Agilent Technologies 7000E GC/TQ
Agilent Technologies ·Made in USA · In Active Production

Agilent Technologies 7000E GC/TQ

Agilent Technologies 7000E GC/TQ — Gas chromatography mass spectrometry gc ms with Pumping speed 6×10⁻⁵ m³/h.

The 7000E GC/TQ is a triple quadrupole GC/MS/MS system built around an 8890, Intuvo 9000, or 7890 GC and an EI/CI-capable MS/MS analyzer with a 15 m × 0.25 mm × 0.25 µm first column and mid-column backflush. It targets 10-minute, 203-compound pesticide screens at 3–100 ppb with 70–120% recovery and ≤20% RSD, and sits between the single-quad 5977C and the higher-end 7010D/Q-TOF siblings.

Pumping speed
6×10⁻⁵ m³/h

Agilent Technologies GC MS Instruments Series — Model Comparison & Selection

Model Pumping speed, m³/hCarrier gasTransfer line temperature, °CSample volume, milliliterIon source temperature, °CAnalysis time, min
7000E GC/TQ Current 6×10⁻⁵Helium3000.00228010
5977C GC/MSD 1Hydrogen2303×10⁻⁴2307.5
7010D GCMS —Helium3000.002280—
Quadrupole Time-of-Flight GC/MS, Mass Screening GC/Q-TOF —1.5280———

Full specifications

Core Performance & Functional Specifications
Pumping speed 1 mL/min
Analysis time 10 min
Carrier gas Helium
Collision Gas (nitrogen) 1.5 mL/min
Column 1 Diameter 0.25 mm
Column 1 Film Thickness 0.25 µm
Column 1 Flow 1.016 ml/min
Column 2 Diameter 0.25 mm
Column 2 Flow 1.216 ml/min
Column Film Thickness 0.25 µm
Drying time five to six minutes
Electron Energy 70 eV
Extraction Solvent Volume 10 ml
Gain 10 decibel
High Vacuum Pressure 1.11 Torr
Maximum Column Id 0.53 mm
Oven Ramp 1 Rate 80 °C/min
Oven Ramp Rate 2 35 °C/min
Purge Flow To Split Vent 50 mL/min
Quench Gas (helium) 2.25 mL/min
Rough Vacuum 1.58 mTorr
Sample volume 1.5 µL
Septum Purge Flow 3 ml/min
Switching Time 4.9 min
Total Run Time 10 min
Number of target pesticides mfr 197
Analytical system mfr 3 GC/MSD
Sample matrix mfr 1 ratio
Recovery criterion mfr 70...120
Precision criterion (RSD) mfr 20
Quantification limit range mfr 3...100 ppb
MRM database size mfr 1100 compounds
MRMs per compound mfr 10 MRMs
Carrier gas and flow rate mfr 1 flow
Tune mfr Etune: atunes.eiex.tune.xml s.eiex.tune.xml
Cleaning interval mfr 350...400 injections
Number of compounds covered mfr 203 compounds
Conventional reference method duration mfr 20 min
Post-run time mfr 1.5 min
Recovery range (SANTE criterion) mfr 70...120
Precision (RSD) limit mfr 20
Quantification range mfr 3...100 ppb
MRM database compounds mfr 1100 compounds
Sample matrix ratio (pulp:shell) mfr 1 ratio
Number of compounds mfr 203
High-vacuum pump mfr Split flow turbo turbo
Optimal He column gas flow, mL/min (carrier gas) mfr 1...2
Reagent gas flow, mL/min mfr 1...2
Maximum recommended gas flow, mL/min* mfr 4...6
Maximum gas flow, mL/min† mfr 6.5
JetClean option H2 flow mfr 0.4 mL/min
Autotune mfr Yes Yes
Check the foreline pump oil level mfr Every week week
Check the calibration vial(s) mfr 6 months
Replace the foreline pump oil* mfr 6 months
Replace dry scroll pump tip seals mfr Every year year
Tune the MS mfr As needed needed
Check the foreline pump mfr As needed needed
Clean the ion source mfr As needed needed
Check the carrier gas trap(s) on the GC and MS mfr As needed needed
Replace the worn out parts mfr As needed needed
Lubricate side plate or vent valve O-rings† mfr As needed needed
Replace GC gas supplies mfr As needed needed
Leak check the system mfr As needed needed
Not shown mfr HES assembly assembly
Hydrogen combustible lower limit mfr 4
Hydrogen combustible upper limit mfr 74.2
Turbo pump speed at 10-15 min mfr 80
Turbo pump final speed mfr 95
CI bakeout time mfr 2 hours
Ultrasonic cleaning time per solvent mfr 15 minutes
Syringe Type mfr 10 μL
Column Pneumatics mfr Constant flow flow
Injector Mode mfr Cold splitless splitless
Injector Liner mfr Agilent Ultra Inert fritted splitless liner line
Equilibration Time mfr 3 min
Acquisition Mode mfr dMRM dMRM
Column 1 flow rate mfr 1.28 mL/min
Column 2 flow rate mfr 1.54 mL/min
Oven equilibration time mfr 3 min
Calibration range mfr 3...100 ppb
Post-spike concentration mfr 10 ppb
Replicate injections for precision mfr 10
Purge-Fluss zum Splitauslass mfr 60 min
Septumspülungs-fluss mfr 3 ml/min
Modus Septums­pülungsfluss mfr Geschaltet Geschaltet
Injektionsvolumen mfr 1.0 μl
Injektionstyp mfr Standard Standard
L1 Airgap mfr 0.2 μl
Gassparfluss mfr 30 min
Gesamtfluss Nachlauf mfr 25 ml/min
Trägergas mfr Helium Helium
Einlass-Liner mfr 2 rwirbelungszone
Einlass-Liner Bestellnummer mfr 5190
Anfängliche Ofen-Haltezeit mfr 1 min
Anstiegsrate 1 mfr 80 °C/min
Anstiegsrate 2 mfr 35 °C/min
Gesamtlaufzeit mfr 10 min
Nachlaufzeit mfr 1.5 min
Äquilibrierungszeit mfr 0.25 min
Agilent Bestellnummer mfr 19091 KEY
Durchmesser mfr 0.25 mm
Filmdicke mfr 0.25 μm
Steuerungsmodus mfr Konstanter Fluss Fluss
Fluss mfr 1016 ml/min
Gas saver flow mfr 30 ml/min
Total post-run flow mfr 25 ml/min
Initial oven hold time mfr 1 min
PSD purge flow mfr 5 ml/min
Solvent delay mfr 3 min
Total MRM transitions mfr 614
Maximum simultaneous MRM mfr 127
Raw extract volume for cleanup mfr 3 ml
Number of consecutive injections mfr 700
Dimensions, Weight & Mechanical Design
Column 1 Inner Diameter 0.25 mm
Column 1 Length 15 m
Column Length 15 m
Depth 86 cm
Foreline Pump Weight 22.2 kg
Height 47 cm
Length 15 m
Weight 59 kg
Width 35 cm
Mainframe weight (turbo) mfr 59 kg
Mainframe weight (with CI) mfr 64 kg
Spinach sample mass mfr 10 g
Electrical, Power & Drive Specifications
EM voltage gain mode mfr 10
Interfaces, Connections & Control
GC/MS interface typical setpoint mfr 280 °C
Operating Conditions, Environment & Protection
Final Temperature 2 310 °C
Initial Oven Temperature 80 °C
Inlet Temperature 310 °C
Ion Source Temperature 280 °C
Ms Quadrupole Temperature 150 °C
Quad Temperature 150 °C
Sound pressure 70 dB
Transfer Line Temperature 300 °C
Standards, Safety & General Data
Internal standard mfr Chlorpyrifos-

Description

Construction and series positioning

Behavior under load and in different modes

Installation, control and operation

Integration & Operating Notes

Process Limits
Cap total H2/methane flow to the MS at 50 mL/min

Column flow plus any reagent gas must stay at or below 50 mL/min total; exceeding it creates an explosion hazard in the analyzer. Budget column 1 (1.016 mL/min) and column 2 (1.216 mL/min) flows plus CI reagent gas against this ceiling before commissioning.

User Manual, page 24
Process Limits
Ammonia CI reagent supply must stay below 5 psig

Use a regulator set below 5 psig and keep the ammonia tank upright and below the flow module to prevent condensation. A 5% ammonia/95% helium or 5% ammonia/95% methane mix is frequently used to limit ammonia's negative effects while retaining good CI.

User Manual, page 130
Maintenance
Ballast the foreline pump daily when running ammonia

When ammonia is used 5 or more hours a day, ballast the foreline pump for at least 1 hour daily to minimize damage to pump seals, and purge the MS with methane after ammonia use. Plan this into the daily schedule rather than treating it as occasional maintenance.

User Manual, page 130
Interlock Rule
Verify turbo speed after pumpdown or the electronics will trip

Within 10–15 minutes of pumpdown the turbo should reach 80% and eventually 95%. If these conditions are not met, the MS electronics shut off the foreline pump and a power cycle is required, so monitor speed during every startup rather than assuming pumpdown succeeded.

User Manual, page 121
Mounting
Keep the MS upright and avoid prolonged venting

The instrument must remain upright at all times and should not be left vented to atmosphere for long periods. Plan rigging, storage and service windows so the analyzer is neither tipped nor left open, since either condition risks damage to the analyzer.

User Manual, page 31
Electrical
Follow the hydrogen power-failure recovery sequence exactly

If power fails while unattended, even if restarted: turn off hydrogen at source, turn off GC, turn off MS and cool 1 hour, eliminate ignition sources, open the vacuum manifold to atmosphere, wait at least 10 minutes, then start normally. Skipping steps risks ignition of accumulated hydrogen.

User Manual, page 26
Maintenance
Weekly pump-fluid check and monthly leak check are mandatory

Check foreline pump fluid weekly, replace oil every 6 months or as needed, and expect pump replacement about every 3 years. Check calibration vials every 6 months, replace dry scroll pump tip seals yearly, and perform a system leak check monthly or as needed, especially with hydrogen carrier.

User Manual, page 154
Process Limits
Allow about 3 hours for CI/EI source changes

Switching between CI and EI sources takes about 1 hour plus 1–2 hours to purge reagent gas lines and bake out contaminants; PCI-to-NCI switching needs about 2 hours for source cooling. Sequence method development so these transitions do not fall inside a sample run.

User Manual, page 17

Selection & Integration Q&A

When should I choose the 7000E GC/TQ rather than the 5977C GC/MSD or the 7010D?

Pick the 7000E when you need MS/MS selectivity and sensitivity for multi-residue work such as 203 pesticides in 10 minutes at 3–100 ppb. The 5977C single quad lacks MS/MS; the 7010D is the higher-tier TQ used in the same application notes, for example with helium carrier where the 7000E configuration used hydrogen.

What carrier and collision gas plumbing and flows must be in place before commissioning?

Provide helium carrier at 1.016 mL/min on column 1 and 1.216 mL/min on column 2, nitrogen collision gas at 1.5 mL/min, quench helium at 2.25 mL/min, and 50 mL/min purge to split vent. If hydrogen is plumbed, total H2/methane to the MS must stay at or below 50 mL/min.

What mounting and environment rules apply to the analyzer and its foreline pump?

Keep the MS upright at all times and do not leave it vented to atmosphere for long periods. Use only Agilent-approved foreline pumps purchased under GC/MS part numbers with the supplied inlet valve; operate Pfeiffer Duo/MVP and Edwards RV5 pumps with gas ballast closed. Keep the CC chamber shipping brackets fastened and remove the plastic window cover.

What maintenance schedule and accessories are required beyond the base instrument?

Plan weekly pump-fluid checks, oil changes every 6 months, pump replacement about every 3 years, calibration-vial checks every 6 months, yearly dry scroll tip seals, and monthly leak checks. The 22.2 kg foreline pump, columns, interface tip seals, column nuts and CI source kit are separate items, not part of the base MS delivery.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
7000E/7010C Series Triple Quadrupole GC/MS Operating Manual
Manual ·252 pp.
View PDF
PDF
Analysis of 197 Pesticides in Durian
Brochure ·5,2 МБ ·18 pp.
View PDF
PDF
Fast and Robust GC/MS/MS Analysis of Pesticides
Brochure ·1,3 МБ ·15 pp.
View PDF