VD 115 drawing
BINDER ·Made in Germany · In Active Production

BINDER VD 115

BINDER VD 115 — Drying ovens with Temperature 9…220 °C.

The BINDER VD 115 is a 119 L vacuum drying chamber with a 16 mm small-flange vacuum connection, operating from +9 to 220 °C with 0.1 K temperature fluctuation and 2.9 K uniformity. It is the largest model in the VD series, distinguished from the VD 23 and VD 56 by its 119 L interior volume and 70 kg permitted load. It is used for gentle drying of non-flammable solvents under vacuum in laboratory and production processes.

Temperature
9…220 °C

BINDER VD Series — Model Comparison & Selection

Model Temperature, °CDepth, mmHeating up time to 100 c, minHeight, cmInterior volume, LPermitted load, kg
VD 115 Current 9–22058113094.211970
VD 23 9–2204138069.82450
VD 56 9–2204618081.55560

Full specifications

Core Performance & Functional Specifications
Temperature 9...220 °C
Heating time to 100°C 130 min
Interior volume 119 L (VD115-230V)
Leak rate 0.01 bar/h
Load per rack 20 kg (VD115-230V)
Nominal power 1.6 kW
Permitted load 70 kg (VD115-230V)
Pressure fluctuation over time 1 mbar
Temperature fluctuation 0.1 K
Temperature uniformity 2.9 K
Rear wall clearance 100 mm (VD115-230V)
Side wall clearance 70 mm (VD115-230V)
Article Number mfr 9630
Pressure fluctuation over time at 400 mbar mfr 70 mbar
Dimensions, Weight & Mechanical Design
Depth 581 mm (VD115-230V)
Height 942 mm (VD115-230V)
Width 743 mm (VD115-230V)
Electrical, Power & Drive Specifications
Power frequency 50 Hz
Rated voltage 200...230 V
Unit fuse 10.0 A
Phase (Nominal voltage) mfr 1
Interfaces, Connections & Control
Vacuum connection with small flange mfr 16 mm

Description

Construction and Series Positioning

Behavior Under Load and in Different Media

Installation, Connection, Control and Operation

Integration & Operating Notes

Electrical
Verify supply voltage matches chamber variant

The VD 115 is available as a 230 V version (200...230 V, 1~, 50 Hz) or a UL 120 V version (100...120 V, 1~, 50/60 Hz). Connecting the wrong voltage will damage the chamber. Check the type plate and use the appropriate plug (CEE 7/7 or NEMA 5-15).

Data Sheet Model VD 115 en.pdf, Title page; Operating Manual VD (E3.1) 07-2025_en.pdf, chap. 25.4
Process Limits
Do not exceed 70 kg total load or 20 kg per rack

Exceeding the permitted load can deform the expansion racks or damage the chamber. Distribute the load evenly and use only the delivered expansion racks; do not mix aluminum and stainless-steel racks to avoid calibration errors.

Factory Specification Sheet, VD115-230V load data; Operating Manual VD (E3.1) 07-2025_en.pdf, chap. 25.4
Maintenance
Schedule annual maintenance and electrical safety test

Maintenance must be performed at least once a year by authorized personnel. An annual repeat electrical inspection per EN 50678/VDE 0701 and EN 50699/VDE 0702 is recommended. Replace the door gasket only when cold to avoid damage.

Operating Manual VD (E3.1) 07-2025_en.pdf, chap. 25.1 and 25.2
Control & I/O
Configure overtemperature safety controller correctly

The safety controller class 2 must be set to a value slightly above the maximum process temperature. If the alarm 'Safety controller' appears, the chamber has reached the safety limit; check set-points and heating system. Acknowledge alarms and allow cooling before restart.

Operating Manual VD (E3.1) 07-2025_en.pdf, chap. 11.2 and 25.4

Selection & Integration Q&A

When should I choose the VD 115 over the VD 56 or VD 23?

Choose the VD 115 when you need a larger interior volume (119 L) and higher permitted load (70 kg) for drying larger batches or bulky items. The VD 56 and VD 23 offer the same temperature range but smaller volumes, suitable for smaller loads or space-constrained labs.

What are the requirements for connecting a vacuum pump and inert gas supply to the VD 115?

The chamber has a 16 mm small-flange vacuum connection. Use a pump module with pump stand and connection kit (available as accessory). For inert gas, connect to the designated inlet; ensure the gas is non-flammable and compatible with the chamber materials. Ventilation after power failure is possible.

What maintenance is required and what accessories are not included in the base delivery?

Annual maintenance by authorized personnel and annual electrical safety test are required. Base delivery includes the chamber and factory calibration; not included: vacuum pump, pump module, connection kits, APT-COM 4 software, analog outputs, Pt 100 sensor, LED lighting, and expansion racks beyond the delivered set.

Dimensional Drawings & Technical Documentation

Dimensional drawings

VD 115 — drawing 1

Click drawing to inspect vector dimensions

Technical documentation

PDF
Data Sheet Model VD 115 en
Datasheet ·356,7 КБ ·8 pp.
View PDF
PDF
VD (E3.1) 07 2025 en
Manual ·10,8 МБ ·181 pp.
View PDF