Elmo Rietschle 2BV2071
Elmo Rietschle 2BV2071 — Liquid Ring Vacuum Pumps with Motor power 8.6 kW, Pumping speed 500 m³/h.
Single-stage liquid ring vacuum pump 2BV2071 with 7.3 kW (50 Hz) / 8.6 kW (60 Hz) motor, delivering 500 m³/h at 50 Hz and 575 m³/h at 60 Hz. As the largest 2BV207x variant, it is distinguished by a 1.0 L first-fill and 116/156 mm liquid-level window, and is available in cast iron or stainless steel construction. It serves continuous vacuum duty where the operating liquid is water and the process gas is free of solids.
Elmo Rietschle L-BV2 Series — Model Comparison & Selection
Full specifications
| Motor power | 7.3 kW (50 Hz) 60 Hz: 8.6 kW |
| Operating principle | Liquid ring |
| Pumping speed | 500 m³/h (50 Hz) 60 Hz: 575 m³/h |
| Number of stages | 1 dimensionless |
| Weight | 64 kg |
| Power supply | AC |
| Noise level | 61 dB(A) |
| Protection rating | IP55 |
Description
Construction and series positioning
- Single-stage liquid ring pump with a directly coupled AC motor, IP55 protection, weighing 64 kg.
- Within the L-BV2 series, the 2BV2071 is the highest-capacity 2BV207x model: the 2BV2060 and 2BV2061 use 3.0–3.5 kW motors, while the 2BV2070 shares the 7.3 kW motor but differs in first-fill quantity and liquid-level limits (specific values for the 2BV2070 are not provided in the verified data).
- Unlike smaller siblings, the 2BV2071 (together with the 2BV2070 and 2BV5.. types) is available in a higher corrosion-resistance/hygiene construction; the standard design is cast iron RAL 9006, with all-stainless variants pickled and passivated.
- The pump is not supplied with integrated monitoring; ATEX-certified versions (II 2G Ex h IIC T3 Gb, option F91) are covered by a separate supplement and require additional sensors.
Behavior under load and media
- Performance is tied to the operating-liquid flow: the design flow for the 2BV207. size is set by the flow limiter, and the first fill is 1.0 L. Maximum discharge pressure in vacuum operation is 1.1 bar abs; maximum permissible internal pressure is 8 bar abs. The 1.1 bar abs limit is a process trip for vacuum operation, while the 8 bar abs limit is the mechanical design pressure of the pump casing.
- Gas/vapour temperature must not exceed +80 °C; above this, increase operating-liquid flow to 2.5× design or install a pre-condenser. Operating-liquid temperature range is +5 °C to +80 °C (nominal +15 °C), and ambient temperature +5 °C to +40 °C.
- Water carry-over through the inlet is limited to 2.5× design flow continuously and 7× for max 2 s; liquid separation must be sized accordingly.
- Minimum suction pressure is bounded by the vapour pressure of the operating liquid plus 50 mbar (this margin is specified as an ATEX rule; for non-ATEX units, consult the manufacturer for cavitation risk).
Installation, connection and control
- Piping connections to suction and discharge must not be tightened beyond 100 Nm; an intake strainer is required for the first 100 operating hours.
- Electrical supply tolerance is ±5% voltage and ±2% frequency. Motor insulation resistance must be checked before commissioning; dry windings if ≤1 kΩ per volt.
- Minimum clearances for heat dissipation: 53 mm around the fan guard for the 2BV207. size (i.e., models 2BV2070 and 2BV2071). Maximum installation altitude is 1000 m above sea level.
- When a frequency converter is used (non-ATEX only), speed must stay within 2123–3715 min⁻¹ for the 2BV2070/2071. ATEX versions explicitly forbid frequency-converter operation.
- ATEX installations require independent monitoring of operating-liquid feed (trip at ≤50% design flow) and liquid level (start-up only within 116–156 mm), plus discharge pressure monitoring (G2) that switches off the unit if 1.1 bar abs is exceeded. This trip limit is a process safety setting for vacuum operation and does not conflict with the higher mechanical design pressure of 8 bar abs.
Integration & Operating Notes
Dry the windings if insulation resistance is ≤1 kΩ per volt of measurement potential. Supply tolerance is ±5% voltage and ±2% frequency. Maintain a minimum 5.5 mm air gap between non-insulated energized components and earth for UN ≤ 690 V.
For ATEX units, operating-liquid feed monitoring must trip at ≤50% of design flow, and liquid level must be between 116 and 156 mm before start-up. Discharge pressure monitoring (G2) must switch off the unit if 1.1 bar abs is exceeded. These monitoring paths must be independent, even when a PLC is used.
Use UNIREX N3 grease (or DIN 51825-K3N equivalent), filling approx. 50% of the free space in roller bearings and 65% of adjacent areas. For ATEX units, the interval is 2 years or 18,000 h and weekly dust removal is required. The operator may not perform work requiring dismantling.
Fill the pump with 1.0 L of operating liquid before start-up. Fit an intake strainer in the suction line for the first 100 operating hours to prevent installation residues from entering the unit. Maximum installation altitude is 1000 m above sea level without consultation.
Selection & Integration Q&A
Choose the 2BV2071 when you need 500 m³/h at 50 Hz (575 m³/h at 60 Hz) and a 7.3 kW motor. The 2BV2060/2061 use 3.0–3.5 kW motors. The 2BV2071 is available in a higher corrosion-resistance/hygiene construction (together with the 2BV2070 and 2BV5.. types); the standard design is cast iron RAL 9006, with all-stainless variants pickled and passivated.
Provide a flow limiter set to the design flow for the 2BV207. size (first fill 1.0 L). Piping must withstand 1.1 bar abs discharge in vacuum operation and be tightened to max 100 Nm. For ATEX, add independent feed monitoring tripping at ≤50% design flow and discharge pressure switch G2.
Ambient temperature must stay between +5 °C and +40 °C; the IP55 motor is protected against dust and water jets but the pump is not weatherproof. Maximum installation altitude is 1000 m above sea level; consult the manufacturer above this. Ensure 53 mm clearance around the fan guard.
Base delivery excludes suction strainer, liquid separator, flow limiter and monitoring sensors. Fit an intake strainer for the first 100 h. Re-grease or replace bearings every 2.5 years or 20,000 h with UNIREX N3 grease. ATEX units need independent feed/level sensors and pressure switch G2.