BINDER MKFT 115
BINDER ·Made in Germany · In Active Production

BINDER MKFT 115

BINDER MKFT 115 — Climate chambers with Temperature -70…180 °C.

The BINDER MKFT 115 is a 115 L alternating climate chamber with deep-temperature capability to -70 °C and humidity control from 10 to 95 % RH. It is the smallest deep-temperature model in the MKFT series, distinguished from the MKF 115 by its extended low-temperature range and from larger MKFT 240/720 by chamber volume. It serves as a programmable test platform for cyclic temperature/humidity stress screening of components and materials.

Temperature
-70…180 °C

BINDER MKFT Series — Model Comparison & Selection

Model Temperature, °CHumidity range, % rhInterior volume, LLoad per rack, kgMax heat compensation, WNominal power, kW
MKFT 115 Current -70–18095115304005
MKFT 240 -70–18010...98228304006
MKFT 720 -70–18010...987344080011

Full specifications

Core Performance & Functional Specifications
Temperature -70...180 °C
Interior volume 115 L (MKFT115-400V)
Load per rack 30 kg (MKFT115-400V)
Maximum heat compensation 400 W
Nominal power 5 kW (MKFT115-400V)
Article Number mfr 9020
Electrical, Power & Drive Specifications
Power frequency 50 Hz (MKFT115-400V)
Rated voltage 400 V
Unit fuse 16.0 A (MKFT115-400V)
Operating Conditions, Environment & Protection
Humidity range 95
Cooling down time from 180°C to -70°C mfr 120 min
Humidity fluctuation with humidity dependent on set value mfr 2.5 % r.F.
Standards, Safety & General Data
Average heating-up rate according to IEC 60068-3-5 between -40°C and 180°C mfr 5.5 K/min

Description

Construction and series positioning

The MKFT 115 (Art. No. 9020-0382, designation 115-400) is a 400 V 3~/N/PE 50 Hz chamber with a 115 L interior and a nominal power of 5 kW. Within the MKFT deep-temperature series it is the smallest volume; the MKFT 240 and MKFT 720 share the same -70…180 °C range but offer larger interiors. Compared with the MKF 115, the MKFT adds the deep-temperature stage, extending the lower limit from the MKF range to -70 °C. The standard model is the 400 V version; the -C suffix denotes a voltage and frequency changer variant (MKFT115-400V-C, Art. No. 9020-0362) for 480 V 3~ 60 Hz supplies.

Thermal and humidity behavior

These figures define the achievable ramp rates and the load the refrigeration system can offset during temperature transitions.

Installation, control and operation

The chamber requires a 400 V 3-phase supply with 16 A unit fuse. From size 115 on, a rear power switch is provided in addition to the main power switch; both must be on for commissioning. Water connections are required for humidification: freshwater supply and wastewater drain, with an internal freshwater can from size 115 on. The MB2 chamber controller supports fixed-value, time-program and week-program modes, with set-point ramps/steps, tolerance ranges and section repetition. Temperature safety devices include an over-temperature protective device (class 1) and a safety controller (class 2), with an optional over/under temperature safety device class 2. Zero-voltage switching outputs are available for external signaling. The controller logs events and supports a chart-recorder display.

Integration & Operating Notes

Electrical
Both main and rear power switches must be on for size 115

From size 115 on, the chamber has a rear power switch in addition to the main power switch. During commissioning and troubleshooting, both must be switched on; otherwise the chamber will not operate even with the main switch on. Verify this before diagnosing a no-power condition.

Operating Manual MKF/MKFT (E5) 10/2026, p.24-25, p.135
Process Limits
Humidity control limited to 10…90 °C chamber temperature

Although the chamber reaches -70…180 °C in dry operation, humidity control is only permitted between 10 and 90 °C. Programming humidity set points outside this window will not produce valid results and may trigger alarms. Plan test profiles so that humid phases stay within this temperature band.

Data Sheet Model MKFT 115 en.pdf; Operating Manual MKF/MKFT (E5) 10/2026, Technical Data
Process Limits
Humidity sensor exposed to ammonia and ozone limits

The humidity sensor has resistance limits for certain substances: ammonia (NH3) maximum workplace threshold 20 ppm / 14 mg/m³ and permanent load 5500 ppm / 4000 mg/m³; ozone (O3) 0.1 ppm / 0.2 mg/m³ and 0.5 ppm / 1 mg/m³. Process atmospheres exceeding these concentrations can damage the sensor and invalidate humidity readings.

Operating Manual MKF/MKFT (E5) 10/2026, p.20 table
Maintenance
Annual maintenance and leak test required by EU regulation

Regular maintenance is required at least once a year, including a leak test per Regulation (EU) 517/2014 (Article 4 and Article 10 (1)(b)). Document the leak test in the service log book. Additionally, an annual repeat electrical inspection per EN 50678/VDE 0701 and EN 50699/VDE 0702 is recommended.

Operating Manual MKF/MKFT (E5) 10/2026, p.134
Maintenance
Service message at 8760 hours or two years requires BINDER reset

After 8760 operating hours or two years, a service message appears on the controller. After confirmation it reappears every two weeks until reset by BINDER Service. Plan a service intervention at this interval to avoid recurring alarms and to maintain warranty compliance.

Operating Manual MKF/MKFT (E5) 10/2026, p.135
Maintenance
Condenser cleaning every 1–2 years; fan grid weekly in dusty air

Condensers should be cleaned every 1 to 2 years by a qualified technician. With increased dust in ambient air, check the fan grid behind the left maintenance access flap every week and clean by suction after disconnecting the chamber. Neglecting this reduces cooling performance and can cause overheating.

Operating Manual MKF/MKFT (E5) 10/2026, p.134-135
Maintenance
Replace door gasket only when cold

The door gasket must be replaced only when the chamber is cold. Attempting replacement at elevated temperature can deform or damage the new gasket and compromise the seal, leading to temperature/humidity deviations and energy loss.

Operating Manual MKF/MKFT (E5) 10/2026, p.134
Process Media
Humidification requires freshwater supply and wastewater drain

The humidification system needs a freshwater connection and a wastewater drain. From size 115 on, an internal freshwater can is provided for manual supply. Ensure water quality is suitable; steam humidifier maintenance intervals depend on water quality and steam output. A water circle lever for condensate recycling is available as an option for sizes 115 and above.

Operating Manual MKF/MKFT (E5) 10/2026, p.32-33, p.134
Control & I/O
Zero-voltage switching outputs available for external signaling

The chamber provides zero-voltage switching outputs that can be used to signal operating states or alarms to external equipment. These are dry contacts and require an external power source and wiring per the manual. Use them to integrate chamber status into a supervisory system.

Operating Manual MKF/MKFT (E5) 10/2026, Zero-voltage switching outputs

Selection & Integration Q&A

When should I choose the MKFT 115 over the MKF 115 or the larger MKFT 240/720?

Choose MKFT 115 when you need deep-temperature cycling to -70 °C in a compact 115 L chamber. The MKF 115 lacks the deep-temperature stage. The MKFT 240/720 offer larger volumes but same temperature range; select them only if 115 L is insufficient for your load.

What are the electrical supply requirements for the MKFT 115, and can it be used on a 480 V 60 Hz grid?

The standard MKFT115-400V requires 400 V 3~/N/PE 50 Hz with a 16 A unit fuse. For 480 V 3~ 60 Hz supplies, specify the MKFT115-400V-C variant (Art. No. 9020-0362), which includes a voltage and frequency changer. Do not connect the standard model to 480 V.

What water connections are needed for humidity operation, and what maintenance do they imply?

Connect freshwater supply and wastewater drain. From size 115 on, an internal freshwater can is provided for manual supply. The steam humidifier requires maintenance at least once a year, with intervals depending on water quality and steam output. A water circle lever for condensate recycling is optional.

What maintenance schedule and service parts should I plan for the MKFT 115?

Plan annual maintenance including leak test per EU 517/2014 and electrical safety test per EN 50678/VDE 0701. Clean condensers every 1–2 years; in dusty air, check fan grid weekly. A service message appears at 8760 h or two years and requires BINDER Service reset. Door gasket replacement only when cold.

Dimensional Drawings & Technical Documentation

Dimensional drawings

MKFT 115 — drawing 1

Click drawing to inspect vector dimensions

Technical documentation

PDF
Data Sheet Model MKFT 115 en
Datasheet ·920,1 КБ ·10 pp.
View PDF
PDF
MKF+MKFT (E5) 10 2026 en
Manual ·18,1 МБ ·179 pp.
View PDF