Nabertherm F 110
Nabertherm ·Made in Germany · In Active Production

Nabertherm F 110

Nabertherm F 110 — Fusing furnaces.

The F 110 is a top-loading fusing furnace with a 930 × 590 × 230 mm chamber and 950 °C maximum temperature, positioned above the F 30 and F 75 siblings in the series. Its 7.5 kW three-phase connection and 110 kg construction suit glass fusing and similar processes requiring a wide, shallow heated volume.

Nabertherm Top Loader as Fusing Furnaces | Nabertherm Series — Model Comparison & Selection

Model Electrical connectionWeight, kgMax temperature, °C
F 110 Current 3-phase110950
F 30 1-phase55950
F 75 3-phase95950

Full specifications

Core Performance & Functional Specifications
Electrical connection 3-phase
Nominal power 7.5 kW
Floor space mfr 0.47
Inner dimensions (W × D × H) mfr 930 × 590 × 230 mm
Outer dimensions (W × D × H) mfr 1130 × 1000 × 690 mm
Dimensions, Weight & Mechanical Design
Weight 110 kg
Operating Conditions, Environment & Protection
Max temperature 950 °C

Description

Construction and series positioning

Thermal behavior and limits

Electrical and control integration

Integration & Operating Notes

Electrical
Confirm phase voltage and current before sizing the supply

The verified data state only '3-phase' and 7.5 kW; phase voltage, full-load current and recommended breaker size are not given. The installing engineer must read the nameplate and the wiring diagram supplied with the unit, because a 7.5 kW load at 400 V and at 230 V three-phase draws very different currents and cable sizes.

Factory Specification Sheet
Mounting
Allow floor area of 0.47 m² plus access clearance

The footprint is 0.47 m² with outer dimensions of 1130 × 1000 × 690 mm. Because the unit is a top loader, the lid opens upward; overhead clearance and free access to all four sides must be reserved for loading and for service, in addition to the stated floor space.

Factory Specification Sheet
Process Limits
Do not exceed 950 °C chamber temperature

The maximum temperature is 950 °C. Exceeding it risks damage to the heating elements and insulation; process recipes and controller setpoints must be limited to this value, and any over-temperature protection should be set below it.

Factory Specification Sheet
Control & I/O
Controller and recorder functions are documented separately

The process-control document covers the series 500 controllers and the MyNabertherm app, including process-data storage and temperature-uniformity instrumentation. The F 110 itself is not listed in that document, so the controller variant, interface and recorder options must be specified per order and checked against the delivered wiring.

Prozesssteuerung englisch

Selection & Integration Q&A

When should I choose the F 110 rather than the smaller F 30 or F 75 in the same series?

Choose the F 110 when the workload needs the larger 930 × 590 × 230 mm chamber; the F 30 and F 75 offer smaller chambers. All three share the 950 °C class, so the decision is driven by part size and batch volume, not by temperature.

What supply and protection does the 7.5 kW three-phase connection require?

The unit is a 3-phase, 7.5 kW load, but the verified data do not state phase voltage or full-load current. Size the cable, breaker and isolator from the nameplate and wiring diagram supplied with the furnace, not from the power rating alone.

What is included in base delivery and what must be ordered separately?

The verified facts list only the furnace itself: no controller, recorder, thermocouple, cable or process-data software is confirmed as included. The series 500 controller and MyNabertherm app are described in a separate document and must be specified as options with the order.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
Prozesssteuerung englisch
Brochure ·2,8 МБ ·20 pp.
View PDF
PDF
Fiber optics glass english 0
Brochure ·10,3 МБ ·97 pp.
View PDF
PDF
Foundry english
Brochure ·4,2 МБ ·52 pp.
View PDF
PDF
Dental english
Brochure ·13,1 МБ ·72 pp.
View PDF