Elmo Rietschle 2BV2060 — Liquid Ring Vacuum Pumps with Max inlet pressure 101.3 kPa, Motor power 3.5 kW, Ultimate pressure 10 mbar.
Single-stage liquid-ring vacuum pump 2BV2060 with cast-iron casing, ceramic coating and bronze impeller, driven by a 3.05 kW (50 Hz) / 3.5 kW (60 Hz) motor. Ultimate pressure 10 mbar, max inlet 1013 mbar, design operating-liquid flow 0.20 m³/h. Used for wet, condensable or particle-laden gas duty where a dry pump would foul.
Elmo Rietschle L-BV2 Series — Model Comparison & Selection
Full specifications
| Max inlet pressure | 1013 mbar |
| Motor power | 3.05 kW (50 Hz) 60 Hz: 3.5 kW |
| Operating principle | Liquid ring vacuum pump |
| Ultimate pressure | 10 mbar |
| Number of stages | 1 dimensionless |
| Weight | 28 kg |
| Power supply | 3~ 50/60 Hz |
| Noise level | 62 dB(A) (50 Hz) 60 Hz: 65 dB(A) |
| Protection rating | IP55 |
Description
Construction and series positioning
- Single-stage liquid-ring pump, close-coupled to a 3~ 50/60 Hz motor, IP55, 28 kg.
- Material variant N: cast-iron casing with ceramic coating and bronze impeller; stainless/corrosion-resistant variants M, P, H, C exist for the same model code.
- Choose 2BV2060 when the duty point sits at low suction flow and 10 mbar ultimate is sufficient.
Behavior under load and media
- Maximum gas/vapour temperature +80 °C; above this, increase operating-liquid flow to 2.5× design (0.50 m³/h) or fit a pre-condenser, and guard against burns.
- Operating-liquid temperature +5 to +80 °C (nominal +15 °C); ambient +5 to +40 °C.
- Max discharge pressure in vacuum duty 1.1 bar abs; max internal pressure 8 bar abs.
- Water carry-over through inlet: 2.5× design flow continuous, 7× for max 2 s.
- Minimum suction pressure must stay at least 50 mbar above the vapour pressure of the operating fluid to avoid cavitation.
Installation, connection and control
- Suction/discharge piping torque must not exceed 100 Nm; fit an intake strainer for the first 100 operating hours.
- Maintain 34 mm clearance around the fan guard for heat dissipation; max installation altitude 1000 m; max vibration velocity 4.5 mm/s.
- Electrical supply tolerance ±5% voltage, ±2% frequency; terminal-box air gap ≥5.5 mm at UN ≤690 V.
- First fill 0.5 L operating liquid; set flow limiter to 0.20 m³/h.
- Frequency-converter operation permitted up to 4612 min⁻¹ (2BV2060/2061); ATEX versions forbid VFD operation entirely.
Integration & Operating Notes
Operating below the vapour pressure of the operating liquid causes cavitation, erosion and loss of vacuum. If the process vapour pressure approaches the suction pressure, consult the manufacturer before commissioning.
The inlet can tolerate 2.5 times the 0.20 m³/h design operating-liquid flow continuously, or 7× for no more than 2 seconds. Exceeding this requires a liquid separator upstream to protect the pump.
Insufficient clearance restricts cooling air and causes motor overheating. The 34 mm minimum applies to 2BV2060/2061 types and must be checked after installation of guards or enclosures.
Over-tightening piping can crack the cast-iron flanges or damage the ceramic coating. Use torque wrenches and support heavy pipework independently of the pump.
Dry windings if insulation resistance is ≤1 kΩ per volt of measurement potential. Commissioning with damp windings risks motor failure and invalidates warranty.
When using a frequency converter, do not exceed the maximum speed of 4612 min⁻¹. ATEX variants of this model must not be operated with a frequency converter at all.
Bearing service interval is 2.5 years or 20,000 operating hours. Use UNIREX N3 grease (DIN 51825-K3N), filling approx. 50% of roller-bearing free space and 65% of adjacent areas. Do not mix grease types.
Installation debris can damage the impeller and casing. Fit a temporary strainer in the suction line and remove it after the first 100 hours of operation.
Selection & Integration Q&A
Pick 2BV2060 for low-flow duties needing 10 mbar ultimate with a 3.05 kW motor (50 Hz) or 3.5 kW (60 Hz).
Provide 0.20 m³/h design flow with first fill of 0.5 L. Keep liquid temperature +5 to +80 °C (nominal +15 °C).
Bearings need service every 2.5 years or 20,000 h with UNIREX N3 grease; intake strainer for first 100 h is not supplied. Operating liquid, piping, and electrical cables are not included in base delivery.