HiPace 30 Neo — instruction manual with tc 80

Technical Reference Summary

Covered Models & Document Scope

Operating instructions (EN, translation of original, 64 pages) for the Pfeiffer Vacuum HiPace 30 Neo turbopump with integrated electronic drive unit TC 80. Covers three variants: DN 63 ISO-K, DN 63 CF-F, and DN 40 ISO-KF high vacuum flange. Applicable companion document: operating instructions 'electronic drive unit TC 80 standard' (PT 0659 BN). Nominal speed 90000 1/min (1500 Hz), mass 2.0 kg, IP54/Type 12, 24 V supply.

Section-by-Section Technical Breakdown

pp. 18-19
Product description

The turbopump is a compact unit with the TC 80 electronic drive unit; Pfeiffer power supply packs (TPS) provide the voltage. Cooling is convection (standard) or optional air cooling; the rotor uses a hybrid bearing: wear-free permanent magnetic bearing on the HV side, ball bearing with ceramic balls lubricated by an operating fluid reservoir on the fore-vacuum side.

  • Hybrid bearing: permanent magnetic (HV side) / ceramic-ball ball bearing (fore-vacuum side) with operating fluid reservoir
  • Two AccessLink sockets for direct connection of Pfeiffer accessories; multifunction X3 (15-pole D-Sub); LED operating mode display
  • HV flange variants: DN 63 ISO-K (aluminium), DN 63 CF-F (stainless steel), DN 40 ISO-KF (aluminium)
  • Fore-vacuum connection: 1/4" thread with sealing plug; venting screw on housing
  • Scope of delivery: pump with TC 80, protective caps (HV and fore-vacuum), AccessLink sealing plugs, operating instructions
pp. 21-32
Installation

Mechanical installation must always precede electrical connection. Fastening to the mounting plate uses 4× M5 screws, strength class ≥ 8.8, 6 Nm ± 10%, into a plate ≥ 2 mm thick with tensile strength > 270 MPa. Detailed flange procedures are given for ISO-KF (clamping ring, 3.7 Nm), ISO-K (bracket screws, 5/15/25 ± 2 Nm in 3 steps), ISO-K onto ISO-F (claws 5/10/16 ± 1 Nm), and CF-F connections.

  • Fastening: 4× M5, ≥ 8.8 strength, washer DIN EN ISO 7090/7092, screw-in depth ≥ 1.3 × d, torque 6 Nm ± 10%
  • Counter flange flatness ± 0.05 mm; burst torque 470 Nm (ISO 27892); max axial load on HV flange 200 N (20 kg), no one-sided load
  • Flange material tensile strength: 170 N/mm² at 2.5×d or 270 N/mm² at 1.5×d engagement depth
  • Splinter shield DN 63 reduces N2 pumping speed by ~15% (DN 40: 17%); protective screen DN 63 only ~4%
  • All orientations allowed with dry compressing backing pumps; with oil-sealed pumps keep fore-vacuum connection pointing down (± 25°) and avoid oil backflow
  • ISO-KF clamping ring screws: 3.7 Nm; ISO-K bracket screws cross-wise in 3 steps (5, 15, 25 ± 2 Nm); ISO-K claws (5, 10, 16 ± 1 Nm)
  • Use calibrated torque wrench, tightening factor ≤ 1.6; only Pfeiffer-approved mounting kits
  • Vibration compensator only vertical, only after consulting Pfeiffer Vacuum, with additional HV flange securing
  • Maximum rotor temperature 110 °C; max bakeout temperature at HV flange 120 °C
pp. 33-38
Operation

Covers commissioning, operating modes (stand-alone without operating unit, via X3 multifunction connection, via Pfeiffer control unit, via field bus), switching on, operation monitoring via LEDs and temperature monitoring, and switching off/venting including delayed venting factory settings.

  • Factory settings table for the electronic drive unit applies at delivery (Tbl. 8)
  • LED behavior/meanings on the TC 80 documented (Tbl. 9); temperature monitoring reduces drive power then shuts off on over-temperature
  • Delayed venting factory settings defined (Tbl. 10)
  • Mating plugs enable automatic run-up at power-on — only connect after mechanical installation
  • Do not fully unscrew the venting screw during venting
pp. 39-44
Maintenance

General maintenance information, inspection/maintenance interval checklist, replacement of the operating fluid reservoir (removal/assembly procedures), replacement of the electronic drive unit, and confirmation of the nominal speed specification (characteristic nominal speeds in Tbl. 12).

  • Maintenance intervals defined in Tbl. 11
  • Operating fluid reservoir can be replaced at customer maintenance level; observe fluid safety data sheet and decontamination requirements
  • Electronic drive unit replacement procedure with speed confirmation (nominal speeds in Tbl. 12)
pp. 45-46
Decommissioning, Recycling and Disposal

Shutting down for longer periods and recommissioning procedures, plus general disposal information and turbopump-specific disposal (recycling) requirements.

  • Separate procedures for long-term shutdown vs. recommissioning
  • Disposal per general recycling regulations; decontaminate toxic-contaminated parts before disposal
pp. 47-55
Malfunctions, Service, Spare Parts and Accessories

Troubleshooting table (Tbl. 13) for turbopump malfunctions, Pfeiffer Vacuum service solutions, spare parts overview for HiPace 30 Neo (Tbl. 14, Fig. 17), and accessory ordering information with the accessories table (Tbl. 15).

  • Troubleshooting table for fault diagnosis and rectification
  • Spare parts and accessories only as listed in these instructions — use of unlisted parts counts as improper use
pp. 56-63
Technical Data and Dimensions

Technical data for HiPace 30 Neo | 24 V (Tbl. 18), substances in contact with process media (Tbl. 19), unit conversion tables, and dimension drawings for the three flange variants (DN 63 ISO-K, DN 63 CF-F, DN 40 ISO-KF). Includes EC and UK Declarations of Conformity.

  • Supply voltage 24 V (TPS power supply pack)
  • Pressure unit and gas throughput conversion tables provided
  • Dimension drawings for all three HV flange variants

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
Nominal rotor speed is 90,000 min⁻¹ (1500 Hz); pump mass 2.0 kg; protection degree IP54 / Type 12 per UL 50E; protection class III, overvoltage category II. p.8 ↗ Small, lightweight pump — mounting structures can be minimal, but overvoltage category II and class III dictate 24 V SELV-style supply and protective earthing practice. whole series
Permissible ambient temperature: 5–30 °C with convection cooling without gas throughput, 5–35 °C with air cooling; rel. humidity max 80 % at T < 31 °C, 50 % at T < 40 °C; altitude max 5000 m; air pressure 530–1060 hPa. p.15 ↗ Higher ambient temperatures require reduced backing pressure/gas throughput or air cooling; de-rate for high-altitude or hot installations. whole series
Maximum permissible inlet pressure on suction side, venting and sealing gas connection: 1500 hPa absolute. p.12 ↗ Never admit process over-pressure above 1500 hPa abs or the pump will be destroyed with ejected-fragment risk. whole series
Maximum bakeout temperature at the high vacuum flange: 120 °C; maximum permissible rotor temperature 110 °C. p.15 ↗ Limit system bakeout to ≤ 120 °C at the HV flange; the drive reduces power then shuts off if rotor exceeds 110 °C. whole series
Fastening to mounting plate: 4× M5 screws, strength class ≥ 8.8, galvanized, screw-in depth ≥ 1.3 × d, tightening torque 6 Nm ± 10 %, plate min. 2 mm thick with tensile strength > 270 MPa. p.22 ↗ Undersized plate or wrong torque compromises burst-safety anchoring per ISO 27892; remove anti-vibration buffers before bolting down. HiPace 30 Neo (shared table with HiPace 30/60/80 families)
Theoretical burst torque (rotor shaft breakage per ISO 27892): 470 Nm; maximum permissible axial load on HV flange: 200 N (20 kg), one-sided load not permitted; counter flange flatness ± 0.05 mm. p.23 ↗ Counter flange design and system anchoring must absorb 470 Nm in a rotor-jam event; keep superstructure weight ≤ 20 kg and uniformly distributed. whole series
Counter flange material tensile strength requirement: 170 N/mm² at 2.5×d screw engagement depth, 270 N/mm² at 1.5×d. p.23 ↗ Verify flange material and screw engagement before machining customer-side counter flanges. whole series
ISO-KF clamping ring screws: 3.7 Nm; ISO-K bracket screws cross-wise in 3 steps 5/15/25 ± 2 Nm; ISO-K claws in 3 stages 5/10/16 ± 1 Nm. p.25 ↗ Use a calibrated torque wrench (tightening factor ≤ 1.6) and the staged sequences to avoid flange stress and leaks. DN 63 ISO-K and DN 40 ISO-KF variants
Splinter shield reduces pumping speed (N2): DN 40 ≈ 17 %, DN 63 ≈ 15 %; protective screen DN 63 ≈ 4 % (H2 reductions 6/3/1 %). p.24 ↗ Include this pumping-speed loss when sizing the pump for particle-sensitive processes. all flange variants (ISO/CF)
All mounting orientations are permitted when using dry compressing backing pumps; with oil-sealed backing pumps the fore-vacuum connection must point vertically downward, deviation max ± 25°. p.25 ↗ Prevents oil backflow into the turbopump; support tubing so no piping forces act on the pump. whole series
Rotor bearing: wear-free permanent magnetic bearing on the HV side, ball bearing with ceramic balls on the fore-vacuum side, lubricated by a replaceable operating fluid reservoir. p.18 ↗ Maintenance centers on periodic replacement of the operating fluid reservoir; pump is magnetically levitated at the HV side (no wear there). whole series
Cooling: convection (standard) or optional air cooling; at excess temperature the electronic drive unit automatically reduces drive output and then switches off. p.15 ↗ No water cooling needed; ensure convection clearance or fit the air-cooling accessory for hotter environments. whole series
Power supply pack must meet double-isolation requirements per IEC 61010-1 / IEC 60950-1 / IEC 62368-1; supply is 24 V; a mains disconnection device per SEMI-S2 and a circuit breaker with ≥ 10,000 A interruption rating must be installed (pump has no mains switch). p.11 ↗ Specify an approved TPS supply and external disconnect/breaker in the system electrical design. whole series
Surfaces can exceed 70 °C during operation; keep lines/cables away from surfaces > 70 °C and provide touch protection where access is unrestricted. p.12 ↗ Plan guarding and cable routing accordingly; allow cool-down before any service work. whole series
Product is approved only for dry, inert gases in closed indoor areas (weatherproof locations); explosive, corrosive, condensing, fluid or dusty media are improper use. p.15 ↗ Do not select this pump for corrosive/process-wet applications (no 'C' corrosive version covered here). whole series
Control/communication interfaces: multifunction X3 15-pole D-Sub socket, two AccessLink accessory sockets, LED status display; operation possible without operating unit, via Pfeiffer control unit or via field bus; parameters addressed as [P:xxx]. p.9 ↗ Integrate via X3/field bus for remote control; AccessLink allows direct accessory hookup without extra cabling. whole series with TC 80 drive
Vibration compensator use: only with vertical passage, only after consulting Pfeiffer Vacuum, with additional securing of the pump to the HV flange — rotor jam torque per ISO 27892 will likely shear the pump off otherwise. p.24 ↗ For vibration-sensitive systems, design on-site torque compensation before approving a vibration compensator. whole series
Delayed venting factory settings are preconfigured (Tbl. 10); venting is via the venting screw which must not be fully unscrewed during manual venting. p.37 ↗ Use the factory delayed-venting behavior for power-fail protection; follow the screw-in restriction to avoid vacuum-contact injuries. whole series