Installation
The chiller requires a three-phase 400 V supply, so the site must provide a 3~ 50 Hz feed.
Determines electrical infrastructure and whether a suitable three-phase supply is available at the installation point.
Source
“Power supply (3 Phase) 400V 3~ 50Hz”
Installation
Three-phase devices drawing less than 63 A are delivered with a cable but without a plug, so the customer must provide and fit the plug.
Affects electrical installation planning and the need to procure a compatible plug/connection.
Source
“Three-phase devices with current consumption less than 63A --> with cable, without plug”
Installation
The unit is designed for cooling water inlet temperatures between 5 °C and 20 °C, so the cooling water supply must be kept within this range.
Cooling water outside this range will affect cooling performance and may require additional measures.
Source
“This temperature control unit is designed to operate with cooling water intake temperature between 5°C and 20°C.”
Installation
If cooling water temperature falls below the condensation point, the cooling water pipes in the unit must be insulated.
Prevents condensation and corrosion/electrical risk when using cold cooling water.
Source
“When cooling water temperatures fall below the condensation point, it is essential to insulate the cooling water pipes in the unit.”
Performance
Higher cooling water temperature reduces cooling power and may increase the required cooling water flow rate.
Needed to size the cooling water circuit and predict performance at the actual site conditions.
Source
“As the cooling water temperature increases, drop in the cooling power should be expected, and also an increased cooling water flow rate possible.”
Installation
The cooling water circuit contains copper, stainless steel 1.4401, MS, PA, PPE, PTFE and EPDM, so only compatible cooling water may be used.
Guides water quality and material compatibility to avoid corrosion or damage.
Source
“Materiels used in the cooling water circuit include; copper, Stainless steel 1.4401, MS, PA, PPE, PTFE and EPDM.”
Conformité
Voltage tolerance is ±5% only with simultaneous frequency tolerance of ±2%, and certain combinations are not allowed.
Ensures the supply quality is within the allowed envelope before commissioning.
Source
“Voltage + / - 5% with a simultaneous frequency tolerance of + / - 2%”
Conformité
The equipment is EMC classified as Class A, Group 1 to EN55011, which has implications for the installation environment.
Class A equipment may require specific EMC measures and is intended for non-domestic environments.
Source
“Classification (disturbance) to EN55011: Class A, Group 1”
Installation
The unit has IP20 protection, so it must be installed in a dry, protected location.
Prevents ingress of water and limits installation to indoor, dry environments.
Source
“Degree of Protection IP20”
Operation
The ambient temperature must be between 5 °C and 40 °C for operation.
Defines the allowable room conditions for reliable operation and performance.
Source
“min. ambient temperature 5 °C max. ambient temperature 40 °C”
Safety
The refrigerant is R-449A with GHS classification A1, H280, and a GWP of 1397, which affects handling and environmental compliance.
Relevant for refrigerant safety, leak detection, and environmental regulations.
Source
“R-449A (A1, H280)”
Safety
The CO2 equivalent of the refrigerant charge is 2.1 t, which may trigger periodic leak checks under F-gas regulations.
Determines regulatory obligations for leak testing and record keeping.
Source
“CO2 equivalent 2,1 t”
Installation
The pump connection is G1 1/4 male and the cooling water connection is G3/4 male, so matching fittings are required.
Ensures correct hose/pipe connections are available for installation.
Source
“Pump connection G1 1/4 male”
Installation
The minimum filling capacity is 18 l and the expansion volume is 48 l, which must be considered when preparing the system.
Needed to size the external circuit and ensure sufficient heat transfer fluid volume.
Source
“min. filling capacity 18 l”