Installation
The unit requires a three-phase 400 V supply with a 3x10 A fuse, so the electrical installation must be sized accordingly.
Determines the site power connection and protective device rating before installation.
Source
“Power supply (3 Phase) 400V 3~ 50Hz”
Installation
Three-phase devices under 63 A are delivered with a cable but without a plug, so the customer must provide and fit the site plug.
Affects procurement and electrical hook-up planning.
Source
“Three-phase devices with current consumption less than 63A --> with cable, without plug”
Installation
Voltage and frequency tolerances must be met simultaneously, and a -5% voltage with +2% frequency combination is explicitly not allowed.
Prevents selecting a supply point whose combined tolerances would violate the permitted operating envelope.
Source
“-5% voltage and +2% frequency -> not allowed!”
Operation
Cooling capacity is rated at 20 °C room temperature and may drop at higher ambient temperatures, so capacity must be derated for warm rooms.
Affects whether the chiller can hold the required process load in the actual installation room.
Source
“Output data valid for: Room temperature 20°C. If the ambient temperature rises, the cooling capacity may drop.”
Installation
The unit is rated for ambient temperatures from 5 °C to 40 °C, which constrains where it can be installed.
Site ambient conditions must be checked during selection and layout.
Source
“max. ambient temperature 40 °C”
Safety
The refrigerant is R-449A with GHS classification H280 and a GWP of 1397, so refrigerant handling and leak reporting obligations apply.
Relevant for safety assessment, refrigerant regulations and service planning.
Source
“R-449A (A1, H280)”
Cumplimiento
The CO2 equivalent of the refrigerant charge is 2.7 t, which may trigger periodic leak checks under F-gas rules.
Determines whether mandatory leak inspection intervals apply to the installation.
Source
“CO2 equivalent 2,7 t”
Installation
The pump connection is G3/4 male, so mating hoses and fittings must match this thread.
Needed to specify hoses and adapters for the external circuit.
Source
“Pump connection G3/4 male”
Operation
The minimum filling capacity is 3.5 l, so the external loop and expansion volume must be planned to hold at least this amount.
Affects heat transfer fluid volume and expansion tank sizing.
Source
“min. filling capacity 3,5 l”
Performance
The circulation pump delivers 26 l/min maximum and 8 l/min at 2.0 bar, so the external circuit pressure drop must be checked against this curve.
Ensures the pump can overcome the external loop resistance at the required flow.
Source
“Delivery at 2,0 bar 8 l/min”
Safety
The unit has adjustable overtemperature protection per DIN 12876 and safety classification III/FL, which supports safe unattended operation.
Confirms the safety concept for externally closed applications.
Source
“With adjustable overtemperature protection according to DIN 12876.”
Installation
The unit is air-cooled and CFC/HCFC-free, so adequate air flow and clearance around the condenser are required.
Ventilation and space planning are needed to avoid capacity loss and overheating.
Source
“Refrigeration machine air-cooled, CFC- and HCFC-free”
Cumplimiento
The equipment is EMC class A group 1, so it is intended for industrial environments and may cause interference in residential areas.
Affects installation location and EMC compatibility with sensitive equipment nearby.
Source
“Classification (disturbance) to EN55011: Class A, Group 1”
Maintenance
The unit has a digital level indicator and an atmospheric open expansion tank, so fluid level must be monitored during operation.
Supports routine checks and prevents low-level or aeration problems.
Source
“With digital level indicator.”