Installation
The unit requires a 400 V 3~ 50 Hz supply with a maximum current of 56 A and must be protected by 3x63 A fuses.
Electrical supply and protection must be sized accordingly before installation.
Source
“Power supply requirement 400V 3~ 50Hz max. current 56 A Fuse 3x63A”
Installation
The cooling water circuit must be supplied at 5–20 °C with a differential pressure between 1 and 4 bar and a maximum pressure of 6 bar.
Cooling water supply pressure and temperature must be verified to avoid performance loss or damage.
Source
“min. cooling water differential pressure 1 bar max. cooling water differential pressure 4 bar max. cooling water pressure 6 bar”
Installation
If cooling water temperature falls below the condensation point, the cooling water pipes in the unit must be insulated.
Prevents condensation and corrosion on cold cooling water piping.
Source
“When cooling water temperatures fall below the condensation point, it is essential to insulate the cooling water pipes in the unit.”
Installation
The cooling water circuit materials include copper, stainless steel 1.4401, MS, PA, PPE, PTFE and EPDM, so only suitable cooling water may be used.
Water quality must be compatible with these materials to avoid corrosion or fouling.
Source
“Materiels used in the cooling water circuit include; copper, Stainless steel 1.4401, MS, PA, PPE, PTFE and EPDM. Please use suitable cooling water.”
Installation
Three-phase devices with current consumption less than 63 A are delivered with cable but without plug.
The installer must provide a suitable plug or hard-wired connection on site.
Source
“Three-phase devices with current consumption less than 63A --> with cable, without plug”
Safety
The equipment has a leakage current greater than 3.5 mA, which affects protective earthing and RCD selection.
Earthing and residual current protection must be designed for high leakage current.
Source
“Attention: leakage current > 3,5mA”
Cumplimiento
Voltage tolerance is ±5% only with a simultaneous frequency tolerance of ±2%, and certain combinations are not allowed.
Supply quality must be checked to stay within the permitted voltage/frequency envelope.
Source
“Voltage + / - 5% with a simultaneous frequency tolerance of + / - 2%”
Operation
The unit is designed for cooling water intake temperatures between 5 °C and 20 °C, and higher water temperatures reduce cooling power.
Cooling water temperature directly affects achievable cooling capacity.
Source
“This temperature control unit is designed to operate with cooling water intake temperature between 5°C and 20°C.”
Selection
The pump delivers 201 l/min maximum and 5.3 bar maximum pressure, with delivery dropping to 42 l/min at 5.0 bar.
Pump curve must be matched to the pressure drop of the external circuit.
Source
“max. delivery 201 l/min max. delivery pressure 5,3 bar”
Selection
Cooling power with ethanol falls from 30 kW at 0 °C to 1.5 kW at -50 °C, so low-temperature capacity is limited.
Low-temperature applications must account for strongly reduced cooling capacity.
Source
“at -50°C 1,5 kW”
Selection
The refrigerant is R-452A with GWP 2141 and a charge of 3.6 kg, giving 7.7 t CO2 equivalent.
Refrigerant charge and CO2 equivalent matter for environmental compliance and service.
Source
“Refrigerant quantity 3,6 kg CO2 equivalent 7,7 t”
Installation
The pump connection is M38x1.5 male and pipework must use ball socket per DIN 3863 and sleeve nut per DIN 3870.
Correct mating fittings must be procured for leak-free connection.
Source
“Pump connection M38x1,5 male”
Operation
The maximum permissible kinematic viscosity of the heat transfer fluid is 100 mm²/s.
Fluid selection must respect viscosity limit to avoid pump overload.
Source
“max. permissible kin. viscosity 100 mm²/s”
Installation
The unit weighs 473 kg and measures 730x804x1738 mm, requiring adequate floor space and handling equipment.
Site access, floor loading and lifting provisions must be planned.
Source
“Overall dimensions WxDxH ** 730x804x1738 mm Net weight 473 kg”