Operating Instructions — VSI 300 (BA 832-42-PT, EN)
Technical Reference Summary
Covered Models & Document Scope
This manual covers the S-VSI 300 two-shaft screw vacuum pump (TWISTER S-VSI series) in its standard version with through-flow cooling and the optional variants: control unit and circulation cooling. It describes safe and proper use for all S-VSI 300 pumps.
Section-by-Section Technical Breakdown
The S-VSI 300 is a two-shaft screw vacuum pump. Gas is drawn in, conveyed between the screw rotors and the housing, and compressed by the rotating motion of the rotors. The compression chamber is separated from the gear chamber by special seals; the gear chamber is vented to atmosphere and can be pressurized with sealing gas. Drive is via a coupling with an elastomer element from the motor.
- Two-shaft screw vacuum pump with non-contacting screw rotors
- Compression chamber separated from oil-filled gear chamber by special seals
- Gear chamber is atmospherically vented and can be pressurized with sealing gas
- Motor drive through elastomer coupling
- Oil recommendation plate and oil level sight glass provided
The pump is particularly suitable for conveying extremely humid gases. It has a high tolerance to water vapor.
- Suitable for extremely humid gases
- High water vapor tolerance
The standard version uses through-flow water cooling. Optional variants include a control unit and circulation cooling. The circulation cooling circuit uses a thermostatically controlled three-way valve, a temperature switch and a flow switch; the cooling water connections are G 3/4.
- Standard: through-flow cooling
- Optional: control unit
- Optional: circulation cooling with thermostatic three-way valve, temperature switch and flow switch
- Circulation cooling connections: G 3/4 inlet and outlet
- Circulation cooling tank capacity: 30 l
- Operating weight with circulation cooling: 131 kg (dry 101 kg)
Installation covers preparation, mounting, connecting vacuum and cooling-water piping, filling with lubricating oil and connecting the motor. The pump must be installed free from external vibration.
- No external vibration influence permitted
- Cooling water connections G 1/2 (standard) or G 3/4 (circulation cooling)
- Condensate drain G 1/2
- Fill with lubricating oil before operation
- Connect motor according to supply
Commissioning includes checking the direction of rotation and residual operation. Decommissioning and recommissioning procedures are also described.
- Check direction of rotation before commissioning
- Observe residual operation notes
- Follow decommissioning/storage procedure
- Follow recommissioning procedure
Maintenance covers ensuring operational safety, oil change, air filtration, coupling and cooling maintenance. Repair/service and spare parts information are included.
- Oil change procedure
- Air filter maintenance
- Coupling maintenance
- Cooling system maintenance
- Spare parts available under E 832
Technical data section provides performance and dimensional data for the S-VSI 300.
- Detailed technical data available on request
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Cooling water connections on standard version are G 1/2. p.13 ↗ | Size cooling water piping and fittings to G 1/2 for the standard through-flow cooling version. | S-VSI 300 standard |
| Cooling water connections on circulation cooling option are G 3/4. p.17 ↗ | Size cooling water piping and fittings to G 3/4 when the circulation cooling option is fitted. | S-VSI 300 with circulation cooling |
| Condensate drain connection is G 1/2. p.12 ↗ | Provide a G 1/2 drain line for condensate removal. | S-VSI 300 |
| Circulation cooling tank capacity is 30 l. p.17 ↗ | Provide at least 30 l of cooling water capacity for the circulation cooling option. | S-VSI 300 with circulation cooling |
| Weight / operating weight with circulation cooling is 101 / 131 kg. p.17 ↗ | Use 101 kg dry weight and 131 kg operating weight for lifting and foundation design. | S-VSI 300 with circulation cooling |
| Circulation cooling dimensions are 580 mm x 580 mm x 650 mm. p.17 ↗ | Allow footprint of 580 mm x 580 mm and height 650 mm for the circulation cooling option. | S-VSI 300 with circulation cooling |
| Use only clean water with neutral pH for cooling. p.20 ↗ | Water quality must be controlled to neutral pH and cleanliness to avoid cooling circuit damage. | S-VSI 300 |
| Storage relative humidity: 0 % to 80 %. p.11 ↗ | Store the pump in an environment with relative humidity between 0 % and 80 %. | S-VSI 300 |
| Hot surfaces > 70 °C are present on the machine. p.12 ↗ | Provide guarding or warning and avoid contact with hot surfaces above 70 °C. | S-VSI 300 |
| The pump is particularly suitable for conveying extremely humid gases and has high water vapor tolerance. p.15 ↗ | Select this pump for processes with high water vapor content. | S-VSI 300 |
| The gear chamber is atmospherically vented and can be pressurized with sealing gas. p.14 ↗ | Sealing gas can be connected to the gear chamber for applications requiring it. | S-VSI 300 |
| The drive is via an elastomer coupling from the motor. p.14 ↗ | Check coupling elastomer element during maintenance. | S-VSI 300 |
| No external vibration influence is permitted. p.18 ↗ | Install the pump on a vibration-isolated or rigid foundation free from external vibration. | S-VSI 300 |
| Check direction of rotation before commissioning. p.24 ↗ | Verify motor rotation direction to prevent pump damage. | S-VSI 300 |
| Oil change is a required maintenance activity. p.27 ↗ | Follow oil change procedure and use recommended oil per oil recommendation plate. | S-VSI 300 |
| Air filtration maintenance is required. p.28 ↗ | Service air filter according to maintenance schedule. | S-VSI 300 |
| Spare parts are listed in document E 832. p.32 ↗ | Order spare parts using the E 832 spare parts list. | S-VSI 300 |