Ensures adequate air flow for the air-cooled condenser and service access.
Source
“Please respect space requirements. See operating conditions”
Selection
The probe has a 48 mm nominal diameter and 155 mm length, which must fit the vessel opening.
Confirms mechanical compatibility with the application vessel before ordering.
Source
“Nominal diameter probe
48 mm
Length of probe
155 mm”
Installation
The flexible connection is 1150 mm long, limiting how far the probe can reach from the unit.
Determines the physical layout between the refrigerating unit and the probe.
Source
“Length flexible connection
1150 mm”
Installation
The unit requires a minimum 10 A fuse and permits up to 16 A, with 6.5 A max current.
Sizes the electrical protection and supply circuit correctly.
Source
“max. current
6,5 A
min. Fuse
10A
max. Fuse
16A”