Operating Instructions — VSI 100 (BA 832-EN, EN)
Technical Reference Summary
Covered Models & Document Scope
This document covers the screw vacuum pumps S-VSI 100 (01), S-VSI 300 (01) and S-VSI 300 (12). The S-VSI 300 (12) variant includes a gas ballast valve. Standard cooling is continuous flow water cooling; circulation cooling is available as an option.
Section-by-Section Technical Breakdown
Describes the design of the S-VSI screw vacuum pump, including the double-shaft screw rotor principle, oil-lubricated gearbox and bearings, and the separation of gearbox and compression chamber. It lists the connection and component positions for the S-VSI 100 and S-VSI 300 (12) variants and explains the data plate. It also defines the areas of application and the two cooling concepts.
- Two parallel screw rotors roll off against each other without touching and dry; gas is enclosed and compressed toward the outlet.
- Synchronous gearbox gear wheels and bearings are oil-lubricated; oil conveying devices supply them at all permissible speeds.
- Gearbox and compression chamber are separated by special seals; an atmospherically ventilated area between them can be loaded with sealing gas (special version).
- S-VSI 100 connections: vacuum connection A, exhaust air outlet B, cooling water inlet C G 3/8, cooling water outlet D G 3/8, cooling water drain D1, oil filling points H/H1, oil sight glasses I/I1, oil discharge points K/K1.
- S-VSI 300 (12) additionally has a gas ballast valve U; cooling water connections are shown without thread size in the figure.
- Data plate includes type/size, serial number, year of construction, item no., final pressure (abs.), pumping capacity, speed, motor output and operating mode.
- Intake pressure range for continuous vacuum: 0.1 to 1000 mbar (abs.).
- Maximum pumping capacity with free suction is 110 m3/h and 320 m3/h at 50 Hz.
- S-VSI 300 (12) may only be operated in continuous operation S1.
- When evacuating closed systems the volume to be evacuated must be max. 80 l.
- Standard continuous flow cooling: water flows through the cavity in the double-walled compressor housing; optional assembly group includes temperature control set to Tmax = 50 °C, safety valve > 6 bar, flow control device set to 400 l/h, solenoid valve 24 V DC and dirt trap.
- Circulation cooling option: thermostat-controlled three-way valves, temperature and flow switch, tank capacity 30 l, weight/operating weight 101/131 kg.
Covers preparation for installation, mechanical installation, pipe connections, cooling water connection, oil filling and motor connection. It specifies clearance requirements, permissible outlet counter pressures, cooling water quality and limits, oil fill level, and electrical supply tolerances.
- Machine must be freely accessible from all sides; ventilation grids and holes must not be closed.
- Cooling air inlets and outlets must be at least 30 cm away from adjacent walls; cooling air coming out must not be sucked in again.
- Machine may only be operated when set up horizontally; foundation must be level, straight and able to take the machine weight.
- Above 1000 m above sea level a reduction in power is noticeable; contact manufacturer.
- Only screw pipes in by hand; suction pipe too narrow and/or too long reduces pumping capacity.
- With connection pipes of the same cross-section as the machine connection and more than 3 m long, a non-return valve (ZRK) must be installed.
- Air vent must not be closed or restricted; prevent liquids accumulating in the exhaust line.
- Permissible outlet counter pressures: S-VSI (01)-(07) < +0.2 bar; S-VSI (12) < +30 mbar.
- Vacuum pump must not be operated without cooling water control; cooling water stream must not be interrupted.
- Only pH-neutral, clean and filtered water for cooling; cooling water operating pressure must not exceed 6 bar; cooling water temperature 15-50 °C.
- Rinse customer pipe network before connecting; install a filter element to prevent foreign bodies entering the heat exchanger.
- Mix cooling water with at least 10% anti-freeze to prevent frost damage.
- Fill lubricating oil up to the middle of the inspection glasses at oil filling points H and H1.
- Electrical installation only by a specialist electrician observing EN 60204; operating company must provide the main switch.
- Motors comply with DIN EN 60034, protection class IP 55, insulation class F.
- Without derating: ±5% voltage deviation and ±2% frequency deviation permissible.
Describes commissioning checks including rotation direction, safety notes for hot surfaces and noise, and the procedure for stopping, decommissioning, storing and re-commissioning the pump.
- Surface temperatures on marked components may exceed 70 °C; avoid touching hot surfaces.
- Use ear protectors when spending a long time near the running machine.
- Do not put hands onto the suction connection to check suction.
- Do not operate without water cooling with a sufficient amount of cooling water.
- Check rotation direction by briefly starting the motor (max. two seconds); when looking at the motor fan it must rotate clockwise.
- Use a phase sequence indicator to check the direction of rotation (anti-clockwise rotating field).
- Decommissioning: switch off, close cut-off devices if available, disconnect from electricity, depressurise by opening pipes slowly, remove pipes and hoses, seal connections with adhesive foil, discharge cooling water at D1.
- Re-commissioning: check condition of machine (cleanliness, cabling etc.) and follow installation and commissioning sections.
Provides the maintenance schedule, oil change procedure and oil specification, air filter and gas ballast filter cleaning, coupling inspection, cooling system maintenance, repair/service requirements and spare parts ordering information.
- Monthly: check pipes and screws for leaks and proper seating; check cooling water system and pipes; check terminal box and cable inlet holes for leaks; clean cooling ribs of machine and motor; check oil level.
- Every 7,500 h: change oil.
- Depending on dirtiness of discharged medium: clean intake air filter and gas ballast valve filter.
- At least once a year: check coupling for wear.
- Depending on dirtiness of cooling liquid: clean dirt trap.
- Change oil when machine is at operating temperature and in an atmospherically ventilated area; if not completely emptied the refill amount is reduced.
- Oil viscosity must comply with ISO VG 150 as per DIN 51519; designation as per DIN 51502: CLP HC 150; GEAR-LUBE 150 or equivalent.
- Oil quantities: S-VSI 100 = 1.65 l (1.0 l at H + 0.65 l at H1); S-VSI 300 = 1.9 l (1.1 l at H + 0.8 l at H1).
- Mesh filter in vacuum connection must be cleaned by washing or blowing out, or replaced.
- Gas ballast valve filter (S-VSI (12)): filter disc and micro filter discs cleaned by purging; remove countersunk screw and plastic cover to access.
- Coupling sprocket subject to wear; check at least once a year; defective sprockets may lead to rotor shaft breaking.
- Frequent starting up and high ambient temperature reduce service life of the coupling sprocket.
- Continuous flow cooling dirt trap must be cleaned periodically depending on cooling liquid quality.
- For repairs use manufacturer, branch offices or authorised dealers; a signed declaration of harmlessness must be enclosed for each machine sent to service.
- Spare parts lists: E 832/1 for S-VSI 100 (01), E 832/2 for S-VSI 300 (01), E 832/3 for S-VSI 300 (11).
Lists sound pressure and sound power levels, weights, dimensions, vacuum connection sizes, oil quantities, cooling water consumption and cooling water pressure for the S-VSI 100, 300 (01) and 300 (12).
- Sound pressure level at 50 Hz: S-VSI 100 = 72 dB(A), S-VSI 300 (01) = 74 dB(A), S-VSI 300 (12) = 74 dB(A); tolerance ±3 dB(A).
- Sound pressure level at 60 Hz: S-VSI 100 = 75 dB(A), S-VSI 300 (01) = 78 dB(A), S-VSI 300 (12) = 76 dB(A).
- Sound power level at 50 Hz: S-VSI 300 (01) = 94 dB(A); at 60 Hz = 97 dB(A).
- Weight: S-VSI 100 = 190 kg, S-VSI 300 (01) = 308 kg, S-VSI 300 (12) = 300 kg.
- Length: S-VSI 100 = 1082 mm, S-VSI 300 (01) = 1442 mm, S-VSI 300 (12) = 1323 mm.
- Width: S-VSI 100 = 543 mm, S-VSI 300 (01) = 671 mm, S-VSI 300 (12) = 431 mm.
- Height: S-VSI 100 = 404 mm, S-VSI 300 (01) = 442 mm, S-VSI 300 (12) = 562 mm.
- Vacuum connection: S-VSI 100 = G 1 1/2; S-VSI 300 = G 2 1/2.
- Cooling water consumption at max. intake temperature 50 °C: S-VSI 100 = 1.8 l/min; S-VSI 300 = 6.7 l/min.
- Cooling water pressure: max. 6 bar.
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Ambient and suction temperature must be between 5 and 40 °C. p.7 ↗ | Operation outside this range requires consultation with the manufacturer. | S-VSI 100 (01), S-VSI 300 (01), S-VSI 300 (12) |
| Permissible outlet counter pressures: S-VSI (01)-(07) < +0.2 bar; S-VSI (12) < +30 mbar. p.7 ↗ | Exhaust piping and silencers must be sized so that these limits are not exceeded. | S-VSI (01) and S-VSI (12) variants |
| Intake pressure range for continuous vacuum: 0.1 to 1000 mbar (abs.). p.15 ↗ | The pump is suitable for closed-system evacuation or continuous vacuum within this range. | S-VSI series |
| Maximum pumping capacity with free suction is 110 m3/h and 320 m3/h at 50 Hz. p.15 ↗ | Use data sheet D 832 for pumping capacity dependence on intake pressure. | S-VSI 100 and S-VSI 300 respectively |
| S-VSI 300 (12) may only be operated in continuous operation S1. p.15 ↗ | Do not apply intermittent duty to this variant. | S-VSI 300 (12) |
| When evacuating closed systems the volume to be evacuated must be max. 80 l. p.15 ↗ | Larger volumes require a different evacuation strategy or consultation. | S-VSI series |
| Cooling air inlets and outlets must be at least 30 cm away from adjacent walls. p.18 ↗ | Maintain clearance to ensure adequate cooling and avoid recirculation of hot air. | S-VSI series |
| With connection pipes of the same cross-section as the machine connection and more than 3 m long, a non-return valve (ZRK) must be installed. p.19 ↗ | Prevents reverse operation when the machine has stopped. | S-VSI series |
| Cooling water operating pressure must not exceed 6 bar; cooling water temperature must be between 15 and 50 °C. p.20 ↗ | Install pressure regulation or safety valve if supply pressure can exceed 6 bar. | S-VSI series |
| Mix cooling water with at least 10% anti-freeze to prevent frost damage. p.21 ↗ | Required where freezing conditions can occur; adjust amount to ambient climatic conditions. | S-VSI series |
| Without derating, ±5% voltage deviation and ±2% frequency deviation are permissible. p.22 ↗ | Verify mains supply matches motor data plate before connection. | S-VSI series |
| Oil viscosity must comply with ISO VG 150 as per DIN 51519; designation CLP HC 150; GEAR-LUBE 150 or equivalent. p.27 ↗ | Use only specified oil; if changing oil type, empty the oil tank completely. | S-VSI series |
| Oil change interval: every 7,500 operating hours with clean operations. p.26 ↗ | Plan maintenance accordingly; check oil level monthly. | S-VSI series |
| Correct oil quantities: S-VSI 100 = 1.65 l (1.0 l at H + 0.65 l at H1); S-VSI 300 = 1.9 l (1.1 l at H + 0.8 l at H1). p.35 ↗ | Fill to the middle of the inspection glasses; do not overfill. | S-VSI 100 and S-VSI 300 respectively |
| Cooling water consumption at max. intake temperature 50 °C: S-VSI 100 = 1.8 l/min; S-VSI 300 = 6.7 l/min. p.35 ↗ | Size cooling water supply and return lines accordingly. | S-VSI 100 and S-VSI 300 respectively |
| Optional continuous flow cooling assembly: temperature control factory-set to Tmax = 50 °C; flow control device factory-set to 400 l/h; solenoid valve control voltage 24 V DC; safety valve protects against cooling water pressure > 6 bar. p.16 ↗ | Use these setpoints when commissioning the optional cooling assembly. | S-VSI series with continuous flow cooling option |
| Circulation cooling option: tank capacity 30 l; weight/operating weight 101/131 kg; cooling water inlet/outlet G 3/4. p.17 ↗ | Account for additional weight and space when selecting the installation location. | S-VSI series with circulation cooling option |
| Vacuum connection sizes: S-VSI 100 = G 1 1/2; S-VSI 300 = G 2 1/2. p.35 ↗ | Select mating pipe fittings accordingly; only screw pipes in by hand. | S-VSI 100 and S-VSI 300 respectively |
| Sound pressure level at 50 Hz: S-VSI 100 = 72 dB(A), S-VSI 300 (01) = 74 dB(A), S-VSI 300 (12) = 74 dB(A); tolerance ±3 dB(A). p.35 ↗ | Use ear protection when spending long periods near the running machine. | S-VSI series |
| When installed at more than 1000 m above sea level a reduction in power is noticeable. p.18 ↗ | Contact manufacturer for high-altitude applications. | S-VSI series |
Faults & Troubleshooting
| Code / Symptom | Possible Cause | Remedy | Note |
|---|---|---|---|
| Machine is switched off by the motor protection switch p.33 ↗ | Mains voltage/ Frequency does not correspond with the motor data | Check by qualified electrician | Section 5.5 |
| Machine is switched off by the motor protection switch p.33 ↗ | Connection to motor terminal board is not correct | Check by qualified electrician | Section 5.5 |
| Machine is switched off by the motor protection switch p.33 ↗ | Motor protection switch is not set correctly | Check by qualified electrician | Section 5.5 |
| Machine is switched off by the motor protection switch p.33 ↗ | Motor protection switch is triggered too quickly | Use a motor protection switch with an overload-dependent delayed switch off that takes into consideration the short term excess current at start up (version with short circuit and overload trigger as per VDE 0660 Part 2 or IEC 947-4) | |
| Pumping capacity is insufficient p.33 ↗ | The mesh filter is dirty | Clean or replace the mesh filter | Section 7.2.2, Section 7.4 |
| Pumping capacity is insufficient p.33 ↗ | The suction pipe is too long or too narrow | Check the hose or the pipe | Section 5.3 |
| Pumping capacity is insufficient p.33 ↗ | Machine or system leaking | Check the pipework and screw connections for leaks and to ensure that they are firmly seated | Section 7.2 |
| Final pressure (max. vacuum) is not reached p.34 ↗ | Machine or system leaking | Check the pipework and screw connections for leaks and to ensure that they are firmly seated | Section 7.2 |
| Final pressure (max. vacuum) is not reached p.34 ↗ | Too little cooling water | Note cooling water consumption | Section 9 |
| Final pressure (max. vacuum) is not reached p.34 ↗ | The mesh filter is dirty | Clean or replace the mesh filter | Section 7.2.2, Section 7.4 |
| Machine gets too hot p.34 ↗ | Ambient or intake temperature is too high | Ensure it is being used properly | Section 2.3 |
| Machine gets too hot p.34 ↗ | Cooling air supply is obstructed | Check environmental conditions | Section 5.1 |
| Machine gets too hot p.34 ↗ | Cooling air supply is obstructed | Clean the cooling ribs | Section 7.2 |
| Machine gets too hot p.34 ↗ | The cooling water system is obstructed | Check the cooling water system and the pipes | Section 7.2 |
| Machine gets too hot p.34 ↗ | Too little cooling water | Note cooling water consumption | Section 9 |
| Machine gets too hot p.34 ↗ | Cooling water inflow is too hot | Note the max. intake temperature | Section 9 |
| The machine makes a abnormal noise p.34 ↗ | Deposits on the rotors | Clean the working space and the rotors | Elmo Rietschle Service |