The chiller is rated for an operating temperature range of -20 to 100 °C, so it must be matched to the process temperature window.
Defines whether the unit can cover the required process temperatures before selection.
Source
“Operating temperature range
-20...100 °C”
Performance
Cooling capacity falls from 23 kW at 20 °C to 5.5 kW at -20 °C, so sizing must use the capacity at the actual operating temperature.
Prevents oversizing or undersizing when the process runs at low temperature.
Source
“at 20°C
23 kW
at 0°C
13,5 kW
at -10°C
9 kW
at -20°C
5,5 kW”
Installation
The unit requires a 460 V three-phase 60 Hz supply, which must be confirmed at the installation site.
Electrical supply mismatch will prevent commissioning.
Source
“Power supply (3 Phase)
460V 3~ 60Hz”
Installation
Voltage and frequency tolerances are linked: -5% voltage with +2% frequency is not allowed, so supply quality must be checked.
Avoids operating the compressor and pump outside the permitted supply envelope.
Source
“-5% voltage and +2% frequency -> not allowed!”
Compliance
External branch circuit protection according to UL 489 is required, so the panel must include a suitable UL 489 breaker.
Needed for a compliant and safe electrical installation.
Source
“External branch circuit protection according to UL 489 required.”
Installation
Three-phase devices below 63 A are delivered with cable but without plug, so the site must provide the connection means.
Affects planning of the electrical connection and required hardware.
Source
“Three-phase devices with current consumption less than 63A --> with cable, without plug”
Installation
The unit has IP20 protection, so it must be installed in a dry indoor location protected from water and dust ingress.
Determines the acceptable environment and enclosure requirements at the installation site.
Source
“Degree of Protection
IP20”
Operation
Ambient temperature must stay between 5 °C and 40 °C, and cooling capacity may drop above 20 °C.
Room conditions directly affect available cooling performance and must be considered in layout.
Source
“If the ambient temperature rises, the cooling capacity may drop.”
Installation
The unit is air-cooled and requires respect of space requirements, so clearance for air flow must be planned.
Insufficient clearance reduces cooling performance and can cause overheating.
Source
“Please respect space requirements.”
Safety
The refrigerant is R-449A with GHS hazard H280, so leak detection and ventilation provisions are needed.
Affects site safety assessment and handling procedures for the refrigerant.
Source
“R-449A (A1, H280)”
Compliance
The refrigerant charge corresponds to 2.1 t CO2 equivalent, which may trigger refrigerant regulations and record keeping.
Determines whether F-gas or equivalent reporting and leak-check obligations apply.
Source
“CO2 equivalent
2,1 t”
Installation
The pump connection is G1 1/4 male, so mating hoses and couplings must match this thread.
Prevents mismatch of process piping and accessories during installation.
Source
“Pump connection
G1 1/4 male”
Operation
The minimum filling capacity is 18 l and expansion volume is 48 l, so the external loop volume must be considered.
Ensures the system has adequate heat transfer fluid and expansion space.
Source
“min. filling capacity
18 l
Volume of expansion
48 l”
Selection
The unit is intended for externally closed applications, so the process loop must be closed.
Using it on an open loop would be outside the intended application.
Source
“For externally closed applications.”