Induztr
Engineering Digest Document Viewer Related Models

Operating Instructions — C-DLR 301 ATEX compressor (BA 887-21-DE, DE)

Technical Reference Summary

Covered Models & Document Scope

This operating manual (BA 887-21-DE, edition 1.6.2016) covers the ATEX variant of the C-DLR 301 / 501 two-shaft claw compressor for operation in explosive atmospheres according to Directive 2014/34/EU. It applies to both sizes C-DLR 301 and C-DLR 501; size-specific data are given in the technical data table (e.g. 301: 15.0 kW, 290 m³/h, 332 kg; 501: 576 kg). The document references separate data sheets D 887 (C-DLR 301) and D 888 (C-DLR 501), spare parts lists E 887 / E 888, and the ATEX certificate.

Section-by-Section Technical Breakdown

pp. 12-13
Design and Function

The C-DLR 301/501 is a two-shaft rotary claw compressor with non-contacting, dry-running claw rotors synchronized by a gear pair. Gears and motor-side bearings are oil-lubricated in a gearbox that also holds the oil supply; gearbox and compression chamber are separated by special seals. The compressor is enclosed by a sound-insulating hood and cooled by a drum fan drawing fresh cooling air between compressor and hood. Drive is via a coupling from a flanged standard three-phase motor; a safety valve is fitted as standard.

  • Two-shaft rotary claw principle, non-contacting and dry-running rotors
  • Gear pair synchronizes the counter-rotating claw rotors
  • Gearbox contains oil supply for gears and motor-side bearings
  • Gearbox and compression chamber separated by special seals; shaft seals and O-rings to atmosphere, piston rings on compression side
  • Sound-insulating hood with drum fan for cooling air between compressor and hood
  • Flanged standard three-phase motor connected via coupling
  • Safety valve fitted as standard for overload protection
pp. 7
Intended Use and ATEX Limits

The compressor fulfils Directive 2014/34/EU and is suitable for drawing in explosive atmosphere from Zone 2 and may be operated in Zone 1 or Zone 2. It may only handle non-aggressive, non-toxic dry gases and gas-air mixtures, with humidity permitted but no liquids. Pressure/temperature classes define maximum permissible overpressure and temperature class depending on mains frequency or inverter operation.

  • Suitable for drawing in explosive atmosphere from Zone 2; operation in Zone 1 or Zone 2
  • Ambient and intake temperature +5 to +40 °C; consult manufacturer outside this range
  • Intake pressure: atmospheric pressure ±80 mbar
  • Maximum overpressure 2.0 bar must not be exceeded
  • Media: all non-aggressive and non-toxic dry gases and gas-air mixtures; humidity allowed, no liquids
  • 50/60 Hz, T4: max. permissible overpressure +0.8 bar, max. setting 130 °C
  • 50/60 Hz, T3: max. permissible overpressure +1.8 bar, max. setting 195 °C
  • 50/60 Hz, T2: max. permissible overpressure +2.0 bar, max. setting 210 °C
  • Inverter operation 25...60 Hz, T2: max. permissible overpressure +2.0 bar, max. setting 210 °C
  • Compressor and all associated parts must be included in equipotential bonding
  • Leakage rate at delivery must not exceed 0.06 mbar·l/s; operator must ensure ventilation so that leakage does not change the ATEX zone outside the compressor
pp. 14
Installation

Installation requires free access from all sides, unobstructed ventilation openings, and sufficient space for piping and maintenance. Cooling air inlet and outlet must have at least 30 cm clearance to adjacent walls, and at least 40 cm must be provided in front of the suction flange for maintenance. The machine may only be operated in horizontal mounting position and must not be operated without sheet-metal covers.

  • Machine freely accessible from all sides; do not close ventilation grilles or openings
  • No external vibration; do not draw in hot exhaust air from other machines
  • Cooling air inlet/outlet at least 30 cm from adjacent walls; exhaust cooling air must not be re-drawn
  • At least 40 cm clearance in front of suction flange for maintenance
  • Only horizontal mounting position permitted
  • Do not operate C-DLR 301/501 without sheet-metal covers
  • Substrate even and level; load-bearing capacity sized for machine weight
  • Installation on solid ground possible without anchoring; on a substructure, elastic buffer elements recommended
  • Above 1000 m above sea level a power reduction is noticeable; consult manufacturer
  • Oil fill point, oil sight glasses and oil drains must be easily accessible
pp. 15
Piping Connections

A compensator is recommended on both suction and discharge sides. No vertical exhaust lines may be installed on the discharge side due to risk of condensation. An external inlet screen with an effective filter unit of approx. 0.05 mm must be installed on the suction side to prevent foreign bodies from being drawn in.

  • Install compensator on suction and discharge side
  • No vertical exhaust lines on discharge side (condensation risk)
  • External inlet screen with effective filter unit approx. 0.05 mm on suction side
  • Pipes only hand-tightened; excessive forces and torques damage the unit
  • Too narrow and/or too long discharge line reduces volume flow
  • For connection lines longer than 3 m (same pipe cross-section as machine connection), check valves (ZRK) recommended to prevent reverse running after shutdown
pp. 15
Safety Valve

A safety valve is fitted as standard to protect against overload. Operation without the standard safety valve is not permitted; exceeding the permissible final compression pressure can damage the machine. The safety valve is a wear part and must be checked after 10,000 h or at the latest after 1 year, only with the compressor depressurized.

  • Safety valve fitted as standard (Fig. 2/D)
  • Do not operate without the standard safety valve
  • Exceeding permissible final compression pressure (see nameplate) can damage the machine
  • Safety valve is a wear part; check after 10,000 h or at latest after 1 year
  • Check only with compressor depressurized
pp. 16
Oil Filling

Lubricating oil for gears and bearings is filled at the oil fill point up to the middle of the sight glasses, then the fill point is closed. Suitable oil types are specified in the maintenance section.

  • Fill lubricating oil at oil fill point (Fig. 3/H) up to the middle of the sight glasses (Fig. 3/I)
  • Close oil fill point after filling
  • Suitable oil types see maintenance section
pp. 16
Motor Connection

Electrical installation must be performed only by a qualified electrician in accordance with EN 60204; the main switch must be provided by the operator. Motors correspond to DIN EN 60034, protection class IP 55 and insulation class F. Motor data must be compared with the supply network; without power reduction, ±5% voltage deviation and ±2% frequency deviation are permissible.

  • Electrical installation only by qualified electrician according to EN 60204
  • Main switch to be provided by operator
  • Motors according to DIN EN 60034, IP 55, insulation class F
  • Connection diagram in motor terminal box (not applicable with plug connection)
  • Compare motor data with mains: current type, voltage, frequency, permissible current
  • Motor protection switch and cable gland for strain relief required
  • Time-delayed motor protection switches recommended because short-term overcurrent can occur on cold start
  • Without power reduction: ±5% voltage deviation, ±2% frequency deviation
pp. 17-18
Commissioning

Before commissioning, clean compressor and piping of dust and foreign matter, remove welding residue and splinters, check that all suction and blow-off connections are tight and pipes well supported, and top up oil to the middle of the sight glass if necessary. The direction of rotation must be checked: when viewed from the motor fan, it must rotate counter-clockwise; a phase sequence indicator is recommended.

  • Clean compressor and piping of dust and foreign matter
  • Remove welding residue and splinters from piping
  • Check all suction and blow-off connections for tightness and good pipe support
  • Top up oil to middle of sight glass if necessary
  • Check direction of rotation: viewed from motor fan, must rotate counter-clockwise
  • Brief motor start for direction check max. two seconds
  • Use phase sequence indicator (clockwise phase sequence) to check direction
  • Longer reverse running can damage the machine
  • Machine may only be switched on again after standstill
pp. 19-20
Maintenance

Regular maintenance is required to ensure operational safety; intervals depend on load. Monthly tasks include checking piping and screw connections for leaks and tightness, checking terminal box and cable entries for leaks, cleaning safety valve, ventilation slots and motor cooling fins, and checking oil level. The safety valve must be replaced after 10,000 h; oil change annually or at latest after 5,000 h.

  • Monthly: check piping and screw connections for leaks and tight seat; re-seal/retighten if necessary
  • Monthly: check terminal box and cable entry openings for leaks; re-seal if necessary
  • Monthly: clean safety valve, ventilation slots and motor cooling fins
  • 10,000 h: replace safety valve
  • Monthly: check oil level
  • Annually or at latest after 5,000 h: oil change
  • Oil change with machine at operating temperature and vented to atmosphere
  • Oil viscosity ISO-VG 150 according to DIN 51519; designation DIN 51502: CLP HC 150
  • Recommended oil: GEAR-LUBE 150 or equivalent
  • Oil change after 20,000 operating hours under clean operation
  • When changing oil type, completely drain oil chamber
pp. 21
Inspection and Overhaul

After 10,000 / 20,000 operating hours, at latest after 2 years, the compressor must be inspected/overhauled by authorized personnel only (Gardner Denver or Gardner Denver-authorized personnel). After 10,000 h a leak test according to test instruction I 880 / 1.8.2008 must be performed; if leak rate is within defined limits, operation may continue with the condition that the ambient atmosphere is monitored with a gas detector at the oil fill point. After 17,500 h or at latest after 2 years, an overhaul at the manufacturer's works is required.

  • Inspection/overhaul after 10,000 / 20,000 operating hours, at latest after 2 years
  • Only authorized personnel (Gardner Denver or authorized) may perform inspection/overhaul
  • After 10,000 h: leak test according to I 880 / 1.8.2008
  • If leak rate within limits: continued operation only with gas monitoring at oil fill point (H)
  • If leak rate exceeded: inspection at manufacturer's works (replacement of wear and sealing parts); operation only permitted after inspection
  • Revision after 17,500 h or at latest after 2 years at manufacturer's works (replacement of wear and sealing parts); operation only permitted after revision
pp. 23
Spare Parts

Spare parts are ordered according to spare parts list E 887 for C-DLR 301 and E 888 for C-DLR 501. Wear parts and seals are separately identified in the list. Only original spare parts or manufacturer-approved parts may be used.

  • Spare parts list E 887 for C-DLR 301
  • Spare parts list E 888 for C-DLR 501
  • Wear parts and seals separately identified in the list
  • Use only original spare parts or manufacturer-approved parts
  • Use of other parts can cause malfunction and void liability/warranty
pp. 26
Technical Data

Technical data for C-DLR 301 and 501 include sound pressure level, sound power level, weight, dimensions, pressure connection, and oil fill quantity. Further technical data are given in data sheets D 887 and D 888.

  • Sound pressure level (max.) EN ISO 3744, tolerance ±3 dB(A): 301 at 50 Hz 81 dB(A), at 60 Hz 83 dB(A); 501 at 50 Hz 86 dB(A), at 60 Hz 87 dB(A)
  • Sound power level: 301 at 50 Hz 101 dB(A); 501 at 60 Hz 102 dB(A)
  • Weight: 301 332 kg; 501 576 kg
  • Length: 301 1229 mm; 501 1359 mm
  • Width: 301 635 mm; 501 747 mm
  • Height: 301 771 mm; 501 1128 mm
  • Pressure connection: 301 G 2; 501 G 3
  • Oil fill quantity: 301 1.5 l; 501 1.85 l
  • Length and weight may vary depending on motor make

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
Ambient and intake temperature must be between +5 and +40 °C. p.7 ↗ Operation outside this range requires consultation with the manufacturer; ensure installation environment stays within limits. C-DLR 301 / 501 ATEX
Intake pressure: atmospheric pressure ±80 mbar. p.7 ↗ Suction-side pressure must remain near atmospheric; verify system pressure before connection. C-DLR 301 / 501 ATEX
Maximum overpressure 2.0 bar must not be exceeded. p.7 ↗ Select safety valve and system design for max. 2.0 bar; exceeding can damage the machine. C-DLR 301 / 501 ATEX
Pressure/temperature classes: 50/60 Hz T4 max. +0.8 bar / 130 °C; T3 max. +1.8 bar / 195 °C; T2 max. +2.0 bar / 210 °C; inverter 25...60 Hz T2 max. +2.0 bar / 210 °C. p.7 ↗ Select temperature class and overpressure limit according to process temperature and drive type. C-DLR 301 / 501 ATEX
Leakage rate at delivery must not exceed 0.06 mbar·l/s. p.7 ↗ Acceptance criterion for leak test; operator must ensure ventilation so leakage does not alter ATEX zone outside compressor. C-DLR 301 / 501 ATEX
Cooling air inlet and outlet must have at least 30 cm clearance to adjacent walls; at least 40 cm in front of suction flange for maintenance. p.14 ↗ Plan installation layout with these minimum clearances to ensure cooling and service access. C-DLR 301 / 501 ATEX
External inlet screen with effective filter unit approx. 0.05 mm required on suction side. p.15 ↗ Install suitable suction filter to prevent foreign bodies from entering the compressor. C-DLR 301 / 501 ATEX
For connection lines longer than 3 m (same pipe cross-section as machine connection), check valves (ZRK) are recommended. p.15 ↗ Prevents reverse running after shutdown when long piping is used. C-DLR 301 / 501 ATEX
Motors: IP 55, insulation class F, according to DIN EN 60034; permissible without power reduction: ±5% voltage deviation, ±2% frequency deviation. p.16 ↗ Verify supply quality; use time-delayed motor protection switch due to cold-start overcurrent. C-DLR 301 / 501 ATEX
Direction of rotation: viewed from motor fan, must rotate counter-clockwise; brief start max. 2 seconds for check. p.18 ↗ Use phase sequence indicator; longer reverse running can damage the machine. C-DLR 301 / 501 ATEX
Safety valve must be checked after 10,000 h or at latest after 1 year, only with compressor depressurized. p.15 ↗ Include safety valve inspection in maintenance schedule; replace after 10,000 h. C-DLR 301 / 501 ATEX
Oil viscosity ISO-VG 150 according to DIN 51519; designation DIN 51502: CLP HC 150; recommended GEAR-LUBE 150. p.20 ↗ Use only specified oil or equivalent; oil change annually or at latest after 5,000 h. C-DLR 301 / 501 ATEX
Oil fill quantity: C-DLR 301 1.5 l; C-DLR 501 1.85 l. p.26 ↗ Fill to middle of sight glass; use correct quantity for each size. C-DLR 301 and C-DLR 501
Inspection after 10,000 h: leak test according to I 880 / 1.8.2008; if leak rate within limits, continued operation only with gas monitoring at oil fill point. p.21 ↗ Plan gas detector installation if continued operation after 10,000 h is intended. C-DLR 301 / 501 ATEX
Revision after 17,500 h or at latest after 2 years at manufacturer's works. p.21 ↗ Schedule factory overhaul; operation only permitted after revision. C-DLR 301 / 501 ATEX
Sound pressure level (max.) EN ISO 3744, tolerance ±3 dB(A): C-DLR 301 81 dB(A) at 50 Hz, 83 dB(A) at 60 Hz; C-DLR 501 86 dB(A) at 50 Hz, 87 dB(A) at 60 Hz. p.26 ↗ Use hearing protection for prolonged stay near running machine. C-DLR 301 and C-DLR 501
Pressure connection: C-DLR 301 G 2; C-DLR 501 G 3. p.26 ↗ Size discharge piping accordingly. C-DLR 301 and C-DLR 501
Weight: C-DLR 301 332 kg; C-DLR 501 576 kg. Length: 301 1229 mm; 501 1359 mm. Width: 301 635 mm; 501 747 mm. Height: 301 771 mm; 501 1128 mm. p.26 ↗ Plan lifting equipment and installation space accordingly; length and weight may vary with motor make. C-DLR 301 and C-DLR 501
Storage conditions: relative humidity 0% to 80%, temperature -20 °C to +70 °C, dust-free and vibration-free; avoid storage longer than 6 months. p.11 ↗ Comply with storage environment to prevent damage before installation. C-DLR 301 / 501 ATEX
Above 1000 m above sea level a power reduction is noticeable; consult manufacturer. p.14 ↗ For high-altitude installations, check motor and compressor performance with manufacturer. C-DLR 301 / 501 ATEX

Faults & Troubleshooting

Code / Symptom Possible Cause Remedy Note
Maschine wird durch Motorschutzschalter abgeschaltet p.24 ↗ Netzspannung/ Frequenz stimmt nicht mit den Motordaten überein Überprüfung durch Elektrofachkraft Kapitel 5.5
Maschine wird durch Motorschutzschalter abgeschaltet p.24 ↗ Anschluss am Motorklemmbrett ist nicht korrekt Überprüfung durch Elektrofachkraft Kapitel 5.5
Maschine wird durch Motorschutzschalter abgeschaltet p.24 ↗ Motorschutzschalter ist nicht korrekt eingestellt Überprüfung durch Elektrofachkraft Kapitel 5.5
Maschine wird durch Motorschutzschalter abgeschaltet p.24 ↗ Motorschutzschalter löst zu rasch aus Verwendung eines Motorschutzschalters mit überlastabhängiger Abschaltverzögerung, die den kurzzeitigen Überstrom beim Start berücksichtigt (Ausführung mit Kurzschluss- und Überlastauslöser nach VDE 0660 Teil 2 bzw. IEC 947-4)
Maschine wird durch Motorschutzschalter abgeschaltet p.24 ↗ Das Sicherheitsventil ist verschmutzt, so dass der zulässige Druck überschritten wird Sicherheitsventil reinigen / erneuern Kapitel 7.2, Kapitel 7.4
Blasleistung ist ungenügend p.24 ↗ Ansaugfilter ist verschmutzt Ansaugfilter reinigen / erneuern Kapitel 7.2.2, Kapitel 7.4
Blasleistung ist ungenügend p.24 ↗ Druckleitung ist zu lang oder zu eng Schlauch- bzw. Rohrleitung überprüfen Kapitel 5.3
Blasleistung ist ungenügend p.24 ↗ Undichtigkeit an der Maschine oder im System Verrohrung und Verschraubungen auf Undichtigkeiten und festen Sitz prüfen Kapitel 7.2
Enddruck (max. Überdruck) wird nicht erreicht p.25 ↗ Undichtigkeit an der Maschine oder im System Verrohrung und Verschraubungen auf Undichtigkeiten und festen Sitz prüfen Kapitel 7.2
Enddruck (max. Überdruck) wird nicht erreicht p.25 ↗ Antriebsleistung wurde zu klein gewählt Nächst größere Motorleistung verwenden Datenblatt D 887
Maschine wird zu heiß p.25 ↗ Umgebungs- oder Ansaugtemperatur ist zu hoch Bestimmungsgemäße Verwendung beachten Kapitel 2.3
Maschine wird zu heiß p.25 ↗ Kühlluftstrom wird behindert Umgebungsbedingungen prüfen Kapitel 5.1
Maschine wird zu heiß p.25 ↗ Kühlluftstrom wird behindert Lüftungsschlitze reinigen Kapitel 7.2
Maschine wird zu heiß p.25 ↗ Das Sicherheitsventil ist verschmutzt, so dass der zulässige Druck überschritten wird Sicherheitsventil reinigen / erneuern Kapitel 7.2, Kapitel 7.4
Maschine erzeugt abnormales Geräusch p.25 ↗ Ablagerungen auf den Drehkolben Arbeitsraum und die Drehkolben reinigen Elmo Rietschle Service
Maschine erzeugt abnormales Geräusch p.25 ↗ Das Sicherheitsentil flattert Ventil ersetzen Kapitel 7.4