Elmo Rietschle 2BV2070
Elmo Rietschle ·Made in Germany · In Active Production

Elmo Rietschle 2BV2070

Elmo Rietschle 2BV2070 — Liquid Ring Vacuum Pumps with Max inlet pressure 101.3 kPa, Motor power 7.3 kW, Pumping speed 70 m³/h.

Single-stage liquid ring vacuum pump 2BV2070 with 7.3 kW AC motor, rated 70 m³/h at both 50 and 60 Hz and IP55 protection. It sits between the 3 kW 2BV2060/2061 and the 8.6 kW 2BV2071 in the L-BV2 series, and is one of the few types available in stainless-steel and higher-corrosion/hygiene construction. Used for continuous wet-vacuum duty where the operating liquid also absorbs heat and condensable vapours.

Max inlet pressure
101.3 kPa
Motor power
7.3 kW
Pumping speed
70 m³/h

Elmo Rietschle L-BV2 Series — Model Comparison & Selection

Model Motor power, kWOperating principlePumping speed, m³/hNoise level, dBPower supplyWeight, kg
2BV2070 Current 7.3Liquid ring7070AC49
2BV2060 3.5Liquid ring vacuum pump—653~ 50/60 Hz28
2BV2061 3Liquid ring2765AC26
2BV2071 7.3Liquid ring50061AC64

Full specifications

Core Performance & Functional Specifications
Max inlet pressure 1013 mbar
Motor power 7.3 kW
Operating principle Liquid ring
Pumping speed 70 m³/h (50 Hz)
60 Hz: 70 m³/h
Compression ratio 1.00 dimensionless
Dimensions, Weight & Mechanical Design
Number of stages 1 dimensionless
Weight 49 kg
Electrical, Power & Drive Specifications
Power supply AC
Operating Conditions, Environment & Protection
Noise level 70 dB (50 Hz)
60 Hz: 70 dB
Operating temperature 20 °C
Protection rating IP55

Description

Construction and series position

Behaviour under load and media limits

Installation, connection and control

Integration & Operating Notes

Process Limits
Keep suction pressure above vapour pressure to avoid cavitation

The minimum achievable suction pressure is bounded by the vapour pressure of the operating liquid; the manual notes cavitation at the limit. In ATEX duty the suction pressure must stay at least 50 mbar above the vapour pressure, otherwise the manufacturer must be consulted. Set the process vacuum accordingly and monitor operating-liquid temperature, since it shifts vapour pressure.

Operating Instructions — L-BV2, Technical data, page 10; Operating Instructions — L-BV2 ATEX, Concerning 3.3
Process Limits
Do not exceed 1.1 bar abs discharge in vacuum duty

With design operating-liquid flow maintained, discharge pressure in vacuum operation must stay at or below 1.1 bar abs for 2BV2 series types; the maximum permissible internal pressure is 8 bar abs. Discharge-side throttling or a blocked line can push past this, so provide pressure protection if the system can generate higher pressures.

Operating Instructions — L-BV2, Technical data, page 10
Mounting
Respect 53 mm fan clearance and 1000 m altitude limit

The 2BV2070 frame needs 53 mm minimum clearance around the fan guard for heat dissipation; enclosing it or mounting tight to a wall risks overheating. Maximum installation altitude is 1000 m above sea level — consult the service department above that. Vibration velocity at the measuring points must stay below 4.5 mm/s.

Operating Instructions — L-BV2, Technical data, page 8; Installation, page 15
Mounting
Cap piping torque at 100 Nm on suction and discharge

Tightening torque for piping connections to the suction and discharge branches must not exceed 100 Nm. Over-tightening can damage the connections or the casing, particularly on the ceramic-coated and CrNi variants. Use appropriate seals and support the piping so the pump body does not carry line loads.

Operating Instructions — L-BV2, Installation, page 16
Electrical
Verify supply within ±5 % voltage and ±2 % frequency

The motor is rated for ±5 % voltage variation and ±2 % frequency deviation without loss of performance. Before commissioning, check motor insulation resistance and dry the windings if it is ≤1 kΩ per volt of measurement potential. In the terminal box keep at least 5.5 mm air gap between non-insulated energized parts and to earth at UN ≤690 V.

Operating Instructions — L-BV2, Installation, pages 18–19; Commissioning, page 20
Control & I/O
VFD speed window is 2123–3715 min⁻¹ for this frame

Standard 2BV2070/2071 units may be run from a frequency converter only within 2123–3715 min⁻¹; exceeding this risks mechanical damage. On ATEX versions frequency-converter operation is explicitly not permitted, so the motor must be connected directly to the supply. Confirm the drive's maximum frequency maps inside the window before commissioning.

Operating Instructions — L-BV2, Technical data, page 9; Operating Instructions — L-BV2 ATEX, Concerning 5.3.2
Control & I/O
ATEX units need independent liquid-feed, level and discharge-pressure monitoring

For ATEX duty, monitoring of operating-liquid feed, liquid level and discharge pressure must be fully functional and independent of one another, even under computer-programmed control. The flow monitor trips at ≤50 % of design flow, the temperature sensor at ≥60 °C, and the pressure switch downstream of the gas outlet must shut the unit off above p2 max. Liquid level must lie within the 95/120 mm window for the 2BV2070 before start-up.

Operating Instructions — L-BV2 ATEX, Concerning 5.3.2; Operating Instructions — L-BV2, Commissioning, page 20

Selection & Integration Q&A

When should I choose the 2BV2070 rather than the 2BV2060/2061 or the 2BV2071?

Pick the 2BV2070 when you need about 70 m³/h at 50 or 60 Hz with a 7.3 kW motor. The 2BV2060/2061 give only ~3 kW and ~55 m³/h; the 2BV2071 jumps to 8.6 kW. The 2070 is also the smallest frame offered in the higher corrosion-resistance/hygiene construction.

What must I provide on the suction and discharge side for this pump to work correctly?

Connect suction and discharge piping with tightening torque ≤100 Nm, fit an intake strainer for the first 100 operating hours, and ensure liquid separation keeps water carry-over within 2.5× design flow continuous (7× for max 2 s). Provide continuous operating-liquid feed with a flow limiter set to design flow, and first fill of 1.0 L.

Can I run this pump on a frequency converter, and what are the mounting limits?

Standard units may use a VFD only within 2123–3715 min⁻¹; ATEX versions forbid VFD operation entirely. Mount with 53 mm clearance around the fan guard, at altitudes up to 1000 m, ambient +5 to +40 °C, and keep vibration velocity below 4.5 mm/s.

What maintenance and consumables are needed beyond the base delivery?

Budget for bearing service every 2.5 years or 20,000 h (2 years/18,000 h on ATEX) with UNIREX N3 or DIN 51825-K3N grease, an intake strainer for the first 100 operating hours, and operating liquid at +5 to +80 °C. ATEX installations also need independent flow, level and discharge-pressure monitoring.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
Operating Instructions — L-BV2 (EN)
Manual ·1,9 МБ ·32 pp.
View PDF
PDF
Technical Data Sheet — L-BV2 2BV2070 IE3 compressor (EN)
Datasheet ·386,8 КБ ·3 pp.
View PDF
PDF
Operating Instructions — L-BV2 ATEX (EN)
Manual ·951,4 КБ ·12 pp.
View PDF