BINDER FD 23
BINDER FD 23 — Drying ovens with Temperature 5…300 °C.
The FD 23 is a 20 L forced-convection drying and heating chamber with a 5–300 °C working range, positioned as the smallest standard model in BINDER's FD series. Unlike the larger FD 56/115/260/720 siblings, it delivers 64 air changes per hour and 0.3 K fluctuation from a 0.8 kW single-phase supply, making it suited to small-batch drying, conditioning and heat-treatment tasks where bench space and power are limited.
BINDER FD Series — Model Comparison & Selection
Full specifications
| Temperature | 5...300 °C |
| Air change rate | 64 x/h |
| Heating time to 150°C | 25 min |
| Interior volume | 20 L |
| Load per rack | 12 kg (FD023-230V / FD023UL-120V) |
| Nominal power | 0.8 kW |
| Permitted load | 25 kg (FD023-230V / FD023UL-120V) |
| Temperature fluctuation | 0.3 K |
| Temperature uniformity | 2.5 K |
| Rear wall clearance | 100 mm (FD023-230V / FD023UL-120V) |
| Side wall clearance | 50 mm (FD023-230V / FD023UL-120V) |
| Article Number mfr | 9010 |
| Recovery time after door was opened for 30 s at 150°C mfr | 6 min |
| Depth | 520 mm (FD023-230V / FD023UL-120V) |
| Height | 495 mm (FD023-230V / FD023UL-120V) |
| Interior height | 330 mm (FD023-230V / FD023UL-120V) |
| Interior width | 222 mm (FD023-230V / FD023UL-120V) |
| Width | 435 mm (FD023-230V / FD023UL-120V) |
| Net weight of the unit (empty) mfr | 27 kg |
| Power frequency | 50 Hz |
| Rated voltage | 230 V |
| Unit fuse | 10.0 A |
| Phase (Nominal voltage) mfr | 1 |
Description
Construction and series positioning
- Forced-convection (fan-assisted) chamber with 20 L interior (222 × 330 × 222 mm W×H×D) and 27 kg empty weight.
- Standard model (option model: Standard); two voltage variants: FD023-230V (230 V 1~ 50/60 Hz, CEE 7/7 plug) and FD023UL-120V (120 V 1~ 60 Hz, NEMA 5-15 plug).
- Smallest standard FD sibling; FD 56, 115, 260 and 720 offer larger volumes and start at 10–12 °C rather than 5 °C.
Thermal behaviour under load
- Working range 5–300 °C; heating to 150 °C takes 25 min; recovery after a 30 s door opening at 150 °C is 6 min.
- Temperature fluctuation 0.3 K and spatial uniformity 2.5 K define the usable working tolerance for loaded racks.
- Air-change rate 64 h⁻¹ supports solvent and moisture removal; permitted load 25 kg total, 12 kg per rack.
Installation and operation
- Rear wall clearance 100 mm and side clearance 50 mm are required for the convection path and heat dissipation.
- Electrical: 230 V / 50 Hz, 0.8 kW, 10.0 A unit fuse; single phase.
- No digitized curve points or additional manual sections were supplied; operating specifics beyond the data sheet are not documented in the provided facts.
Integration & Operating Notes
The forced-convection fan draws and discharges air at the rear; blocking the 100 mm rear gap (and 50 mm sides) restricts airflow, degrades the 2.5 K uniformity and can overheat the casing. Plan bench depth and adjacent equipment accordingly.
FD023-230V requires 230 V 1~ 50/60 Hz with CEE 7/7 plug and 10.0 A fusing; FD023UL-120V requires 120 V 1~ 60 Hz with NEMA 5-15. Connecting the wrong variant to site power will not achieve rated heating power and may damage the unit.
Exceeding the 25 kg total or 12 kg per-rack limit overloads the rack supports and alters airflow, compromising the 2.5 K uniformity specification. Distribute samples evenly and account for rack weight in the total.
Each 30 s door opening at 150 °C requires about 6 min to recover setpoint. Frequent access for sample loading or inspection will reduce effective throughput and expose heat-sensitive loads to temperature excursions; batch access to minimise openings.
The provided data sheet contains no service intervals, error codes or consumable list. Maintenance planning must rely on the full instruction manual, which was not included in the supplied documents; do not assume a schedule from this card.
Selection & Integration Q&A
Pick the FD 23 for small batches within its 20 L interior and 25 kg load, where bench space and a 0.8 kW single-phase supply are constraints. Move to FD 56/115/260/720 when larger volume or a 10–12 °C lower limit is needed; the FD 23 alone reaches 5 °C.
The 230 V variant needs 230 V 1~ 50/60 Hz with CEE 7/7 plug and 10.0 A fusing; the UL variant needs 120 V 1~ 60 Hz with NEMA 5-15. They are not interchangeable — order the variant matching site voltage and receptacle.
Base delivery covers the chamber with its standard plug; the supplied data lists no accessories, cables or consumables, and no maintenance schedule or error-code list is documented. Obtain the full instruction manual for service intervals and any replacement parts before commissioning.