Waters Driver Pack 2018 Release 1 Version 1.71 Certificate of Structural Integrity
Technical Reference Summary
Covered Models & Document Scope
This document is a Certificate of Structural Integrity for the Waters Driver Pack 2018, Release 1, version/build 1.71, product number 716005102, revision A, dated March 28, 2018. It covers the software/firmware driver pack as shipped and does not describe hardware models, options, or ordering codes.
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Product number 716005102, revision A, dated March 28, 2018. p.1 ↗ | Identifies the exact driver pack release for traceability and compatibility checks. | Waters Driver Pack 2018 Release 1 v1.71 |
| Version/build number is 1.71. p.1 ↗ | Use to confirm the installed driver pack version matches the validated release. | Waters Driver Pack 2018 Release 1 |
| Certificate number 667005779. p.1 ↗ | Reference for cGXP documentation requests and audit traceability. | Waters Driver Pack 2018 Release 1 v1.71 |
| The product was developed, evaluated, and approved according to the Waters Corporation Product Development process, with milestones reviewed and approved by management. p.1 ↗ | Supports use in regulated environments where a documented development process is required. | Waters Driver Pack 2018 Release 1 v1.71 |
| The product was found suitable for the customers, markets, and intended usage identified at the time of shipment. p.1 ↗ | Suitability is limited to the intended usage defined at shipment; deviations require separate assessment. | Waters Driver Pack 2018 Release 1 v1.71 |
| For cGXP requirements, the following documents are available for inspection at Waters Corporation: Design Inputs, Acceptance Criteria, Design Outputs, Evaluation Testing - Verification and Validation. p.1 ↗ | These documents can be requested for regulatory audits; plan for a non-disclosure agreement. | Waters Driver Pack 2018 Release 1 v1.71 |
| Access to the documentation requires a non-disclosure agreement to be provided by those wanting access. p.1 ↗ | Budget time for NDA execution before an audit or inspection. | Waters Driver Pack 2018 Release 1 v1.71 |
| Waters Corporation will maintain the documentation on-site or at a secure off-site location. p.1 ↗ | Document retention is handled by Waters; request copies or inspection access as needed. | Waters Driver Pack 2018 Release 1 v1.71 |