BINDER VDL 115
BINDER VDL 115 — Drying ovens with Temperature 9…110 °C.
The BINDER VDL 115 is a 119-litre vacuum drying chamber with a 9–110 °C working range and a 16 mm small-flange vacuum connection, built for solvent-laden processes under ATEX zone 2/3 conditions. It is the largest of the three VDL sizes (23, 56, 115 litres) and is distinguished by a 70 kg total load capacity and 20 kg per rack. Its primary role is controlled vacuum drying of flammable-solvent-wet materials in a system with an ATEX-compliant vacuum pump and compressed-air flushing.
BINDER VDL Series — Model Comparison & Selection
Full specifications
| Temperature | 9...110 °C |
| Heating time to 100°C | 170 min |
| Interior volume | 119 L (VDL 115) |
| Leak rate | 0.01 bar/h |
| Load per rack | 20 kg (VDL 115) |
| Nominal power | 1.6 kW |
| Permitted load | 70 kg (VDL 115) |
| Pressure fluctuation over time | 1 mbar |
| Temperature fluctuation | 0.1 K |
| Temperature uniformity | 2.9 K |
| Rear wall clearance | 100 mm (VDL 115) |
| Side wall clearance | 70 mm (VDL 115) |
| Article Number mfr | 9630 |
| Pressure fluctuation over time at 400 mbar mfr | 70 mbar |
| Depth | 581 mm (VDL 115) |
| Height | 942 mm (VDL 115) |
| Width | 743 mm (VDL 115) |
| Power frequency | 50 Hz |
| Rated voltage | 200...230 V |
| Unit fuse | 10.0 A |
| Phase (Nominal voltage) mfr | 1 |
| Vacuum connection with small flange mfr | 16 mm |
Description
Construction and series positioning
- The VDL 115 is the largest chamber in the VDL series, with 119 L interior volume and net dimensions of 743 mm wide × 942 mm high × 581 mm deep. It shares the 9–110 °C temperature range with the VDL 23 and VDL 56 but offers substantially more usable volume and a higher permitted load (70 kg total, 20 kg per rack).
- The chamber is built for flammable-solvent service under ATEX EX II 2/3/- G IIB T3 Gb/Gc/- X. The electrical equipment area is protected by a compressed-air flushing system, and the MB2 microprocessor program controller is housed in a triangular instrument box on the chamber.
- Two voltage variants exist: VDL115-230V (Art. No. 9630-0011, 200–230 V 1~ 50/60 Hz, CEE 7/7 plug) and VDL115-120V (Art. No. 9630-0015, 100–120 V 1~ 50/60 Hz, NEMA 5-15 plug). The nominal power is 1.6 kW; the unit fuse is 10.0 A.
Behaviour under load and process conditions
- Heating-up time to 100 °C is 170 min. Temperature fluctuation is 0.1 K and temperature uniformity is 2.9 K, measured under the factory conditions. The chamber will not release the heater until the internal pressure reaches the 100 mbar threshold; below this pressure, no heating occurs.
- The vacuum connection is a 16 mm small flange. Leak rate is specified as 0.01 bar/h, and pressure fluctuation over time is 1 mbar (at 400 mbar, the extra spec lists 70 mbar). The chamber is designed for operation with an ATEX-compliant vacuum pump suitable for suction from Zone 0 or Zone 1; the VP5 EX accessory pump has a maximum gas inlet temperature of 40 °C.
- Compressed-air flushing requires an inlet pressure of 2 bar at the chamber. The chamber must not be installed in Zone 0 or Zone 1; site it in a non-hazardous or appropriately classified area per the explosion protection document.
Installation, control and operation
- The MB2 controller provides setpoint entry, timer and time programs, week programs, tolerance range and alarm settings, and a chart recorder display. It supports Ethernet communication and a USB interface for data transfer. An optional flexible Pt 100 object temperature sensor can be connected for product temperature measurement.
- Installation requires wall clearances of 100 mm at the rear and 70 mm at the sides. Technical ventilation must cover both the chamber and the vacuum pump installation area and must be provided before commissioning. Equipotential bonding must be implemented per the grounding concept.
- Before initial commissioning, an explosion protection test is mandatory; recurring tests follow the operator’s explosion protection concept. An annual electrical inspection per EN 50678/VDE 0701 and EN 50699/VDE 0702 is recommended, and electrical and explosion protection tests are required after any maintenance or repair before restarting.
Integration & Operating Notes
The chamber will not heat until the pressure threshold of 100 mbar is reached. Ensure the vacuum system can pull the chamber below this threshold before expecting temperature control; otherwise the process will stall without an obvious alarm.
The VDL 115 is not rated for installation inside potentially explosive areas of Zone 0 or Zone 1. Site the chamber only in a non-hazardous area or one classified per the explosion protection document, and ensure the surrounding area is included in the technical ventilation concept.
The chamber is available in 230 V and 120 V variants with different article numbers and plugs. Connecting a 230 V variant to a 120 V supply (or vice versa) will prevent proper operation and may damage the controller or heater. Check the type plate for nominal voltage, power and fuse rating.
The compressed-air flushing system for the electrical equipment area must be supplied at 2 bar at the chamber inlet. Undersized or unregulated supply lines will compromise the ATEX protection of the instrument box and may trigger alarms or prevent commissioning.
If the inner chamber temperature reaches the safety controller value, the controller triggers the alarm 'Safety controller' and may shut off the heater. After acknowledging the alarm, verify that the temperature setpoint and the safety controller value are correctly related; a mis-set limit will cause repeated trips.
Schedule an annual repeat electrical inspection according to EN 50678/VDE 0701 and EN 50699/VDE 0702, and perform the same test after any maintenance or repair before resuming operation. Keep records as part of the operator’s safety documentation.
If the chamber does not heat up, first verify that the door is properly closed and the door gasket is intact, then check the chamber fuse and supply voltage. If the fault persists, the Pt 100 sensor, heating element or semiconductor relay may be defective; contact BINDER service rather than attempting repair.
Selection & Integration Q&A
Choose the VDL 115 when the batch volume or load exceeds the capacity of the 23 L or 56 L models. It offers 119 L interior volume and a permitted load of 70 kg (20 kg per rack), while sharing the same 9–110 °C range and ATEX rating. Select a smaller sibling only for limited sample sizes or where bench space is constrained.
The vacuum pump must be ATEX-compliant per 2014/34/EU and suitable for suction from Zone 0 or Zone 1; the VP5 EX accessory is limited to 40 °C gas inlet temperature. The compressed-air flushing inlet requires 2 bar at the chamber. The vacuum connection is a 16 mm small flange, and the chamber leak rate is 0.01 bar/h.
Maintain 100 mm clearance at the rear and 70 mm at the sides. The chamber must not be installed in Zone 0 or Zone 1, and technical ventilation must cover both the chamber and the vacuum pump area. Equipotential bonding is required per the grounding concept, and an explosion protection test is mandatory before commissioning.
Annual electrical inspection per EN 50678/EN 50699 and explosion protection tests before first start and after service are required. The base delivery does not include the vacuum pump, pump module, connection kits, APT-COM 4 software, analog outputs, or the flexible Pt 100 sensor; these are options. The door gasket and fuse are serviceable wear items.