BINDER FD 720
BINDER ·Made in Germany · In Active Production

BINDER FD 720

BINDER FD 720 — Drying ovens with Temperature 12…300 °C.

The FD 720 is a forced-convection drying and heating oven in BINDER's Avantgarde.Line, with a 741 L interior and a +12 to 300 °C working range. As the largest FD size, it is the only variant with a 400 V 3N~ supply and a fixed 1.8 m power cable. It is intended for tempering, drying and heat treatment of solid, pulverized or bulk materials where airflow and temperature uniformity matter.

Temperature
12…300 °C

BINDER FD Series — Model Comparison & Selection

Model Temperature, °CAir change rate, 1/hourDepth, mmHeating up time to 150 c, minHeight, cmInterior volume, L
FD 720 Current 12–300587025159741
FD 115 10–300326051873.5116
FD 23 5–300645202549.520
FD 260 10–30098251994259
FD 56 10–300805651562.560

Full specifications

Core Performance & Functional Specifications
Temperature 12...300 °C
Air change rate 5 x/h
Heating time to 150°C 25 min
Interior volume 741 L
Load per rack 45 kg
Nominal power 4.5 kW
Permitted load 315 kg
Temperature fluctuation 0.6 K
Temperature uniformity 2.5 K
Rear wall clearance 160 mm
Side wall clearance 100 mm
Article Number mfr 9010
Recovery time after door was opened for 30 s at 150°C mfr 6 min
Dimensions, Weight & Mechanical Design
Depth 870 mm
Height 1590 mm
Width 1165 mm
Net weight of the unit (empty) mfr 166 kg
Electrical, Power & Drive Specifications
Power frequency 50 Hz
Rated voltage 400 V
Unit fuse 16.0 A
Phase (Nominal voltage) mfr 3 N/PE

Description

Construction and positioning

Behavior under load and in operation

Installation, connection and control

Integration & Operating Notes

Electrical
Three-phase 400 V supply with internal 16 A breaker

The FD 720 draws 4.5 kW on a 400 V 3N~ 50 Hz supply and protects itself with an internal 16 A miniature circuit breaker rather than an external chamber fuse. Verify that the upstream circuit can deliver the nominal current continuously and that supply fluctuations stay within ±10 % of nominal; a fixed 1.8 m cable means the receptacle must be within reach of the installation position.

Quick Start Guide, Electrical connection data and installation, p.18
Mounting
Rear and side clearances are mandatory for airflow

Maintain at least 160 mm behind and 100 mm at the sides of the chamber. The unit must not be set up in non-ventilated recesses; insufficient clearance prevents heat dissipation and can trip the overtemperature protection. The floor must be non-flammable and level, and the unit must be moved with a fork lifter from the rear only.

Quick Start Guide, Requirements for the location of installation, p.18; Operating Manual, Section 1.8
Process Limits
Maximum set-point on the 720 depends on room temperature

On two-door ED, FD and FED 720 chambers the maximum adjustable temperature set-point is not a fixed 300 °C; it depends on the ambient temperature in the room. When planning a process near the upper limit, confirm the achievable set-point for the actual ambient conditions and keep the safety controller set-point 2–5 °C above the process value.

Quick Start Guide, Set-point entry for temperature, p.20
Process Limits
Load only half the usable volume with 10 % wall clearance

Samples must remain inside the usable volume with at least 10 % of the interior dimensions as clearance to walls, and the usable volume must not be loaded by more than half. Exceeding this prevents sufficient airflow and homogeneous temperature distribution; rack load is limited to 45 kg and total permitted load to 315 kg.

Quick Start Guide, Placing the charging material in the usable volume, p.19
Control & I/O
Safety controller must be reset after an overtemperature trip

The chamber has an overtemperature protective device class 1 (trip at 330 °C for FD 720) and a safety controller class 2. After a trip, disconnect the chamber, let it cool below the reset threshold or safety controller set-point, inspect if appropriate, reset the alarm on class 2, then restart. Do not simply raise the set-point to clear the alarm.

Quick Start Guide, Troubleshooting in the event of overtemperature
Maintenance
Annual electrical inspection and licensed maintenance required

Maintenance must be performed at least once a year by licensed electricians or experts authorized by BINDER, and an annual repeat electrical inspection per EN 50678/VDE 0701 and EN 50699/VDE 0702 is recommended. Replace the door gasket only when the chamber is cold; otherwise the gasket may be damaged. A repeatedly tripping chamber fuse indicates a fault and should be investigated rather than replaced again.

Operating Manual, Section 10.1–10.3, p.36–37
Maintenance
Hot-air sterilization possible at 190 °C for 30 minutes

The FD series can be hot-air sterilized at 190 °C for at least 30 minutes, and racks can be removed and autoclaved. All inflammable goods must be removed from the interior before sterilization. Use BINDER neutral cleaning agent (art. no. 1002-0016) and disinfectant spray (art. no. 1002-0022); do not apply neutral cleaner to zinc-coated hinge parts or the rear wall.

Quick Start Guide, Cleaning and decontamination, p.23

Selection & Integration Q&A

When should I choose the FD 720 instead of the smaller FD 115 or FD 260?

Choose the FD 720 when the batch needs the 741 L interior and the 315 kg total load; it is also the only FD size with a 400 V 3N~ supply and a fixed 1.8 m cable. The FD 115 and FD 260 run on 230 V 1N~ and suit smaller loads where a three-phase supply is not available.

What supply and upstream protection does the FD 720 require, and can it share a circuit with other equipment?

It needs 400 V 3N~ 50 Hz, 4.5 kW nominal, with an internal 16 A miniature circuit breaker; supply fluctuation must stay within ±10 %. Because the 720 has no external chamber fuse, size the upstream circuit for the full 4.5 kW and avoid sharing it with loads that cause large voltage dips.

What maintenance and consumables are needed beyond the base delivery?

Plan annual maintenance by BINDER-authorized personnel plus annual electrical inspection per EN 50678/VDE 0701 and EN 50699/VDE 0702. Consumables include the door gasket (replace only when cold), neutral cleaning agent art. 1002-0016 and disinfectant spray art. 1002-0022; racks are removable and autoclavable.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
Data Sheet Model FD 720 en
Datasheet ·383,2 КБ ·7 pp.
View PDF
PDF
QuickStartGuide BD BF ED FD FED E31 03 2023 dt en fr
Manual ·1,7 МБ ·35 pp.
View PDF
PDF
BD ED FD (E2) 09 2026 en
Manual ·12,9 МБ ·71 pp.
View PDF