7000E/7010C Series Triple Quadrupole GC/MS Operating Manual
Sommaire
Overviewpp. 1-6
Manual introduction, where to find more information
Procedurepp. 7-12
Installing and disassembling the EI HES source and interface
Warningpp. 13-30
Safety warnings, hydrogen accumulation, symbols, moving the MS
Procedurepp. 31-99
Installing capillary and Intuvo columns, gaskets, conditioning, calibration
Procedurepp. 100-126
Pumping down, vacuum pressure, analyzer temperatures, CC gas configuration
Procedurepp. 127-147
Operating the CI MS, carbon dioxide CI, flow control module, CI autotune
Procedurepp. 148-216
Vacuum system, analyzer chambers, source removal and assembly, filaments, EM horn
Procedurepp. 217-237
Switching between EI XTR, EI HES, and CI sources
Procedurepp. 238-250
CI source maintenance and filament installation
p. 131table, 12 rows
p. 34table, 8 rows
p. 54table, 7 rows
p. 78table, 8 rows
p. 110table, 3 rows
p. 132table, 4 rows
p. 149table, 12 rows
p. 168table, 4 rows
p. 169table, 14 rows
p. 171table, 8 rows
Table 11 CI tune default settings
Parameter
Methane Positive
Methane Negative
Isobutane Positive
Isobutane Negative
Ammonia Positive
Ammonia Negative
Ion polarity
Positive
Negative
Positive
Negative
Positive
Negative
Emission
150 µA
50 µA
150 µA
50 µA
150 µA
50 µA
Electron energy
150 eV
150 eV
150 eV
150 eV
150 eV
150 eV
Filament
1
1
1
1
1
1
Repeller
3 V
3 V
3 V
3 V
3 V
3 V
Ion focus
130 V
130 V
130 V
130 V
130 V
130 V
Entrance lens offset
20 V
20 V
20 V
20 V
20 V
20 V
EM volts
1200
1400
1200
1400
1200
1400
Shutoff valve
Open
Open
Open
Open
Open
Open
Gas select
A
A
B
B
B
B
Suggested flow
20%
40%
20%
40%
20%
40%
Source temp
250 °C
150 °C
250 °C
150 °C
250 °C
150 °C
Table 3 Gas flows
Feature
Gas flows
High-vacuum pump
Split flow turbo
Optimal He column gas flow, mL/min (carrier gas)
1 to 2
Reagent gas flow, mL/min
1 to 2
CC gas flow
3 to 4
Maximum recommended gas flow, mL/min*
4 to 6
Maximum gas flow, mL/min†
6.5
Maximum column id
0.53 mm (30 m length)
JetClean option H2 flow, 0.4 mL/min
* Total gas flow into the MS = column flow + CC gas flow + reagent gas flow (if applicable) + JetClean H2 flow (if applicable). † Expect degradation of spectral performance and sensitivity.
Table 4 Gas flows
Feature
Gas flows
High-vacuum pump
Split flow turbo
Optimal He column gas flow, mL/min (carrier gas)
1 to 2
CC gas flow
3 to 4
Maximum recommended gas flow, mL/min*
4 to 6
Maximum gas flow, mL/min†
6.5
Maximum column id
0.53 mm (30 m length)
JetClean option H2 flow
0.4 mL/min
* Total gas flow into the MS = column flow + CC gas flow + JetClean H2 flow (if applicable); † Expect degradation of spectral performance and sensitivity
Table 5 Gas flows
Feature
Gas flows
High-vacuum pump
Split flow turbo
Optimal He column gas flow, mL/min (carrier gas)
1 to 2
Reagent gas flow, mL/min
1 to 2
CC gas flow
3 to 4
Maximum recommended gas flow, mL/min*
4 to 6
Maximum gas flow, mL/min†
6.5
Maximum column id
0.53 mm (30 m length)
JetClean option H2 flow, 0.4 mL/min
* Total gas flow into the MS = column flow + CC gas flow + reagent gas flow (if applicable) + JetClean H2 flow (if applicable). † Expect degradation of spectral performance and sensitivity.
Table 8 Recommended temperature settings
Zone
EI operation
MS Source
230 °C default. High limit 350 °C. Application dependent.
MS Quad 1
150 °C
MS Quad 2
150 °C
Table 11 CI tune default settings (continued)
Parameter
Methane
Isobutane
Ammonia
Front quad temp
150 °C
150 °C
150 °C
Rear quad temp
150 °C
150 °C
150 °C
Interface temp
280 °C
280 °C
280 °C
Autotune
Yes
Yes
No
Table 14 Maintenance schedule
Task
Frequency
Check the foreline pump oil level
Every week
Check the calibration vial(s)
Every 6 months
Replace the foreline pump oil*
Every 6 months
Replace dry scroll pump tip seals
Every year
Tune the MS
As needed
Check the foreline pump
As needed
Clean the ion source
As needed
Check the carrier gas trap(s) on the GC and MS
As needed
Replace the worn out parts
As needed
Lubricate side plate or vent valve O-rings†
As needed
Replace GC gas supplies
As needed
Leak check the system
As needed
* Or as needed. † Vacuum seals other than the side plate O-ring and vent valve O-ring do not need to be lubricated. Lubricating other seals can interfere with their correct function.
Table 15 Parts list for EI HES (Figure 51)
Item number
Item description
Part number
1
Source finger grip
G7002-20008
2
Filament block
G7002-20019
3
Extractor lens (5)*, with 3 mm opening
G7004-20061
4
Ceramic insulator for extractor
G7002-20064
Table 15 Parts list for EI HES (Figure 51) (continued)
Item number
Item description
Part number
5
Entrance lens assembly, Extended, HES (1)*
Gxxxx-xxxxx
6
Ion focus lens (2)*
G7004-20068
7
Lens insulator/holder
G7002-20074
8
M2 x 0.4 screw x 12 mm long gold plated screw
G7002-20083
9
Source body
G7002-20084
10
Post extractor lens 2 (3)*
G7004-20090
11
Post extractor lens 1 (4)*
G7004-20004
12
M2 x 6 mm gold plated screw
G7002-20109
13
Locking ring lens insulator
G7002-20126
14
High efficiency dual filament
G7002-60001
15
Ring heater/sensor assembly
G7002-60043
16
Source mount 1.5 mm
G7002-60053
17
Repeller assembly
G7002-60057
Not shown
HES assembly
Gxxxx-xxxxx
* The number in parenthesis is the number engraved on the lens
Table 16 Parts list for EI XTR source (Figure 52)
Item
Description
Part number
1
Setscrews
G3870-20446
2
Screws
G3870-20021
3
Source body
G3870-20440
4
Extractor lens
G3870-20444
5
Extractor lens insulator
G3870-20445
6
Filaments
G7005-60061
7
Spring washer
3050-1301
7
Flat washer
3050-0982
Engineering Facts
14 facts · every claim linked to a page
Selection
The TQ GC/MS is a standalone capillary GC detector compatible with Agilent 8890, 9000, or 7890 GCs, so the GC platform must be chosen accordingly.
Confirms GC compatibility before selecting the MS for an existing GC.
Source
“The 7000E/7010C Series TQ GC/MS is a standalone capillary GC detector for use with the Agilent 8890, 9000, or 7890 GCs.”
Selection
The mainframe weighs 59 kg (64 kg with CI) and the foreline pump adds 22.2 kg, so bench/site load capacity must be planned.
Needed for lab bench structural and handling planning during installation.
Source
“The weight is 59 kg for the turbo pump mainframe and 64 kg for the mainframe with CI. The attached foreline (roughing) pump weighs an additional 22.2 kg.”
Operation
Switching between CI and EI sources takes about 1 hour plus a 1- to 2-hour purge/bakeout, and PCI-to-NCI needs about 2 hours for source cooling.
Sets realistic method-changeover time and throughput expectations.
Source
“Switching back and forth between CI and EI sources takes about 1 hour, however, a 1- to 2-hour wait is required to purge the reagent gas lines and bake out water and other contaminants.”
Safety
Hydrogen is combustible from 4% to 74.2% by volume at atmospheric pressure, so leak testing and supply shutoff are mandatory.
Defines the explosive concentration range requiring leak checks and ventilation.
Source
“At atmospheric pressure, hydrogen is combustible at concentrations from 4% to 74.2% by volume.”
Safety
Hydrogen supply must be off until all connections are made, and inlet/detector fittings must be connected to a column or capped whenever hydrogen is supplied.
Prevents hydrogen accumulation and explosion hazard in the GC oven.
Source
“ensure that the hydrogen supply is turned off until all connections are made, and ensure that the inlet and detector column fittings are either connected to a column or capped at all times when hydrogen gas is supplied to the instrument.”
Installation
The ferrule ID must match the column ID (e.g., 0.40 mm id ferrule for 0.25 mm id columns), so correct ferrule selection is required for a leak-free interface.
Wrong ferrule size causes leaks or column damage at the GC/MS interface.
Source
“0.40 mm id, for 0.25 mm id columns (5181-3323)”
Installation
Intuvo gasket material depends on temperature: polyimide below 350 °C, nickel from 350 °C to 450 °C.
Selecting the wrong gasket material risks failure at high operating temperatures.
Source
“Intuvo gasket, nickel 5/pk, for temperatures 350 °C to 450 °C (5190-9073)”
Installation
The column must extend 4 to 6 mm past the end of the ferrule when positioned in the inlet.
Correct column protrusion is critical for proper inlet sealing and chromatography.
Source
“Position the septum under the column nut so that the column extends 4 to 6 mm past the end of the ferrule.”
Installation
Do not break the column off inside the vacuum manifold, as pieces could be pulled into the turbo pump and damage it.
Prevents costly turbo pump damage during column installation.
Source
“Do not break the column off inside the vacuum manifold. Pieces of column could fall or be pulled into the turbo pump and damage it.”
Operation
The typical GC/MS interface setpoint is 280 °C with limits of 0 °C to 400 °C, and must never exceed the column maximum.
Guides safe interface temperature setting without exceeding column limits.
Source
“The typical setpoint is 280 °C. The limits are 0 °C to 400 °C.”
Operation
During pumpdown the turbo speed should reach 80% within 10 to 15 minutes and eventually 95%, otherwise the foreline pump shuts off and the MS must be power cycled.
Provides pass/fail criteria for verifying correct pumpdown after installation.
Source
“Within 10 to 15 minutes, the turbo pump speed should be up to 80% . The pump speed should eventually reach 95%.”
Operation
After switching from EI to CI or venting, the MS must be purged and baked out at least 2 hours before tuning, with longer bakeout for optimal sensitivity.
Ensures valid CI tuning and sensitivity after source changes.
Source
“After the source is changed from EI to CI or vented for any other reason, the MS must be purged and baked out for at least 2 hours before tuning.”
Maintenance
The standard foreline pump oil trap stops only oil droplets and does not trap toxic chemicals, so toxic work requires venting exhaust outdoors or to a fume hood.
Determines exhaust routing and safety compliance when using toxic solvents.
Source
“This trap stops only pump oil droplets. It does not trap any other chemicals.”
Maintenance
For dirty ion source parts, ultrasonically clean 15 minutes each in methylene chloride, acetone, and methanol in that order; methanol alone suffices for routine cleaning.
Defines the correct cleaning sequence to avoid contaminating source parts.
Source
“For dirty parts, use all three solvents in the order shown, cleaning 15 minutes with each of the following solvents:”