Nabertherm F 75
Nabertherm ·Made in Germany · In Active Production

Nabertherm F 75

Nabertherm F 75 — Fusing furnaces.

The F 75 is a top-loading fusing furnace with a 750 × 520 × 230 mm chamber and 950 °C maximum temperature, positioned between the F 30 and F 110 in the series. Its 5.5 kW three-phase connection and 95 kg weight suit bench or floor installation where batch fusing of glass or similar materials is required.

Nabertherm Top Loader as Fusing Furnaces | Nabertherm Series — Model Comparison & Selection

Model Electrical connectionWeight, kgMax temperature, °C
F 75 Current 3-phase95950
F 110 3-phase110950
F 30 1-phase55950

Full specifications

Core Performance & Functional Specifications
Electrical connection 3-phase
Nominal power 5.5 kW
Floor space mfr 0.33
Inner dimensions (W × D × H) mfr 750 × 520 × 230 mm
Outer dimensions (W × D × H) mfr 945 × 930 × 690 mm
Dimensions, Weight & Mechanical Design
Weight 95 kg
Operating Conditions, Environment & Protection
Max temperature 950 °C

Description

Construction and series positioning

Behavior and process role

Control and documentation context

Integration & Operating Notes

Electrical
Three-phase supply must be sized for 5.5 kW nominal power

The furnace is specified for a three-phase electrical connection with 5.5 kW nominal power. The upstream protection, cable cross-section, and disconnect must be selected for this load; no single-phase option is stated in the verified facts, so a three-phase feed is mandatory.

Factory Specification Sheet
Mounting
Allow 0.33 m² floor space and access to the top opening

The 945 × 930 × 690 mm outer envelope and 0.33 m² floor space define the footprint. Because the unit is a top loader, clearance above the chamber must be reserved for loading and for the lid or lift mechanism; the verified facts do not state side or rear clearances, so these must be confirmed against the installation manual.

Factory Specification Sheet
Process Limits
Do not exceed 950 °C chamber temperature

The maximum temperature is 950 °C. Operating above this limit risks damage to the heating elements and chamber insulation. The controller setpoint and over-temperature protection must be configured so that the 950 °C ceiling is never exceeded during fusing cycles.

Factory Specification Sheet

Selection & Integration Q&A

When should I choose the F 75 rather than the F 30 or F 110 in this fusing furnace series?

Choose the F 75 when the batch footprint needs the 750 × 520 mm chamber but the load height stays under 230 mm. The F 30 is smaller; the F 110 is larger. The F 75 sits between them in chamber area and power, so select it when the F 30 is too small and the F 110 would be underloaded.

What electrical supply and protection does the F 75 require from the facility?

The F 75 is a three-phase unit rated 5.5 kW. The facility must provide a three-phase feed sized for this load, with upstream protection and cable cross-section selected accordingly. No single-phase variant is stated in the verified facts, so a three-phase supply is required.

What maintenance and accessories are required for the F 75 beyond the base unit?

The verified facts do not list maintenance intervals, consumables, or included accessories for the F 75. The controller documentation describes optional recorder and process-data functions but does not assign them to this model. Maintenance schedule and accessory scope must be confirmed from the furnace manual and order documentation.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
Prozesssteuerung englisch
Brochure ·2,8 МБ ·20 pp.
View PDF
PDF
Fiber optics glass english 0
Brochure ·10,3 МБ ·97 pp.
View PDF
PDF
Foundry english
Brochure ·4,2 МБ ·52 pp.
View PDF
PDF
Dental english
Brochure ·13,1 МБ ·72 pp.
View PDF