Operating Instructions — vacuum pump (BA 159-EN, ed. 2.1 24.07.2023, EN)

Technical Reference Summary

Covered Models & Document Scope

Covers oil-flooded rotary vane vacuum pumps V-VCB 20 and V-VCB 25 (V Series), including the variant with gas ballast valve and optional plug connection for the motor. Document BA 159-EN, Edition 2.1, 24.07.2023.

Section-by-Section Technical Breakdown

pp. 14-15
Product Overview and Data Plate

Identifies the main components of the V-VCB pump (vacuum connection, exhaust air outlet, suction flange, cooling air inlet/outlet, oil filling point, oil sight glass, oil discharge point, oil recommendation plate, data plate, direction of rotation arrow, drive motor, motor data plate, hot surfaces >70 °C, oil separator housing). The data plate encodes model/size, serial number, year of construction, data matrix barcode, article number, speed, motor output, operating mode, pumping capacity and final pressure for 50 Hz and 60 Hz.

  • Data plate fields: 1 model/size, 2 serial number, 3 year of construction, 4 data matrix barcode, 5 article number, 6 speed 50/60 Hz, 7 motor output 50/60 Hz, 8 operating mode, 9 pumping capacity 50/60 Hz, 10 final pressure (abs.) 50/60 Hz.
  • Barcode encodes material number (MA), production order (PR) and serial number (SC).
  • Hot surfaces >70 °C are marked (Q).
pp. 15-16
Description and Fields of Application

The V-VCB has a fine micro filter on the suction side and an oil/oil-mist separator on the outlet side returning oil to the circulation. A fan between pump housing and motor provides intensive air cooling. An integrated non-return valve prevents the evacuated system from being ventilated after shutdown. The pump is driven via a coupling by a flanged single-phase or three-phase standard motor. A gas ballast valve variant prevents condensation of water vapour inside the pump at operating temperature.

  • Nominal pumping capacity with free intake: 20 m³/h (VCB 20) and 23 m³/h (VCB 25) at 50 Hz.
  • Continuous vacuum intake pressure ranges: 50 Hz: 2 to 200 mbar (abs.); 60 Hz: 2 to 150 mbar (abs.).
  • When evacuating closed systems, the volume to be evacuated must be no more than 2 % of the nominal pumping capacity.
  • Frequent switching (approx. 10 times per hour) or high ambient/inlet temperatures may exceed the excess-temperature limit of motor winding and bearings; contact manufacturer.
  • If installed in the open air, protect the unit from environmental influences (e.g. protective roof).
pp. 17
Installation Preparation and Erection

Specifies conditions for installation: free access from all sides, unobstructed ventilation grids, sufficient space for pipes and maintenance (at least 30 cm around the machine), no external vibrations, no hot exhaust air from other machines into the cooling system, good room ventilation, and accessibility of suction flange, oil filling point, oil sight glass, oil drain and oil separator housing. The machine must be set up horizontally with max. inclination 1° in all directions, secured against tipping/falling, on a plane floor able to carry its weight.

  • Maintain at least 30 cm free space around the machine for maintenance.
  • Max. inclination: 1° in all directions.
  • Cooling air inlets and outlets must be at least 15 cm from adjacent walls; cooling air must not be recirculated.
  • Ambient temperature: min. +5 °C, max. +40 °C.
  • Output reduction is noticeable when installed at more than 1000 m above sea level; contact manufacturer.
  • The non-return valve must not be removed.
pp. 18
Connection of Pipes

Covers connection of suction and exhaust piping. The exhaust air opening must not be closed or restricted; no filter may be installed on the exhaust air side; counter pressures on the exhaust side are permissible only up to +100 mbar; avoid accumulation of liquids in the exhaust line. Remove the dummy plug at the exhaust air outlet before connecting. Only screw in pipes by hand and use flexible connections if necessary.

  • Maximum permissible back pressure: +100 mbar.
  • No filter on the exhaust air side.
  • Remove blind plug on vacuum connection and dummy plug at exhaust air outlet before connecting.
  • Pumping capacity is reduced if the inlet pipe is too narrow and/or too long.
pp. 19
Motor Connection

Electrical installation must be carried out by a qualified electrician observing EN 60204. The operating company must install a main switch and a motor protection switch. Motor data must match the mains (current type, voltage, frequency, permitted current). Motors comply with DIN EN 60034, protection class IP 55 and insulation class F. Connection diagram is in the motor terminal box (not present for plug-connection version).

  • Voltage tolerance: ±5 % of nominal value unless otherwise stated on motor data plate.
  • Frequency tolerance: ±2 % unless otherwise stated on motor data plate.
  • Direction of rotation must match the arrow on the motor flange.
  • Recommended: motor protection circuit breakers with delayed switch off to accommodate temporary excess current at cold start.
pp. 20-21
Start-up and Rotation Direction Check

Before start-up, verify no transport/assembly damage, safe horizontal standing, correct and leak-tight pipe connections, tight screw and flange connections, electrical installation per diagram, adequate room ventilation, oil filled and level checked, cleaned pump and pipelines, and function of optional accessories. Check rotation direction with a phase sequence indicator (clockwise rotating field); brief start max. two seconds; looking at the motor fan it must rotate anti-clockwise. After correcting direction, run 2 minutes and top oil up to the upper edge of the sight glass, repeating until all oil pipes are filled.

  • Brief start for rotation check: max. two seconds.
  • Correct rotation: anti-clockwise when looking at the motor fan.
  • Keep a distance of 1 m from outlet and inlet connections during rotation check.
  • Filling point must not be open when the pump is running.
  • Top up oil after 2 minutes of running until all oil pipes are filled.
pp. 21
Operation and Oil Level Check

During operation the oil level must be checked daily in the sight glass. Leaks or visible oil mist in the exhaust air require immediate determination of the cause; the oil separator element must be replaced in good time and oil refilled in good time.

  • Check oil level daily.
  • If leaks occur or exhaust air contains visible oil mist, determine cause immediately.
  • Replace oil separator element in good time.
pp. 21-22
Decommissioning and Recommissioning

Decommissioning requires disconnecting from power, securing against restart, closing cut-off devices if available, depressurising by slowly opening suction and pressure lines, removing pipes and hoses, and sealing inlet/outlet stubs with blind plugs or adhesive foil. For recommissioning, check machine condition (cleanliness, cabling) and drain preserving agents.

  • Disconnect and secure against unexpected restart before decommissioning.
  • Depressurise slowly by opening suction and pressure lines.
  • Seal inlet and outlet stubs with blind plugs or adhesive foil.
  • Drain preserving agents before recommissioning.
pp. 23-30
Maintenance and Repair

Covers ensuring operational safety, maintenance table, preparation for maintenance, cleaning the vacuum pump, cleaning the air filter, lubricating oil (refilling and oil change), oil removal, motor and coupling, repair/service and spare parts. Oil viscosity must comply with ISO VG 46 as per DIN ISO 3448. The oil separator element must be changed when dirty. Coupling rubbers must be replaced when worn.

  • Oil viscosity: ISO VG 46 as per DIN ISO 3448.
  • Clean ventilation slots to maintain cooling.
  • Change oil separator element when dirty.
  • Replace worn coupling rubbers.
  • Repairs only by authorised workshops using original spare parts.
pp. 36
Technical Data

Technical data section referenced for weight, sound pressure level and other performance data. Specific values are provided in the data sheet D 159 and on the data plate.

  • Refer to chapter 10 for weight and sound pressure level.
  • Data sheet D 159 contains technical data and characteristic curves.

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
Ambient and inlet temperature must be between 5 and 40 °C. p.8 ↗ Operation outside this range requires consultation with the manufacturer; otherwise overheating or oil viscosity issues may occur. V-VCB 20 | 25
Maximum permissible back pressure on the exhaust side is +100 mbar. p.8 ↗ Exceeding this limit can cause impermissible pressure, component damage or injury; exhaust lines must be sized accordingly. V-VCB 20 | 25
Continuous vacuum intake pressure ranges: 50 Hz: 2 to 200 mbar (abs.); 60 Hz: 2 to 150 mbar (abs.). p.16 ↗ Continuous operation outside these ranges risks oil leaking through the outlet opening. V-VCB 20 | 25
Nominal pumping capacity with free intake: 20 m³/h (VCB 20) and 23 m³/h (VCB 25) at 50 Hz. p.16 ↗ Used for sizing; actual capacity depends on intake pressure per data sheet D 159. V-VCB 20 and V-VCB 25 respectively
When evacuating closed systems, the volume to be evacuated must be no more than 2 % of the nominal pumping capacity. p.16 ↗ Larger volumes require a different pump or method to avoid oil leakage and overheating. V-VCB 20 | 25
Max. inclination during operation: 1° in all directions. p.17 ↗ The machine must be set up horizontally; otherwise lubrication and operation may be impaired. V-VCB 20 | 25
Cooling air inlets and outlets must be at least 15 cm away from adjacent walls. p.17 ↗ Ensures sufficient cooling air flow; otherwise overheating and reduced performance may occur. V-VCB 20 | 25
For maintenance, provide a space of at least 30 cm around the machine. p.17 ↗ Allows access to oil filling point, sight glass, oil drain and separator housing. V-VCB 20 | 25
Motor voltage tolerance: ±5 % of nominal value; frequency tolerance: ±2 % unless otherwise stated on motor data plate. p.19 ↗ Mains conditions must be within these tolerances to avoid loss of power or damage. V-VCB 20 | 25
Motors comply with DIN EN 60034, protection class IP 55 and insulation class F. p.19 ↗ Suitable for indoor industrial environments; for outdoor installation, additional protection (e.g. protective roof) is required. V-VCB 20 | 25
Correct direction of rotation: anti-clockwise when looking at the motor fan; check with phase sequence indicator (clockwise rotating field). p.21 ↗ Wrong rotation can cause injury and machine damage; brief start max. two seconds for check. V-VCB 20 | 25
Oil viscosity must comply with ISO VG 46 as per DIN ISO 3448. p.26 ↗ Using incorrect oil viscosity can cause overheating, insufficient pumping capacity or final pressure issues. V-VCB 20 | 25
Check oil level daily in the sight glass. p.21 ↗ Low oil level can damage the pump; leaks or visible oil mist require immediate action. V-VCB 20 | 25
Storage temperature: -10 °C to +60 °C; relative air humidity max. 80 %; storage in dry, dust-free, vibration-free place protected from sun radiation; close openings air-tight. p.13 ↗ Improper storage can damage the machine; for long-term storage (>3 months) use preservation oil. V-VCB 20 | 25
The machine must not be stored for more than 6 months. p.13 ↗ Longer storage requires special measures; see Info I 150. V-VCB 20 | 25
Output reduction is noticeable when installed at more than 1000 m above sea level. p.17 ↗ Contact manufacturer for high-altitude installations. V-VCB 20 | 25
No filter may be installed on the exhaust air side. p.18 ↗ A filter would increase back pressure and may cause impermissible pressure or damage. V-VCB 20 | 25
The non-return valve must not be removed. p.17 ↗ Removing it would allow the evacuated system to ventilate after shutdown. V-VCB 20 | 25
If the machine has been idle for more than two minutes, the connected pipe should be ventilated to atmospheric pressure. p.15 ↗ Prevents oil backflow or other issues after shutdown. V-VCB 20 | 25
Frequent switching at approx. 10 times per hour or higher ambient/inlet temperatures may exceed the excess-temperature limit of motor winding and bearings. p.16 ↗ Contact manufacturer for such operating conditions. V-VCB 20 | 25

Faults & Troubleshooting

Code / Symptom Possible Cause Remedy Note
Machine is switched off by the motor protection switch p.32 ↗ Mains voltage/ Frequency does not correspond with the motor data Check by qualified electrician Chapter 5.5
Machine is switched off by the motor protection switch p.32 ↗ Connection to motor terminal board is not correct Check by qualified electrician Chapter 5.5
Machine is switched off by the motor protection switch p.32 ↗ Motor protection switch is not set correctly Check by qualified electrician Chapter 5.5
Machine is switched off by the motor protection switch p.32 ↗ Motor protection switch is triggered too quickly Use a motor protection switch with an overload-dependent delayed switch off that takes into consideration the short term excess current at start up (version with short circuit and overload trigger as per IEC 60947-4-1)
Machine is switched off by the motor protection switch p.32 ↗ Vacuum pump or its oil is too cold Note the ambient temperature and the inlet temperature Chapter 2.4
Machine is switched off by the motor protection switch p.32 ↗ The lubricating oil is too viscous The oil viscosity must comply with ISO VG 46 as per DIN ISO 3448 Chapter 7.6
Machine is switched off by the motor protection switch p.32 ↗ The oil separator element is dirty. Change the oil separator element Chapter 7.7
Machine is switched off by the motor protection switch p.32 ↗ The back pressure in the exhaust line is too high Check the hose and/or the pipe Chapter 5.3
Pumping capacity is insufficient p.32 ↗ The inlet pipe is too long or too narrow Check the hose and/or the pipe Chapter 5.3
Pumping capacity is insufficient p.32 ↗ Leak on the inlet side of the vacuum pump or in the system Check the pipework and screw connections for leaks and check for tight fit Chapter 7.2
Pumping capacity is insufficient p.32 ↗ The intake filter is dirty Clean or replace the intake filter Chapter 7.5
Final pressure (max. vacuum) is not reached p.33 ↗ Leak on the inlet side of the vacuum pump or in the system Check the pipework and screw connections for leaks and check for tight fit Chapter 7.2
Final pressure (max. vacuum) is not reached p.33 ↗ Incorrect oil viscosity The oil viscosity must comply with ISO VG 46 as per DIN ISO 3448 Chapter 7.6
Machine gets too hot p.33 ↗ Ambient or inlet temperatures too high Ensure proper use Chapter 2.4
Machine gets too hot p.33 ↗ Cooling air supply is obstructed Check ambient conditions Chapter 5.1
Machine gets too hot p.33 ↗ Cooling air supply is obstructed Clean ventilation slots Chapter 7.4
Machine gets too hot p.33 ↗ The lubricating oil is too viscous The oil viscosity must comply with ISO VG 46 as per DIN ISO 3448 Chapter 7.6
Machine gets too hot p.33 ↗ The oil separator element is dirty. Change the oil separator element Chapter 7.7
Machine gets too hot p.33 ↗ The back pressure in the exhaust line is too high Check the hose and/or the pipe Chapter 5.3
Exhaust air contains visible oil mist p.33 ↗ The oil separator element is not inserted correctly. Check that it is correctly seated Chapter 7.7
Exhaust air contains visible oil mist p.33 ↗ Unsuitable oil is being used Use suitable types Chapter 7.6
Exhaust air contains visible oil mist p.33 ↗ The oil separator element is dirty Change the oil separator element Chapter 7.7
Exhaust air contains visible oil mist p.33 ↗ Ambient or inlet temperatures too high Ensure proper use Chapter 2.4
Exhaust air contains visible oil mist p.33 ↗ Cooling air supply is obstructed Check ambient conditions Chapter 5.1
Exhaust air contains visible oil mist p.33 ↗ Cooling air supply is obstructed Clean ventilation slots Chapter 7.2
The machine makes a strange noise (The blades making a hammering noise when starting from cold is normal if it disappears within two minutes as the operating te p.33 ↗ The coupling rubbers worn out Replace the coupling rubbers Chapter 7.8.2
The machine makes a strange noise (The blades making a hammering noise when starting from cold is normal if it disappears within two minutes as the operating te p.33 ↗ The pump housing is worn (chatter marks) Repair by manufacturer or authorised workshop Elmo Rietschle Service
The machine makes a strange noise (The blades making a hammering noise when starting from cold is normal if it disappears within two minutes as the operating te p.33 ↗ The vacuum adjustment valve (if available) is vibrating Replace the valve Chapter 7.10
The machine makes a strange noise (The blades making a hammering noise when starting from cold is normal if it disappears within two minutes as the operating te p.33 ↗ The blades are damaged Repair by manufacturer or authorised workshop Elmo Rietschle Service
The machine makes a strange noise (The blades making a hammering noise when starting from cold is normal if it disappears within two minutes as the operating te p.33 ↗ Vacuum pump or its oil is too cold Note the ambient temperature and the inlet temperature Chapter 2.4
The machine makes a strange noise (The blades making a hammering noise when starting from cold is normal if it disappears within two minutes as the operating te p.33 ↗ The lubricating oil is too viscous The oil viscosity must comply with ISO VG 46 as per DIN ISO 3448 Chapter 7.6
Water in lubricating oil p.34 ↗ Pump sucks in water Install water interceptor upstream of the pump —
Water in lubricating oil p.34 ↗ The pump sucks in more water vapour than is suitable for its water vapour compatibility Contact the manufacturer for increased gas ballast Elmo Rietschle Service
Water in lubricating oil p.34 ↗ Pump only works for a short time and therefore does not reach its normal operating temperature Let the pump continue to run with a closed suction side after extracting the water vapour until the water has evaporated from the oil —